LEED v5, the latest version of LEED, is now available!
When new versions of LEED are introduced, earlier versions are gradually phased out to keep the market moving toward higher performance. With this evolution comes important changes in registration and certification timelines for LEED v4 and v4.1.
Timelines are identified in the tables below by:
- LEED v4 and LEED v4.1 including BD+C, ID+C, O+M and Recertification
- Certification pathways, including Campus/Master Site, Group and Volume
At any given point, LEED rating systems are either:
- Open for registration and certification, or
- Closed for registration, but open for certification, or
- Closed for registration and certification (sunset)
How long do you have to register or certify?
Use the table below to find the upcoming registration close dates and certification sunset dates for applicable LEED rating systems. Learn more about LEED deadlines in the Guide to LEED Certification. Projects pursuing LEED volume certification should also reference the Guide to LEED Certification: Volume supplement.
Deadlines per LEED version and rating system
| LEED version | LEED rating system | Registration close1 | Certification sunset2 |
|---|---|---|---|
| LEED v4 |
Building Design and Construction (BD+C)
|
6/30/2027 | 6/30/2033 |
| LEED v4 |
Interior Design and Construction (ID+C)
|
6/30/2027 | 6/30/2033 |
| LEED v4 |
Operations and Maintenance (O+M)
|
6/30/2027 | 6/30/2033 |
| LEED v4 |
O+M Recertification |
6/30/2027 |
6/30/2033 |
| LEED v4.1 |
Building Design and Construction (BD+C)
|
6/30/2027 | 6/30/2033 |
| LEED v4.1 |
Interior Design and Construction (ID+C)
|
6/30/2027 | 6/30/2033 |
| LEED v4.1 |
Operations and Maintenance (O+M)
|
6/30/2027 | 6/30/2033 |
| LEED v4.1 |
O+M Recertification |
6/30/2027 |
6/30/2033 |
| LEED v4.1 |
O+M: Interiors |
6/30/2027 |
6/30/2033 |
Deadlines for LEED v4 and LEED v4.1 pathways for Campus, Group and Volume
|
Certification Pathway |
Registration Type |
LEED Version |
LEED Rating System |
Registration Close |
Certification Sunset |
|---|---|---|---|---|---|
|
Campus / Master Site |
New Campus / Master Site |
LEED v4 LEED v4.1 |
BD+C ID+C O+M
|
6/30/2027 |
6/30/2033 |
|
Campus / Master Site |
New Campus Project, added to an existing Master Site |
LEED v4 LEED v4.1 |
BD+C ID+C O+M |
6/30/2027 |
6/30/2033 |
|
Group |
New Group Project |
LEED v4 LEED v4.1 |
BD+C ID+C O+M |
6/30/2027 |
6/30/2033 |
|
Volume |
New Prototype |
LEED v4 LEED v4.1 |
BD+C ID+C |
6/30/2027 |
6/30/2033 |
| Volume |
New Volume Project, referencing an existing Prototype |
LEED v4 LEED v4.1 |
BD+C ID+C |
6/30/20303 (exception to 6/30/2027 close date) |
6/30/2033 |
Closed LEED Rating Systems
The table below lists rating systems that have closed for both registration and certification.
| LEED version | LEED rating system | Registration close | Certification sunset |
|---|---|---|---|
| LEED v3 (2009) |
Building Design and Construction (BD+C)
|
10/31/2016 | 6/30/2022 |
| LEED v3 (2009) |
Interior Design and Construction (ID+C)
|
10/31/2016 | 6/30/2022 |
| LEED v3 (2009) |
Operations and Maintenance (O+M)
|
10/31/2016 | 6/30/2022 |
| LEED v3 (2009) |
Neighborhood Development
|
10/31/2016 | 6/30/2022 |
| LEED v2011 |
LEED India |
10/31/2016 | 6/30/2022 |
| LEED v2010 |
Building Design and Construction (BD+C)
|
10/31/2016 | 6/30/2022 |
| LEED v2008 |
Building Design and Construction (BD+C)
|
10/31/2016 | 6/30/2022 |
| LEED v2008 |
Operations and Maintenance (O+M)
|
6/27/2009 | 6/27/2015 |
| LEED v2007 |
Building Design and Construction (BD+C)
|
6/27/2009 | 6/27/2015 |
| LEED v2.0 |
Building Design and Construction (BD+C)
|
6/27/2009 | 6/27/2015 |
| LEED v2.0 |
Interior Design and Construction (ID+C)
|
6/27/2009 | 6/27/2015 |
| LEED v2.0 |
Operations and Maintenance (O+M)
|
5/31/2008 | 8/31/2014 |
| LEED v1.0 |
LEED India |
Closed | Closed |