The future of sustainable cities is here: Cast your vote on the new LEED v5 for Cities rating system. Vote now!

Yale 2 Science Park | LEED Silver | Photo: Svigals + Partners

Yale 2 Science Park

LEED v5, the latest version of LEED, is now available!

When new versions of LEED are introduced, earlier versions are gradually phased out to keep the market moving toward higher performance. With this evolution comes important changes in registration and certification timelines for LEED v4 and v4.1.

Timelines are identified in the tables below by:

At any given point, LEED rating systems are either:

  • Open for registration and certification, or
  • Closed for registration, but open for certification, or
  • Closed for registration and certification (sunset)

How long do you have to register or certify?

Use the table below to find the upcoming registration close dates and certification sunset dates for applicable LEED rating systems. Learn more about LEED deadlines in the Guide to LEED Certification. Projects pursuing LEED volume certification should also reference the Guide to LEED Certification: Volume supplement.

Deadlines per LEED version and rating system

LEED version LEED rating system Registration close1 Certification sunset2
LEED v4

Building Design and Construction (BD+C)

  • New Construction
  • Core and Shell
  • Schools
  • Retail
  • Healthcare
  • Data Centers
  • Hospitality
  • Warehouses and Distribution Centers
  • Transit
6/30/2027 6/30/2033
LEED v4

Interior Design and Construction (ID+C)

  • Commercial Interiors
  • Retail
  • Hospitality
6/30/2027 6/30/2033
LEED v4

Operations and Maintenance (O+M)

  • Existing Buildings
  • Data Centers
  • Warehouses and Distribution Centers
  • Hospitality
  • Schools
  • Retail
  • Transit
6/30/2027 6/30/2033
LEED v4

O+M Recertification

6/30/2027

6/30/2033
LEED v4.1

Building Design and Construction (BD+C)

  • New Construction
  • Core and Shell
  • Schools
  • Retail
  • Healthcare
  • Data Centers
  • Hospitality
  • Warehouses and Distribution Centers
6/30/2027 6/30/2033
LEED v4.1

Interior Design and Construction (ID+C)

  • Commercial Interiors
  • Retail
  • Hospitality
6/30/2027 6/30/2033
LEED v4.1

Operations and Maintenance (O+M)

  • Existing Buildings
6/30/2027 6/30/2033
LEED v4.1

O+M Recertification

6/30/2027

6/30/2033
LEED v4.1

O+M: Interiors

6/30/2027

6/30/2033

 

Deadlines for LEED v4 and LEED v4.1 pathways for Campus, Group and Volume

Certification Pathway

Registration Type

LEED Version

LEED Rating System

Registration Close

Certification Sunset

Campus / Master Site

New Campus / Master  Site

LEED v4   LEED v4.1

BD+C      ID+C        O+M

 

6/30/2027

6/30/2033

Campus / Master Site

New Campus Project, added to an existing Master Site

LEED v4   LEED v4.1

BD+C      ID+C        O+M

6/30/2027 

 6/30/2033

Group

New Group Project

LEED v4   LEED v4.1

BD+C      ID+C        O+M

6/30/2027

6/30/2033

Volume

New Prototype

LEED v4   LEED v4.1

BD+C      ID+C

6/30/2027

6/30/2033

Volume

New Volume Project, referencing an existing Prototype

LEED v4   LEED v4.1

BD+C      ID+C

6/30/20303  (exception to 6/30/2027 close date)

6/30/2033

           

Closed LEED Rating Systems

The table below lists rating systems that have closed for both registration and certification.

LEED version LEED rating system Registration close Certification sunset
LEED v3 (2009)

Building Design and Construction (BD+C)

  • New Construction (and Italia NC)
  • Core and Shell
  • Schools
  • Retail
  • Healthcare
10/31/2016 6/30/2022
LEED v3 (2009)

Interior Design and Construction (ID+C)

  • Commercial Interiors
  • Retail
  • Hospitality
10/31/2016 6/30/2022
LEED v3 (2009)

Operations and Maintenance (O+M)

  • Existing Buildings
10/31/2016 6/30/2022
LEED v3 (2009)

Neighborhood Development

  • Plan
  • Built Project
10/31/2016 6/30/2022
LEED v2011

LEED India

10/31/2016 6/30/2022
LEED v2010

Building Design and Construction (BD+C)

  • Multifamily Midrise
10/31/2016 6/30/2022
LEED v2008

Building Design and Construction (BD+C)

  • Homes
10/31/2016 6/30/2022
LEED v2008

Operations and Maintenance (O+M)

  • Existing Buildings
6/27/2009 6/27/2015
LEED v2007

Building Design and Construction (BD+C)

  • Schools
6/27/2009 6/27/2015
LEED v2.0

Building Design and Construction (BD+C)

  • New Construction v2.2
  • Core and Shell
6/27/2009 6/27/2015
LEED v2.0

Interior Design and Construction (ID+C)

  • Commercial Interiors
6/27/2009 6/27/2015
LEED v2.0

Operations and Maintenance (O+M)

  • Existing Buildings
5/31/2008 8/31/2014
LEED v1.0

LEED India

Closed Closed

 

 

 

Logging out the application..