Table 3 Tasks A,B, and C are not schedulable by the priority ceiling pro-
Related Figures (6)
Figure 1: Schematic overview of hybrid scheduling. The initial set of tasks analysis. Figure | illustrates. time within its period of 500 units. Figure 4: Worst-case phasing of tasks after combining tasks A and B requires less run-time overhead. Figure 5: An example of task combination with a “run-to-completion” policy dispatch mechanism can be used for the combined task AB. Figure 6: Period transformation of tasks A and B has the same effect as