Academia.eduAcademia.edu

Fig. 7: Large scale structure to be inspected: The 405m high Central Radio & TV Tower in Beijing. The mesh used to compute the path contains 1701 triangular facets. After a computation time of 92s the cost for the inspection is 2997.44s with a maximal speed of 2m/s and a maximal yaw rate of 0.5rad/s. The red point denotes, start— and end-point of the inspection.  in the experimental studies presented in subsections VI-B and VI-C.

Figure 7 Large scale structure to be inspected: The 405m high Central Radio & TV Tower in Beijing. The mesh used to compute the path contains 1701 triangular facets. After a computation time of 92s the cost for the inspection is 2997.44s with a maximal speed of 2m/s and a maximal yaw rate of 0.5rad/s. The red point denotes, start— and end-point of the inspection. in the experimental studies presented in subsections VI-B and VI-C.