To reduce traffic congestion at an at-grade intersection near a big city, one method is
construct... more To reduce traffic congestion at an at-grade intersection near a big city, one method is
construction a flyover bridge at the old junction in two directions on one of the main
highways. The flyover facilitates the traffic flow in the directions of the bridge, but the
infrastructure cannot fully solve all of the problems especially on the secondary road. Under
the bridge, although it relieves the traffic congestion at the intersection; the traffic signal
still uses the same control as the “before” situation, that is the fixed time control plan. With
the flyover bridge in place, it was found that about 30-35% of all traffic volumes diverted to
the bridges, and time delay reduced by 30% over the same period. This paper which is one
part of the first author’s thesis presents the issues that still exist at the flyover-improved
junction and makes suggestions to increase the benefits of the flyover such as creating a
new cycle and phase times and improving the physical area under the bridge.
Keywords: Flyover, Bridge design, Pile foundation, Rig machine, Correction,
Comparison
Uploads
Papers by GUNDLURU AMRUTHA
construction a flyover bridge at the old junction in two directions on one of the main
highways. The flyover facilitates the traffic flow in the directions of the bridge, but the
infrastructure cannot fully solve all of the problems especially on the secondary road. Under
the bridge, although it relieves the traffic congestion at the intersection; the traffic signal
still uses the same control as the “before” situation, that is the fixed time control plan. With
the flyover bridge in place, it was found that about 30-35% of all traffic volumes diverted to
the bridges, and time delay reduced by 30% over the same period. This paper which is one
part of the first author’s thesis presents the issues that still exist at the flyover-improved
junction and makes suggestions to increase the benefits of the flyover such as creating a
new cycle and phase times and improving the physical area under the bridge.
Keywords: Flyover, Bridge design, Pile foundation, Rig machine, Correction,
Comparison
construction a flyover bridge at the old junction in two directions on one of the main
highways. The flyover facilitates the traffic flow in the directions of the bridge, but the
infrastructure cannot fully solve all of the problems especially on the secondary road. Under
the bridge, although it relieves the traffic congestion at the intersection; the traffic signal
still uses the same control as the “before” situation, that is the fixed time control plan. With
the flyover bridge in place, it was found that about 30-35% of all traffic volumes diverted to
the bridges, and time delay reduced by 30% over the same period. This paper which is one
part of the first author’s thesis presents the issues that still exist at the flyover-improved
junction and makes suggestions to increase the benefits of the flyover such as creating a
new cycle and phase times and improving the physical area under the bridge.