Papers by Donny Montreano

Jurnal Manajemen Industri dan Logistik
The 4.0 industrial revolution created opportunities for MSMEs in rural areas to build and develop... more The 4.0 industrial revolution created opportunities for MSMEs in rural areas to build and develop marketing networks on a wide and efficient scale. Applying digitization in a village will have an impact on the potential of what is not yet known in general. This study discusses the design of Android applications that are expected to provide new experiences to visitors to find out the potential of the village that has not been exposed. The contribution of this research is to examine the application design model that evaluates in two villages with different cultures and potentials, namely Ponggok Klaten Village and Kadubungbang Pandeglang Village. The results of QFD and AHP can help applications that are flexible to the village as well as visitor application needs and application priority features. Of the different features, because there are indeed differences between villages with different topography.AbstrakRevolusi industri 4.0 menciptakan peluang bagi UMKM di daerah pedesaan untuk...

Jurnal Ilmiah Giga
Potensi sumber daya perikanan laut Indonesia besarnya ± 6.6 juta ton/tahun, tetapi baru sebagian ... more Potensi sumber daya perikanan laut Indonesia besarnya ± 6.6 juta ton/tahun, tetapi baru sebagian yang dapat ditangkap oleh nelayan Indonesia yaitu ± 4.7 juta ton/tahun, sebagian lagi dicuri oleh nelayan-nelayan negara tetangga (ilegal fishing). Hal ini disebabkan terbatasnya jumlah dan besar ukuran kapal ikan yang beroperasi. Salah satu wilayah yang mempunyai potensi perikanan tangkap adalah Kecamatan Pakuhaji Kabupaten Tangerang Provinsi Banten. Kecamatan Pakuhaji mempunyai wilayah pesisir yang berhadapan langsung dengan Laut Jawa. Wilayah ini memiliki garis pantai ± 6 (enam) kilometer. Wilayah ini terdapat Pangkalan Pendaratan Ikan (PPI) Cituis, tepatnya berada di Desa Surya Bahari. Dalam rangka meningkatkan kemampuan para nelayan di Kecamatan Pakuhaji Kabupaten Tangerang, maka perlu pada kapal penangkap ikan dipasang sistem perlistrikan dengan menggunakan energi surya. Apabila pemasangan sistem tersebut pada kapal penangkap ikan tersebut dapat terealisasi, maka pada gilirannya ke...
Journal of Physics: Conference Series
JIEMS (Journal of Industrial Engineering and Management Systems)
The purpose of this research is to describe multi-item ordering method (Goyal, 1974) by providing... more The purpose of this research is to describe multi-item ordering method (Goyal, 1974) by providing a complete information of algorithm on each step. The journal itself doesn’t contain sufficient information on its example, and there is an error on a simple calculation. We observed a pulp manufacturer as raw material for making paper, tissue, printing paper and non-printing paper. There were 3 materials that purchased from a supplier and had been overstock in 2016. The materials will be examined by this method in order to reduce overstock. The results are shows that there is about 91% of the total inventory cost discrepancy between that period of total inventory cost and these methods of total inventory cost. This cost saving can be used for other investigation, for example, Indonesian Ritel Obligation or stock exchange.

International Journal of Community Service Learning
Pemerintah menargetkan 10.300 desa teraliri listrik pada 2019. Pada 2019, peningkatan rasio elekt... more Pemerintah menargetkan 10.300 desa teraliri listrik pada 2019. Pada 2019, peningkatan rasio elektrifikasi nasional ditargetkan menjadi 97 persen. Melalui Kementerian Energi dan Sumber Daya Mineral (ESDM), meluncurkan Program Indonesia Terang (PIT) dalam rangka memenuhi target peningkatan rasio elektrifikasi nasional dari 85 persen pada tahun 2015 menjadi 97 persen di tahun 2019. PIT juga menjadi bagian dari target pemerintah yang menyediakan akses penerangan bagi masyarakat Indonesia secara merata melalui pembangunan pembangkit 35.000 MW. Dalam rilis pers Kementerian ESDM pada 28 Februari 2016, disebutkan bahwa hingga saat ini, masih ada 12.659 desa tertinggal yang belum memperoleh akses listrik dari jaringan Perusahaan Listrik Negara (PLN), bahkan 2.519 desa diantaranya belum terlistriki sama sekali. Desa-desa ini sebagian besar tersebar di Provinsi Papua dan di kawasan Indonesia Timur lainnya. Populasi penduduk rata-rata sedikit dengan tingkat kepadatan yang rendah, akibatnya memb...
Uploads
Papers by Donny Montreano