Point work finished!

I don’t think I ever thought I’d be able to manage it, but Cwm Prysor’s point work is completed. I’m very pleased with the results and the appearance. The soldering of the tiebar to the switch blades was interesting, but they now work well. The point operation will be manual, using Ken Gibbon’s method with …

Design a site like this with WordPress.com
Get started