Cwm Prysor – Fully Wired!

Good Morning all! Very brief update. The layout is now fully operational! I’m extremely pleased I’ve managed to do it (wiring was something I didn’t think I’d be able to do) and with some advice from Ken Gibbons and Andy Jones, the process wasn’t as difficult as I thought. Below is a quick video I …

Point work finished!

I don’t think I ever thought I’d be able to manage it, but Cwm Prysor’s point work is completed. I’m very pleased with the results and the appearance. The soldering of the tiebar to the switch blades was interesting, but they now work well. The point operation will be manual, using Ken Gibbon’s method with …

On Track – Part 2

Mr Cooper visited today, and work commenced swiftly. I finished off adding sleepers to the trap points, while Andy made up both point crossing Vees. Yours truly did the mundane (yet rewarding job) of adding Exactoscale chairs to lengths of rail….and supplying lots of coffee! With the Vee’s made and fixed in place, the task …

Design a site like this with WordPress.com
Get started