Point work finished!

I don’t think I ever thought I’d be able to manage it, but Cwm Prysor’s point work is completed. I’m very pleased with the results and the appearance. The soldering of the tiebar to the switch blades was interesting, but they now work well. The point operation will be manual, using Ken Gibbon’s method with …

On Track-Part 1

On this coming Saturday, Mr Andy Cooper is visiting to kindly give me a hand building the points on Cwm Prysor. I’ve never done this before so it will be a good learning experience. Andy set me my homework, to glue the timber sleepers into place, which makes things a lot easier come the weekend. …

Design a site like this with WordPress.com
Get started