Ian F J Nash
Ian Nash has been Managing Director of EAME region from August 2015, previously he held the position of Director of Operations and Business Acquisitions for Peritus since the company’s’ commencement in Jan 2010. Prior to Peritus Ian was the Operations Director for the UK Office of INTECSEA where he was responsible for oversight and day to day running of the UK office with 130 personnel; liaison with Head Office and other INTECSEA global offices. Previously to this role Ian was INTECSEA’s Engineering Manager responsible for over-sight of Engineering and Project Management within the UK office.
Ian has 31 years general engineering experience, the last 28 of which have been specialised in subsea engineering and offshore pipeline design and installation. Sub-sea/pipelines experience includes Project Sponsor for the FEED Optimisation of Mamba Straddling development in Block 4 offshore Mozambique. Project manager for the detailed design of pipelines, offline structures and tie-in spools of the ultra-deepwater 24”/20” Rota 3 system in Brasil; Project Manager for the detailed design of ultra-deepwater PIP production flowlines, service lines and associated structures for Angola Block 31 PSVM Development; Project Manager for the detailed design of Europipe 2 42” Gas Pipeline from Norway to Germany; Project Engineering Manager for the engineering and installation of the Canyon Express development of 3 subsea fields in 2200m water depth; Project Manager for the FEED of MedGaz 2x24” pipeline system from Algeria to Spain crossing numerous fault zones and subsea canyons, and other detailed and conceptual engineering projects, and installation activities.
Ian has project management experience in liaison with clients, progress reporting, man-hour tracking, bid preparation, cost estimation, bid evaluation and contracting strategy. He has also been responsible for man-hour and schedule estimation and design narrative preparation for design tenders. Ian has experience in the performance of HAZID’s for design and installation aspects of pipeline and subsea facilities and has acted as HAZID chairman on several occasions. Ian has also written and presented papers on deep and ultra deepwater developments at numerous international conferences.
Phone: +441483312800
Address: Peritus International
Export House Cawsey Way
Ian has 31 years general engineering experience, the last 28 of which have been specialised in subsea engineering and offshore pipeline design and installation. Sub-sea/pipelines experience includes Project Sponsor for the FEED Optimisation of Mamba Straddling development in Block 4 offshore Mozambique. Project manager for the detailed design of pipelines, offline structures and tie-in spools of the ultra-deepwater 24”/20” Rota 3 system in Brasil; Project Manager for the detailed design of ultra-deepwater PIP production flowlines, service lines and associated structures for Angola Block 31 PSVM Development; Project Manager for the detailed design of Europipe 2 42” Gas Pipeline from Norway to Germany; Project Engineering Manager for the engineering and installation of the Canyon Express development of 3 subsea fields in 2200m water depth; Project Manager for the FEED of MedGaz 2x24” pipeline system from Algeria to Spain crossing numerous fault zones and subsea canyons, and other detailed and conceptual engineering projects, and installation activities.
Ian has project management experience in liaison with clients, progress reporting, man-hour tracking, bid preparation, cost estimation, bid evaluation and contracting strategy. He has also been responsible for man-hour and schedule estimation and design narrative preparation for design tenders. Ian has experience in the performance of HAZID’s for design and installation aspects of pipeline and subsea facilities and has acted as HAZID chairman on several occasions. Ian has also written and presented papers on deep and ultra deepwater developments at numerous international conferences.
Phone: +441483312800
Address: Peritus International
Export House Cawsey Way
less
Related Authors
Gabriel Gutierrez-Alonso
University of Salamanca
Hany Elosta
University of Strathclyde, Glasgow
Paul Evans
Cardiff University
Beata Gruszka
Adam Mickiewicz University in Poznań
Stephen W Merkel
Vrije Universiteit Amsterdam
William Philpot
Cornell University
Wiwin Windupranata
Institut Teknologi Bandung
ibitoru dick
RIVERS STATE UNIVERSITY OF SCIENCE AND TECHNOLOGY
Nasrul Salman
NanTong University
Uploads
Papers by Ian F J Nash
Author Name(s): Christopher J. Burnett, Ian F. J. Nash, Simon G. Parry
Peritus International Limited
Woking, Surrey, United Kingdom
Abstract
The Middle East to India Pipeline (MEIDP) will provide an economic and secure source of gas for India, where the demand for energy will continue to increase over the coming decades. The proposed pipeline will be the deepest major infrastructure pipeline laid with water depths exceeding 3000m for significant sections of the 1200km route. In addition to its depth the MEIDP will have to contend with significant potential geohazards, namely the Indian and Omani continental slopes, the Indus Fan channels and the Owen Fracture Zone.
At the Owen Fracture Zone (OFZ) the MEIDP crosses the continental plate boundary between the Arabian and Indian tectonic plates, which meet forming a right lateral strike slip fault movement zone. The movement on the plate boundary will be investigated and examples of survey data will demonstrate the challenges that need to be overcome in crossing this major geohazard feature. At the Indus fan the MEIDP route crosses deep channel/levee system that are characterized by central channels with a series of adjacent terraces and numerous abandoned channel loops, which are partially refilled by the overspill sediments from active canyon areas. The pipeline route crosses five turbidity current channels with side walls up to 200m high, in water depths between 2100m - 3200m, with channel side slopes up to 25.
This paper reviews the findings of the 2013 geophysical reconnaissance survey in these two areas and summarises the geohazard design process required and work performed on the project to identify a feasible route across the Owen Fracture Zone (OFZ) and the crossing of the Indus Fan Channels. It also gives general guidelines for suitable design solutions for dealing with fault crossings; debris & turbidity current flow, slope stability and run-out.