Papers by Ishom Ahmad
Thesis Chapters by Ishom Ahmad

Tukad Mati River is one of the most important rivers in Bali, has a main river length of 18.52 Km... more Tukad Mati River is one of the most important rivers in Bali, has a main river length of 18.52 Km and 38.42 Km2 of Watershed Area. Flood is a problem that occurs in the Tukad Mati, flood control building becomes an important parameter to conduct a study. There are five flood control buildings along the river that includes Lange Dam, Tegeh Dam, Dadas Dam, Umadui Dam and Trashrack Tukad Mati
The design flood for the 50th of the HSS Nakayasu method obtained by Tegeh Dam was unable to accept the maximum debit of 1.7 m3/dt. Of the five flood control buildings are all functioning and in good condition, except the condition of Body Tegeh Dam in a state of broken and unkempt.
The many aspects that are taken into account to improve the Tegeh Dam, such as the Tegeh dam has not been functioned to irrigate irrigation because it has been replaced by the function of Lange Dam and also the function of the surrounding land so that to repair the dam is considered inefficient. So the right solution to overcome the problem in the dam of Tegeh according to the current condition is done dismantling the weir because in terms of function and feasibility is not meet the existing criteria.
Keywords : Building, Flood, existing condition, Dam
Uploads
Papers by Ishom Ahmad
Thesis Chapters by Ishom Ahmad
The design flood for the 50th of the HSS Nakayasu method obtained by Tegeh Dam was unable to accept the maximum debit of 1.7 m3/dt. Of the five flood control buildings are all functioning and in good condition, except the condition of Body Tegeh Dam in a state of broken and unkempt.
The many aspects that are taken into account to improve the Tegeh Dam, such as the Tegeh dam has not been functioned to irrigate irrigation because it has been replaced by the function of Lange Dam and also the function of the surrounding land so that to repair the dam is considered inefficient. So the right solution to overcome the problem in the dam of Tegeh according to the current condition is done dismantling the weir because in terms of function and feasibility is not meet the existing criteria.
Keywords : Building, Flood, existing condition, Dam
The design flood for the 50th of the HSS Nakayasu method obtained by Tegeh Dam was unable to accept the maximum debit of 1.7 m3/dt. Of the five flood control buildings are all functioning and in good condition, except the condition of Body Tegeh Dam in a state of broken and unkempt.
The many aspects that are taken into account to improve the Tegeh Dam, such as the Tegeh dam has not been functioned to irrigate irrigation because it has been replaced by the function of Lange Dam and also the function of the surrounding land so that to repair the dam is considered inefficient. So the right solution to overcome the problem in the dam of Tegeh according to the current condition is done dismantling the weir because in terms of function and feasibility is not meet the existing criteria.
Keywords : Building, Flood, existing condition, Dam