Page MenuHomePhabricator

ECT-October-2014Timeline
ArchivedPublic

Members (4)

Watchers (1)

Details

Description

A monthly sprint of the Engineering Community team.

Recent Activity

Apr 3 2020

Aklapper renamed T569: October 22 2014, Wikimedia Tech Meetup from October 22, Wikimedia Tech Meetup to October 22 2014, Wikimedia Tech Meetup.
Apr 3 2020, 2:28 PM · ECT-October-2014

Mar 7 2018

demon closed T167: Align basics of current Gerrit code-review process with Differential, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Declined.
Mar 7 2018, 10:13 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
demon closed T92493: Train L10n-bot to work with repositories hosted in Wikimedia Phabricator (Diffusion), a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Declined.
Mar 7 2018, 10:11 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Jan 18 2017

Volker_E closed T832: Migration of the Design team to Phabricator, a subtask of T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator, as Resolved.
Jan 18 2017, 11:36 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014

Aug 13 2016

Phabricator_maintenance added a project to T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator: Goal.
Aug 13 2016, 8:39 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014
Phabricator_maintenance added a project to T558: Goal: Common project management guidelines to be followed by teams and individual contributors are published: Goal.
Aug 13 2016, 8:39 PM · Goal, Team-Practices (This-Week), ECT-December-2014, ECT-November-2014, Project-Management, ECT-October-2014

Jun 22 2016

mmodell closed T31: [keyresult] Connect Differential code review with continuous integration, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Resolved.
Jun 22 2016, 8:03 AM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Mar 15 2016

greg moved T584: Define main tasks (epics) for code review in Phabricator from Documentation to Done/Archive on the Gerrit-Migration board.
Mar 15 2016, 9:28 PM · User-greg, Gerrit-Migration, ECT-October-2014

Dec 2 2015

greg closed T1009: Define a process to import and create repositories, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Resolved.
Dec 2 2015, 6:51 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
Qgil added a comment to T584: Define main tasks (epics) for code review in Phabricator.

Not that it matters but yes, I agree that the purpose of this task has been superseded by Gerrit-Migration. When this task was created, our brains were still filled with lots of question marks about the Bugzilla migration, several of them affecting a fuzzier Gerrit migration. The purpose was to have a high level overview of the work that would need to be done, well before a team would commit to start working on it.

Dec 2 2015, 11:48 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg closed T584: Define main tasks (epics) for code review in Phabricator as Resolved.

As such, marking as done. If you're curious about "What needs to happen to get this done?" go to the Gerrit-Migration workboard.

Dec 2 2015, 1:23 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg closed T584: Define main tasks (epics) for code review in Phabricator, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Resolved.
Dec 2 2015, 1:23 AM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
Jdforrester-WMF added a comment to T584: Define main tasks (epics) for code review in Phabricator.
In T584#1843538, @greg wrote:

So, I'm still not sure of the usefullness of this. The original intent, I believe, was to get an idea of how 'hard' it was going to be to do this. (iow: "We have 5 epics worth of work, that's 5 x $some_multiple so $some_number_of_months worth of work.") We (RelEng) aren't that sophisticated yet in our forecasting (shame on us, can we get a TPG team member on our team?) and we're plugging ahead (of course, with the RFC (T119908) leading us).

Given 1) the original intent, 2) the current reality of how RelEng works, and 3) the fact that the Gerrit-Migration project is (mostly) well groomed and (mostly) only contains real blockers of the migration... I recommend that this task be closed/resolved.

I will say, while I think this task ran it's course, it was useful and a lot of good work was done to get us to where we are now. Thanks all. :)

Dec 2 2015, 1:19 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg added a comment to T584: Define main tasks (epics) for code review in Phabricator.

So, I'm still not sure of the usefullness of this. The original intent, I believe, was to get an idea of how 'hard' it was going to be to do this. (iow: "We have 5 epics worth of work, that's 5 x $some_multiple so $some_number_of_months worth of work.") We (RelEng) aren't that sophisticated yet in our forecasting (shame on us, can we get a TPG team member on our team?) and we're plugging ahead (of course, with the RFC (T119908) leading us).

Dec 2 2015, 1:12 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg moved T584: Define main tasks (epics) for code review in Phabricator from Tooling to Documentation on the Gerrit-Migration board.
Dec 2 2015, 12:25 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg raised the priority of T584: Define main tasks (epics) for code review in Phabricator from Low to Medium.
Dec 2 2015, 12:23 AM · User-greg, Gerrit-Migration, ECT-October-2014
greg updated the task description for T584: Define main tasks (epics) for code review in Phabricator.
Dec 2 2015, 12:23 AM · User-greg, Gerrit-Migration, ECT-October-2014

Dec 1 2015

greg closed T560: Proof of concept of code review in Phabricator, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Resolved.
Dec 1 2015, 4:41 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Oct 22 2015

greg closed T597: Identify Arcanist showstoppers for wikimedians, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Resolved.
Oct 22 2015, 9:38 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Sep 25 2015

Niharika closed T717: Wrap-up GSoC 2014 and FOSS OPW round 8 as Resolved.

Not all interns published their wrap-up reports. The lesson learnt here is that we should not officially "Pass" a project until wrap-up reports are complete and have been looked over by the mentors.

Sep 25 2015, 9:20 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Sep 24 2015

greg moved T18: Plan to migrate code review from Gerrit to Phabricator from Tooling to Done/Archive on the Gerrit-Migration board.
Sep 24 2015, 11:34 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Sep 17 2015

Qgil removed a parent task for T18: Plan to migrate code review from Gerrit to Phabricator: T38269: Implement a real way to request new repositories.
Sep 17 2015, 9:04 AM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Sep 16 2015

Niharika updated the task description for T717: Wrap-up GSoC 2014 and FOSS OPW round 8.
Sep 16 2015, 9:43 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Niharika added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.

I agree. I made an attempt to dig up the final reports/blogposts for our OPW interns some time ago and added my findings to that page. I don't think there's a point pursuing this further.

Sep 16 2015, 9:41 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Sep 15 2015

Qgil added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.

I propose to resolve this task in whatever status it is by the end of this month.

Sep 15 2015, 11:02 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Sep 3 2015

greg updated subscribers of T584: Define main tasks (epics) for code review in Phabricator.
Sep 3 2015, 7:16 PM · User-greg, Gerrit-Migration, ECT-October-2014
greg merged task T18: Plan to migrate code review from Gerrit to Phabricator into T584: Define main tasks (epics) for code review in Phabricator.
Sep 3 2015, 7:16 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
Qgil added a comment to T18: Plan to migrate code review from Gerrit to Phabricator.

At this point lists of blockers / blocked by in this task are quite arbitrary. If T584 is a good starting point then yes, by all means, let's close this task and let's be all subscribed to that one.

Sep 3 2015, 7:06 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
greg closed T76446: Revise phabricator.wikimedia.org service level, a subtask of T18: Plan to migrate code review from Gerrit to Phabricator, as Declined.
Sep 3 2015, 6:30 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
greg added a comment to T18: Plan to migrate code review from Gerrit to Phabricator.

I posit that this task has become mostly non-useful and instead people who are interested in 'what's the plan to migrate to Differential from Gerrit' should look at the workdboard: https://phabricator.wikimedia.org/tag/gerrit-migration/

Sep 3 2015, 6:24 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Sep 1 2015

Qgil moved T717: Wrap-up GSoC 2014 and FOSS OPW round 8 from Backlog to Doing on the DevRel-September-2015 board.
Sep 1 2015, 12:31 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Qgil added a project to T717: Wrap-up GSoC 2014 and FOSS OPW round 8: DevRel-September-2015.
Sep 1 2015, 12:26 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Aug 14 2015

Dbrant closed T851: Migration of Mobile Apps team to Phabricator, a subtask of T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator, as Resolved.
Aug 14 2015, 1:42 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014
Qgil removed a project from T717: Wrap-up GSoC 2014 and FOSS OPW round 8: WMF-Human-Resources.
Aug 14 2015, 9:02 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Jul 29 2015

Qgil added a project to T717: Wrap-up GSoC 2014 and FOSS OPW round 8: ECT-August-2015.
Jul 29 2015, 9:08 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Jul 7 2015

Qgil moved T717: Wrap-up GSoC 2014 and FOSS OPW round 8 from To triage to July-September 2015 on the Developer-Advocacy board.
Jul 7 2015, 11:25 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Jun 30 2015

Qgil removed a parent task for T18: Plan to migrate code review from Gerrit to Phabricator: T830: Migration of Mobile Web team to Phabricator.
Jun 30 2015, 10:06 PM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC
Jdlrobson closed T830: Migration of Mobile Web team to Phabricator, a subtask of T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator, as Resolved.
Jun 30 2015, 8:43 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014
Niharika added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.
In T717#1410967, @Mvolz wrote:

I'm wondering if maybe some students think they've met this requirement, or actually have already and it's not been recorded in the checklist?

I've not been checked off the list here, but I did both a wrap up report and a wrap up blog post at the time of the internship so I've largely thought this post did not apply to me, until I noticed my name wasn't checked off today.

Jun 30 2015, 8:53 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Jun 29 2015

01tonythomas added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.
In T717#1409576, @NiharikaKohli wrote:

Off topic question: @Qgil, in my experience students tend to stay involved for long with the same organization if they have the chance of participating again in the same organization. Although I like our policy about not accepting repeats, it does lead to more students wandering off to other organizations after the internship ends.

[ off-point ]
/me is a victim of this one, but got into the program at the end :P. I'm liking it though :)
[/off-point]

Jun 29 2015, 9:06 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Mvolz added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.

I'm wondering if maybe some students think they've met this requirement, or actually have already and it's not been recorded in the checklist?

Jun 29 2015, 6:41 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Qgil added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.

I think this questions deserves a mentor / community discussion. All Wikimedia policies can be changed by better Wikimedia policies if there is consensus. :)

Jun 29 2015, 5:31 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Niharika added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.
In T717#1408072, @Qgil wrote:

What is missing to complete this wrap-up?

Jun 29 2015, 1:03 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy

Jun 28 2015

Qgil added a comment to T717: Wrap-up GSoC 2014 and FOSS OPW round 8.

What is missing to complete this wrap-up? At this point, I think we just need to be pragmatic and take the quickest efficient way to solve this task.

Jun 28 2015, 8:52 AM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy
Qgil added a parent task for T18: Plan to migrate code review from Gerrit to Phabricator: T38269: Implement a real way to request new repositories.
Jun 28 2015, 8:44 AM · ECT-October-2014, Gerrit-Migration, Wikimedia Phabricator RfC

Jun 11 2015

Qgil closed T88978: Migration of the Zero team to Phabricator, a subtask of T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator, as Resolved.
Jun 11 2015, 8:24 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014
Qgil added a comment to T824: Phabricator as Wikimedia software project management tool.

Good point: https://meta.wikimedia.org/w/index.php?title=FLOSS-Exchange&type=revision&diff=12417227&oldid=12417053

Jun 11 2015, 7:18 AM · ECT-January-2015, Project-Management, Phabricator, ECT-December-2014, ECT-October-2014, ECT-November-2014
jayvdb added a comment to T824: Phabricator as Wikimedia software project management tool.

As this is resolved, an update on the status of the propriety project management tools used by WMF may be possible: https://meta.wikimedia.org/wiki/FLOSS-Exchange#Wikimedia_Foundation

Jun 11 2015, 6:38 AM · ECT-January-2015, Project-Management, Phabricator, ECT-December-2014, ECT-October-2014, ECT-November-2014

Jun 10 2015

DarTar closed T826: Migration of Research & Data to Phabricator, a subtask of T825: Goal: The majority of WMF developer teams and sprints have moved to Phabricator, as Resolved.
Jun 10 2015, 1:45 PM · Goal, Epic, ECT-January-2015, Phabricator, ECT-December-2014, ECT-November-2014, ECT-October-2014

Jun 7 2015

Niharika updated the task description for T717: Wrap-up GSoC 2014 and FOSS OPW round 8.
Jun 7 2015, 1:06 PM · DevRel-September-2015, ECT-August-2015, ECT-June-2015, ECT-May-2015, ECT-April-2015, ECT-March-2015, ECT-February-2015, ECT-January-2015, ECT-December-2014, ECT-November-2014, ECT-October-2014, Developer-Advocacy