NQM Errata

I’m quite proud of the fact that NQM has been in print for over a month before the first errata came to light. One of my proofreaders picked it up. 🙂

Rule 2.3.1 line three should read “with, usually  3 Strength Points (SP3) per company.”

Please Leave a Reply