Loading Events

« All Events

Fire‑Rated Confidence Starts with System XFR®

April 1, 2023 - April 1, 2028

System XFR fire-rated piping installation

System XFR® is the world’s first engineered PVC DWV system rated for high buildings and air plenums. Register now for a training session providing technical information on:

  • Product Overview
  • Advantages of PVC vs Traditional Metals
  • Firestopping
  • Codes & Standards Compliance
  • Installation Methods

Sign-up to attend a training session

 

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Services Provided
Select all that applies: