FY20-Q2 VPE OKR: Build our product vision => 50%
-
Key result: Raise monthly throughput from 1800 MRs to ~2160 => 50%, targeting 1762-2114 for July
-
Key result: Raise average MRs per engineer per month to 10 => 0%, 8.1 in June, we appear locked in the 8's as long as our rate of growth remains what it is
-
Key result: Hire to plan => 100%, everyone is hiring to plan at this point
CC @sytses
Edited by Eric Johnson