You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Checkboxes on Todo Gantt Chart aren't working #352
No matter what you do with the checkboxes, they don't change the Gantt chart displayed. The date controls work.
Here's a sample url: http://{url}/web2project/index.php?m=tasks&a=todo&tab=1
Fixed on dev-5.0.0 in 444070c4. The To Do Gantt saved checked boxes as "on", which the chart read as 0. A hidden duplicate set of checkboxes also kept boxes from being unchecked, and "Projects on Hold" only existed in that hidden copy. The filters now send 1/0, the duplicates are gone, and changing the user no longer resets them.
Activity
Make the filter checkboxes on the To Do Gantt chart work
caseysoftware commentedon Oct 16, 2026
Fixed on dev-5.0.0 in 444070c4. The To Do Gantt saved checked boxes as "on", which the chart read as 0. A hidden duplicate set of checkboxes also kept boxes from being unchecked, and "Projects on Hold" only existed in that hidden copy. The filters now send 1/0, the duplicates are gone, and changing the user no longer resets them.