Skip to content

WebCodecs registration policy #426

Closed

Description

@chrisn

In the last Media WG meeting we talked about criteria for adding new WebCodecs registrations. @aboba suggested:

  1. Specification required. This could be a reference to a specification published by an SDO, or a website (e.g. VP9). There may be some stability requirement (e.g. a reference to a personal github may not qualify). The specification should be available at least to the designated Expert Reviewer.
  2. Expert review required. The expert could be one of the spec editors, or someone designated by the WG Chairs. The idea is to designate someone to review the proposal and produce a written review with a recommendation (with the reasoning behind it), posted to the WG mailing list.
  3. WG discussion. The WG (and the submitter) should have the opportunity to respond to the expert review.
  4. Consensus determination. The WG Chairs determine whether the Expert review has consensus or not.

Activity

  1. added
    registry
    on Mar 16, 2023
  2. aboba commented on Mar 16, 2023

    @aboba
    Collaborator

    @dalecurtis Can we close this?

  3. dalecurtis commented on Mar 16, 2023

    @dalecurtis
    Contributor

    We now have a VideoFrameMetadata registry.

  4. chrisn commented on Mar 16, 2023

    @chrisn
    MemberAuthor

    This issue was about clarifying codec registrations, and we haven't updated the registry requirements based on these suggestions.

    The main differences I see are:

    (1) A stability requirement for the codec specification
    (2) An explicit expert review step (e.g., as part of step 5 of the requirements). I note that this is where we had difficulty with the proposed H.263 registration
    (3) WG discussion is implied in step 5 by "If the Media Working Group reaches consensus", but this doesn't currently require discussion with the submitter if they are not a Media WG member

    The other points may be already sufficiently covered:

    (1) Step 1 already requires a link to a public specification
    (4) Consensus determination is mentioned in step 5, and covered by the WG charter

    We could prepare a PR to change the registry document, the main thing needing input would be whether we want to include a stability requirement, and - if we do - how it should be formulated.

  5. reopened this on Mar 16, 2023
  6. added
    PR exists
    on Jun 23, 2023
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    PR existsregistry

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions