Skip to content

Conversation

@Monokaix
Copy link
Member

What type of PR is this?

/kind feature
/area scheduling

What this PR does / why we need it:

Which issue(s) this PR fixes:

Related issue: #3881

Fixes #

Special notes for your reviewer:

This is based on #3922 and do some clean up and add ut.

Does this PR introduce a user-facing change?


@volcano-sh-bot volcano-sh-bot added kind/feature Categorizes issue or PR as related to a new feature. area/scheduling labels Jan 11, 2025
@volcano-sh-bot volcano-sh-bot added the size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. label Jan 11, 2025
@Monokaix Monokaix changed the title Network informer 1 Update: Populate hyperNode info Jan 11, 2025
@Monokaix Monokaix force-pushed the network-informer-1 branch 7 times, most recently from 3b46ea5 to fd774ab Compare January 12, 2025 03:58
@Monokaix
Copy link
Member Author

"k8s.io/klog/v2"

schedulingv1beta1 "volcano.sh/apis/pkg/apis/scheduling/v1beta1"

Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

A line was deleted by mistake

@hwdef
Copy link
Member

hwdef commented Jan 13, 2025

Some minor issues.

Copy link
Member

@lowang-bh lowang-bh left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@volcano-sh-bot volcano-sh-bot added the lgtm Indicates that a PR is ready to be merged. label Jan 13, 2025
@hwdef
Copy link
Member

hwdef commented Jan 13, 2025

/approve

@volcano-sh-bot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: hwdef

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@volcano-sh-bot volcano-sh-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jan 13, 2025
@hwdef
Copy link
Member

hwdef commented Jan 13, 2025

/ok-to-test

@volcano-sh-bot volcano-sh-bot added the ok-to-test Indicates a non-member PR verified by an org member that is safe to test. label Jan 13, 2025
@volcano-sh-bot volcano-sh-bot merged commit 3dbb30b into volcano-sh:network-topology Jan 13, 2025
9 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. area/scheduling kind/feature Categorizes issue or PR as related to a new feature. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

7 participants