Skip to content

Conversation

@wangyang0616
Copy link
Member

…od. It is more reasonable to set reason to Unschedulable and compatible with autoscaler capacity expansion

Signed-off-by: w00568049 <[email protected]>
@volcano-sh-bot volcano-sh-bot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Jul 27, 2023
@william-wang william-wang changed the title [cherry-pick for release-1.8] Fix: the pod pipeline status is incompatible with autoscaler capacity expansion [cherry-pick for release-1.8] Fix: the task pipeline status is incompatible with cluster autoscaler Jul 27, 2023
Copy link
Member

@william-wang william-wang left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@volcano-sh-bot volcano-sh-bot added the lgtm Indicates that a PR is ready to be merged. label Jul 27, 2023
@volcano-sh-bot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: william-wang

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@volcano-sh-bot volcano-sh-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jul 27, 2023
@volcano-sh-bot volcano-sh-bot merged commit 76a0f01 into volcano-sh:release-1.8 Jul 27, 2023
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants