Repository navigation
chore(issues): [#2918] archive the SI-6 spec and mark it DONE in EPIC #2912 - #3023
Conversation
…osed and mark it DONE in EPIC torrust#2912 Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
No actionable comments were generated in the recent review. Walkthrough
Merge Risk:
|
|
ACK 0873705 |
|
Post-merge note: this pull request requested a review from this account and was closed without one at its final head. A post-merge review will not be done: This pull request changed documentation only: it archived the specification of #2918 and marked its row done in the EPIC table. |
Close-out of #2918 (SI-6 of EPIC #2912), whose implementation merged in #3018.
docs/issues/closed/(status: done,spec-path,related-pr: 3018,last-updated-utc) and repairs its ownissue-speclink.CLOSEDon GitHub.torrust-info-hash,torrust-located-error) are still to be opened by the maintainer from the drafts kept in the spec folder.🤖 Generated with Claude Code
Summary by CodeRabbit