Skip to content

chore(issues): archive closed issue #2913 spec to docs/issues/closed - #2936

Merged
josecelano merged 10 commits into
torrust:developfrom
josecelano-bot:2913-close-out
Nov 18, 2026
Merged

josecelano merged 10 commits into
torrust:developfrom
josecelano-bot:2913-close-out

Conversation

@josecelano-bot

@josecelano-bot josecelano-bot commented Nov 18, 2026 •

Copy link
Copy Markdown
Contributor

Close-out of issue #2913 (SI-1 of EPIC #2912), after PR #2930 merged. The issue is already closed on GitHub, so this PR uses no closing keyword.

Changes

Verification

  • linter markdown and linter cspell pass; the pre-commit hook ran on each commit.
  • Counts for F10 recomputed at develop 5b3c8b64c: 22 {location} formats (rg -U --multiline-dotall over packages), 23 production location: &'static Location<'static> fields (24 matches, one in the test helper axum-http-server/tests/server/asserts.rs).

🤖 Generated with Claude Code

josecelano-bot and others added 5 commits November 18, 2026 10:07
…orrust#2850

Review finding F10 of PR 2930 (da2ce7's F2): the 24 variants and 23 Display formats are the audit's counts from before the fix for torrust#2850, which removed one variant; at develop they are 23 and 22. The Alternatives line on the 38 sites gets the same qualifier.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… merged skill

Review finding F9 of PR 2930 (da2ce7's F1): the Observed Result was not what the commands print once the review fixes changed the skill. V1 is re-run on the skill as merged and its output pasted verbatim.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… add the skills directory

Review finding F11 of PR 2930 (da2ce7's F3): most hits are issue specs and review audits, which are history, not unrelated; the search now also covers .claude/skills, which finds only the changed skill.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…closed

Issue torrust#2913 (SI-1 of EPIC torrust#2912) closed with the merge of PR torrust#2930. Sets status done, spec-path, related-pr and the checkpoints, and marks SI-1 DONE in the EPIC's sub-issue table.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… findings of PR 2930

Adds F9-F11 (da2ce7's review 5953996662) as FOLLOW_UP to the PR 2930 audit, with the post-merge workflow record and the close-out PR torrust#2936 that fixes them.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@josecelano josecelano self-assigned this Nov 18, 2026
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 18, 2026 10:51
@josecelano

Copy link
Copy Markdown
Member

ACK 9747987

da2ce7
da2ce7 previously approved these changes Nov 18, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 974798730a5ffe754c76d7480f0f573d7525096b. Recomputed from the bytes at this head, against the merge base 5b3c8b64c; git merge-tree against develop 5b3c8b64c writes a clean tree identical to the head's tree, since develop is the merge base.

Process: an archive move under cleanup-completed-issues, carrying three post-merge follow-ups under process-pr-review ("Reviews Submitted After Merge"), with the title, description and commit checks of open-pull-request. The move, the frontmatter, the checkpoints, the progress-log entry and the EPIC row (closed path, DONE) follow the skill, and the archive commit uses its subject.

The change against its claim: the ADR's new counts recompute at 5b3c8b64c: 22 #[error] formats with {location}, 23 production location: &'static Location<'static> fields (24 with the test helper asserts.rs:10), 37 production Location::caller() sites. The V1 block is byte-identical to a fresh run of its three commands on the merged skill. The T3 figures recompute (371 lines, 345 under docs/issues/ and docs/pr-reviews/), the other 26 are exactly the groups the record names, and in the skills directory only handle-errors-in-code matches, on three lines.

Consistency: no live reference to the old folder remains; the one hit, in the PR 2930 audit, is a historical verification line. In that audit, rows and detail entries pair up, F9-F11 carry all ten detail fields, the log is in order, and the F1-F8 resolution subjects are commits of PR 2930. One outgoing link of the moved spec broke (F1), and the sweep for the F10 counts stopped at the ADR (F2).

Hygiene: five Conventional Commits, author = committer on each, bodies match their diffs; each carries one attribution footer line (no rule in the tree on it), and the description carries one attribution footer line too. git diff --check is clean, the PR-branch commit-id check prints nothing, and no closing keyword appears in the title, the description or the commits.

Findings: F1 (Minor) the archived spec's parent-EPIC link is broken; F2 (Minor) the EPIC and the SI-1 spec still give the pre-fix counts. Neither blocks: both are one-line repairs.

Checked, no finding: the post-merge approval record states the decision time and the comment's creation time; F9-F11 stay FOLLOW_UP/OPEN until this PR merges, as the skill requires; no ADR rule forbids a count correction.

Checks

On the loop's compute node at this head, against the merge base 5b3c8b64c (receipt server-gates-kranich-1163): the repository's pre-commit gate and lint roster exit 0 (70 s wall). This PR carries no audit record of its own, so the gate ran no validator for it. The PR changes documentation only, so no package tests apply. F1 checked against the bytes at posting: line 29 of the archived ISSUE.md links ../2912-remove-source-locations-from-errors/EPIC.md, no such folder exists under docs/issues/closed/ (the EPIC is in docs/issues/open/), and line 10 of lychee.toml excludes docs/issues/closed/ from the link check. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 043255835.

@da2ce7

da2ce7 commented Nov 18, 2026

Copy link
Copy Markdown
Contributor

ACK 9747987 — the archive move, the EPIC row and the recomputed ADR counts, V1 output and T3 figures verified at this head

@josecelano

Copy link
Copy Markdown
Member

ACK 9747987

josecelano-bot and others added 2 commits November 18, 2026 11:08
… SI-1 spec

Review finding F1 of PR 2936: after the move to docs/issues/closed/ the link ../2912-.../EPIC.md no longer resolves; the EPIC is still in docs/issues/open/.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
 in the EPIC and its specs

Review finding F2 of PR 2936: the F10 correction of PR 2930 reached only the ADR. The EPIC torrust#2912 spec, the archived SI-1 spec and the torrust#384 spec still gave the pre-torrust#2850 counts; they now add 22 formats and 23 variants since torrust#2850, the form they already use for the 37 sites.

Co-Authored-By: Claude Opus 5.5 <[email protected]>

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

Archiving the specification breaks its relative Parent EPIC link, which needs to point to the EPIC still located under open/.

1 open issue
What changed in this PR

Archives the completed specification for issue #2913, the first step of EPIC #2912, after PR #2930 merged. This is documentation-only; no Rust behavior changes.

Changes:

  • Moves the specification and verification evidence to closed/ and marks SI-1 complete.
  • Refreshes verification output, historical search notes, and ADR counts.
  • Records three follow-up review findings as open until this PR merges.
File Description
docs/​pr-reviews/​pr-2930-review/​PR-REVIEW.md Records follow-up findings, approval, and pending resolution.
docs/​issues/​open/​2912-remove-source-locations-from-errors/​EPIC.md Marks SI-1 done and updates its archived path.
docs/​issues/​closed/​2913-2912-si-1-adr-errors-do-not-record-source-locations/​manual-verification-evidence.md Archives evidence and refreshes the recorded verification output.
docs/​issues/​closed/​2913-2912-si-1-adr-errors-do-not-record-source-locations/​ISSUE.md Records completion, archival, and expanded guidance-search results.
docs/​adrs/​20261118045443_errors_do_not_record_source_locations.md Adds post-#2850 counts alongside the original audit totals.

Review effort: Balanced

Records da2ce7's F1 (broken EPIC link) and F2 (pre-torrust#2850 counts), both fixed, and Copilot's re-raise F3, including the thread resolved before its reply.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@josecelano

Copy link
Copy Markdown
Member

ACK c936834

@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 18, 2026 11:16
da2ce7
da2ce7 previously approved these changes Nov 18, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 538d94c6ac7cf18bab2110f314acfe252783c7ee. Recomputed from the bytes at this head, against the merge base 5b3c8b64c; git merge-tree against develop bc9d0590c writes a clean tree with no conflicts and no live reference to the old SI-1 path.

Process: this round covers the three commits since 974798730, a fast-forward, and the replies, resolutions and audit record since then, against process-pr-review and docs/templates/PR-REVIEW-TEMPLATE.md.

The change against its claim: f58fca16b points the archived SI-1 spec's parent link at ../../open/2912-remove-source-locations-from-errors/EPIC.md, which resolves, so F1 is fixed. c93683472 adds the post-#2850 figure to the counts in the EPIC (lines 46 and 56), the SI-1 spec (line 43) and the SI-7 spec (line 57); the figures recompute and no other count lacks it, so F2 is fixed. 538d94c6a adds the audit record from the template, with its verbatim sections intact. It holds F1 and F2 as FIXED/RESOLVED, and F3, the automated re-raise of F1, as RE_RAISE_OF:F1, NO_ACTION/SUPERSEDED with the reviewer's own ID kept. Its log records the thread that was resolved before its reply. Each commit body matches its diff.

Consistency: the repository's validator, run offline on the captured comments with the local commit range in place of the commit listing, reports 3 rows, 4 log entries and 0 failures. All three threads predate the audit commit, and each has a reply, a row and a resolution. The links in the changed files resolve.

Hygiene: three new Conventional Commits with [#2913], author = committer on each; each carries one attribution footer line (no rule in the tree on it). git diff --check is clean, the PR-branch commit-id check prints nothing, and no closing keyword appears in the eight commits, the title or the description.

Findings: F12 (Minor) the F2 entry names a grep whose paths miss the SI-1 spec; F13 (Minor) the description does not cover the round-1 changes. Neither blocks.

Checked, no finding: the F1 entry's note on the evidence file holds, since that file's only relative link sits inside the fenced paste; the log's reply times match the capture; the PR 2930 audit is unchanged.

Checks

On the loop's compute node at this head, against the merge base 5b3c8b64c (receipt server-gates-kranich-1167): the repository's pre-commit gate and lint roster exit 0 (53 s wall), and the audit validator passes this pull request's record (3 rows, 4 log entries, 0 failures). The PR changes documentation only, so no package tests apply. Round 1's F1 checked against the bytes at posting: line 29 of the archived ISSUE.md now links ../../open/2912-remove-source-locations-from-errors/EPIC.md. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is a0d97f956.

@da2ce7

da2ce7 commented Nov 18, 2026

Copy link
Copy Markdown
Contributor

ACK 538d94c — the F1 and F2 fixes, the new audit record and its offline validator run verified at this head

@josecelano-bot

Copy link
Copy Markdown
Contributor Author

Review finding F13 (da2ce7, review 5955641353): the PR description now has a bullet for review round 1 of this PR: the restored parent EPIC link of the archived SI-1 spec (F1, F3), the "since #2850" counts in the EPIC spec, the archived SI-1 spec and the #384 spec (F2), and the audit record docs/pr-reviews/pr-2936-review/PR-REVIEW.md.

…r count lines of PR 2936 F2

Review finding F12 of PR 2936: the F2 verification named a grep whose paths miss the archived SI-1 spec. It now names both searches that ran and a reproduction over the three files as they were before the fix.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Records da2ce7's F12 and F13, their fixes, replies and resolution.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@josecelano

Copy link
Copy Markdown
Member

ACK 6991702

@josecelano
josecelano requested a review from da2ce7 November 18, 2026 11:32

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟢 Approval recommended

No active review issues block this documentation-only SI-1 closeout.

No open issues 🎉

1 resolved since last review

Review effort: Balanced

@josecelano

Copy link
Copy Markdown
Member

ACK c3a02e4

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at c3a02e4a5c864a06f452180135d3fdbe5520d075. Recomputed from the bytes at this head, against the merge base 5b3c8b64c; git merge-tree against develop 00b55c81c writes a clean tree with no conflicts and no live reference to the old SI-1 path.

Process: this round covers the two commits since 538d94c6a, a fast-forward, the edited description, and the replies, resolutions and audit rows since then, against process-pr-review.

The change against its claim: 6991702c6 rewrites the F2 Current-tree verification to name both searches. The phrase search, run at f58fca16b, finds the four lines plus the two ADR lines that were already qualified. The pattern search over its named paths finds three, and the stated reproduction finds EPIC 46 and 56, #384 57 and SI-1 43. All of this recomputes, so F12 is fixed. The description's new bullet names the round-1 fixes, the SI-7 spec and the audit record, so F13 is fixed. c3a02e4a5 adds rows F12 and F13 (FIXED/RESOLVED, reviewer IDs kept), their detail entries and two log entries. F13 cites the conversation comment that states the description edit, as the skill asks for a fix outside the tree. Both commit bodies match their diffs.

Consistency: the repository's validator, run offline on the captured comments with the local commit range, reports 5 rows, 6 log entries and 0 failures. All five threads predate the last audit commit, and each has a reply, a row and a resolution. The automated review after that commit raises no actionable item, so it needs no row.

Hygiene: two new Conventional Commits with [#2913], author = committer on each; each carries one attribution footer line (no rule in the tree on it). git diff --check is clean, the PR-branch commit-id check prints nothing, and no closing keyword appears in the ten commits, the title or the description.

Findings: none at this head.

Checked, no finding: the F12 entry's reproduction and the log's reply times match the capture, and the log entries are in order and stamped no later than their commit.

Checks

On the loop's compute node at this head, against the merge base 5b3c8b64c (receipt server-gates-kranich-1172): the repository's pre-commit gate and lint roster exit 0 (192 s wall), and the audit validator passes this pull request's record (5 rows, 6 log entries, 0 failures). The PR changes documentation only, so no package tests apply. Checked against the bytes at posting: docs/pr-reviews/pr-2936-review/PR-REVIEW.md at this head carries rows for the round-2 findings. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 00b55c81c.

@da2ce7

da2ce7 commented Nov 18, 2026

Copy link
Copy Markdown
Contributor

ACK c3a02e4 — the F12 record fix, the F13 description bullet and the round 2 audit rows with their offline validator run verified at this head

@josecelano

Copy link
Copy Markdown
Member

ACK c3a02e4

@josecelano
josecelano merged commit 305027e into torrust:develop Nov 18, 2026
1 check passed
josecelano added a commit that referenced this pull request Nov 18, 2026
…xed after PR 2936 merged

be132e7 docs(pr-reviews): [#2913] audit review round 1 of PR 2946 (josecelano-bot)
37a9b59 docs(pr-reviews): [#2913] record the post-merge checks behind F9 to F11 of the PR 2930 audit (josecelano-bot)
fcb9432 docs(pr-reviews): [#2913] mark F9 to F11 of the PR 2930 audit fixed after PR 2936 merged (josecelano-bot)

Pull request description:

  Closes the loop on da2ce7's post-merge findings F9 to F11 of PR #2930, following step 6 of the post-merge review workflow in `process-pr-review`. The fixes landed in the close-out PR #2936, merged into `develop` at 2026-11-18 13:31:43 UTC (`305027e70`). Docs only, two files.

  - In `docs/pr-reviews/pr-2930-review/PR-REVIEW.md`, F9 to F11 change from `FOLLOW_UP` / `OPEN` to `FIXED` / `RESOLVED`. Their resolution references now name the merged commit subjects, and their reply URLs the new replies.
  - A Processing Log entry records the merge, the three replies and the resolutions.
  - Review round 1 of this PR (da2ce7, two non-blocking findings): the Current-tree verification fields of F9 to F11 now record the check after the merge (the merge is an ancestor of `develop`, plus each finding's own check), and the merge time names its source, the forge `mergedAt`. The new audit `docs/pr-reviews/pr-2946-review/PR-REVIEW.md` records both findings.
  - All three threads on PR #2930 have a reply naming the merged fix and are resolved. A GraphQL refresh shows zero unresolved threads on #2930.

  The audit validator passes for both records (PR 2930: 11 rows, 10 log entries, 0 failures; PR 2946: 2 rows, 2 log entries, 0 failures), and the pre-commit and pre-push hooks passed.

  Refs #2913

  🤖 Generated with [Claude Code](https://claude.com/claude-code)

ACKs for top commit:
  josecelano:
    ACK be132e7
  da2ce7:
    ACK be132e7 — the post-merge checks and clock naming of F9-F11 and the new PR 2946 audit, with the validator run offline against the captured threads, verified at this head

Tree-SHA512: 59fec4b2885a2dd7c2d9553df0f21e456a686b12202ace8d8fa5351ef00c555288de791e0189189909d95fd2471dbea69bb9a6dc0fc74ba9196c3b9e0c8d1de2
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants