Repository navigation
chore(issues): [#2847] archive the SI-28 spec and mark EPIC #1488 row 25 done - #2929
Conversation
…and mark EPIC torrust#1488 row 25 done PR torrust#2911 merged and issue torrust#2847 is closed. Move the SI-28 spec to docs/issues/closed/, set status done, related-pr 2911 and the new spec path, tick the CI acceptance criterion (both tests ran in the PR's Unit stable and nightly jobs), and mark row 25 of the EPIC roadmap Done with the archived link. Co-Authored-By: Claude Opus 5.5 <[email protected]>
There was a problem hiding this comment.
Warning
Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.
Copilot review overview
1 open issue
What changed in this PR
Archives SI-28 spec (#2847) and updates EPIC #1488 roadmap state to reflect completion after PR #2911 merged.
Changes:
- Moves issue #2847 spec from
docs/issues/open/todocs/issues/closed/and updates frontmatter/status. - Updates EPIC #1488 roadmap row 25 to “Done” and points it at the archived spec.
- Updates manual verification evidence frontmatter to reference the new spec location.
| File | Description |
|---|---|
| docs/issues/open/1488-overhaul-tracker-shutdown/ISSUE.md | Marks roadmap row 25 (SI-28/#2847) as Done and updates link to archived spec. |
| docs/issues/closed/2847-1488-si-28-verify-hung-component-abort/manual-verification-evidence.md | Updates evidence frontmatter to point at the archived spec path and refreshes timestamp. |
| docs/issues/closed/2847-1488-si-28-verify-hung-component-abort/ISSUE.md | Updates spec frontmatter/status and acceptance criteria to reflect completion and archival. |
Review effort: Lite
…tc timestamp Co-Authored-By: Claude Opus 5.5 <[email protected]>
Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK c7578ae |
There was a problem hiding this comment.
Warning
Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.
Copilot review overview
3 open issues
The mapping described here is ambiguous: 'rated medium by Copilot' is mapped toMinor (inferred).… · New This processing log entry references PR #2911 findings using a short SHA (e.g.,da2ce7elsewhere… · New These table rows start with||, which renders as an extra empty leading column in Markdown. If an… · New
1 resolved since last review
Review effort: Lite
…apping in the PR 2929 audit Co-Authored-By: Claude Opus 5.5 <[email protected]>
… to F4 for PR 2929 Co-Authored-By: Claude Opus 5.5 <[email protected]>
… and correct the F4 severity Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK 5d1efbf |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 5d1efbfb99cc9bba99fe2e2dfb5b5c08f83b655e. Recomputed from the bytes at this head, against the merge base d1c231ae2; git merge-tree against develop 8d932f312 writes a tree with no conflict, which differs from develop in the same nine files (+147/-12) as the branch does from its base.
Process: an archive move under cleanup-completed-issues, the review audit under process-pr-review, commits and description under commit-changes and open-pull-request. The archive steps are met except one supplementary-file clause (F1).
The change against its claim: the folder moves whole (seven renames, five unchanged in content); the spec has status: done, related-pr: 2911, the new spec-path and a repaired EPIC link; the CI criterion, its acceptance row and the last checkpoint are ticked, with a log entry; the evidence file's issue-spec names the new path and its stamp is quoted; EPIC row 25 links the archive and reads Done. The row's text matches the code: src/main.rs and the test binary both call app::run_until_shutdown_signal, and hung_component_abort.rs has one test per signal asserting exit code 1, the deadline window, both aborted components and incomplete_components. d1c231ae2 is the implementation merge, and its description closes the issue. testing.yaml:114 runs the workspace tests on both toolchains; the job logs are not in these bytes.
Consistency: all 45 relative links in the changed Markdown resolve, including the archived folder that the link checker skips; the only mention of the old path left is the historical PR 2909 record, as the description says; no dictionary change. The audit's four rows match their source comments, review ids, replies and severity badges, and the validator's logic, run offline with the branch's commit list, exits 0 (4 rows, 3 log entries).
Hygiene: six Conventional subjects in the repository's [#2847] form; author equals committer; every commit, and the description, ends with an attribution footer, which no adopted rule in the tree forbids; git diff --check is clean; the skill's PR-branch commit-id check prints nothing; the closing-keyword pattern matches nothing in the title, the description or the commit messages.
Findings: F1 to F3, all Nit; none blocks.
Checked, no finding: the precedent the severity mapping cites (the PR 2397, 2421 and 2430 audits); the F3 and F4 verification commands, rerun at the reviewed head and at this head; the template's verbatim sections; eight columns in every table row.
Checks
On the loop's compute node at this head, against the merge base d1c231ae2 (receipt server-gates-kranich-1143): the repository's pre-commit gate and lint roster exit 0 (540 s wall), and the audit validator passes this pull request's record (4 rows, 3 log entries, 0 failures). The PR changes documentation only, so no package tests apply. F1 checked against the bytes at posting: the archived test-design-review.md opens with # Test Design Review and no frontmatter, as do the four other files of that name under docs/issues/closed/. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Publish (Development): completed/skipped; Publish (Release): completed/skipped; Context: completed/success; Package Coverage (${{ matrix.package }}): completed/skipped; Package Coverage Regression: completed/success; Docker E2E: completed/skipped; Layer Boundary Bans: completed/success; Workspace Packaging: completed/success; Unit (stable): completed/success; Documented Clippy Allows: completed/success; Unit (nightly): completed/success; Shipped Features: completed/success; Generate Coverage Report: completed/success; Discover Package Coverage: completed/success; Build on ubuntu-latest (nightly): completed/success; Build on windows-latest (stable): completed/success; Test (Docker) (release): completed/success; Build on macos-latest (stable): completed/success; Build on ubuntu-latest (stable): completed/success; Build on windows-latest (nightly): completed/success; Build on macos-latest (nightly): completed/success; Docs Lint: completed/success". At posting, develop is d8e14450d.
|
ACK 5d1efbf |
|
Post-merge workflow approval, posted by This PR merged at 2026-11-18 09:42 UTC at head
Approved disposition: a small follow-up PR from 🤖 Generated with Claude Code |
…2929 as a follow-up ed1dc3d docs(pr-reviews): record da2ce7's round 3 findings F9 to F11 for PR 2934 (josecelano-bot) 658d0e4 docs(pr-reviews): record Copilot's round 2 findings F2 to F4 for PR 2934 (josecelano-bot) 2218060 docs(pr-reviews): add review audit for PR 2934 round 1 (josecelano-bot) d0e31cc docs(pr-reviews): [#2847] record the post-merge follow-up of F5 to F7 in the PR 2929 audit (josecelano-bot) efc0830 docs(pr-reviews): [#2847] record da2ce7's round 4 findings F5 to F7 for PR 2929 (josecelano-bot) e04965a docs(issues): [#2847] add the archive frontmatter to the SI-28 test-design review (josecelano-bot) Pull request description: Follow-up to PR #2929: PR #2929 merged before the push that carried the fixes for da2ce7's review 5953861373, so its three Nits did not reach `develop`. The maintainer approved this follow-up in [this comment](#2929 (comment)). Docs only. - **F5** (da2ce7's F1): the archived `docs/issues/closed/2847-1488-si-28-verify-hung-component-abort/test-design-review.md` gets the minimal frontmatter that step 3 of `cleanup-completed-issues` asks for: `spec-path`, `last-updated-utc`, and `semantic-links` back to the spec. - **F6** (F2): the PR #2929 audit gains a correction entry. It gives the round-1 reply's `created_at` (`21:35:58Z`) and says where the logged stamps came from. - **F7** (F3): the audit logs its late start. It was created after the first reply. The audit records F5 to F7 as `FOLLOW_UP` / `OPEN` with this PR's link and the approval comment. A commit after this PR merges turns them into `FIXED` and resolves the three threads on PR #2929. The two fix commits are the ones prepared for PR #2929, cherry-picked onto `develop` without changes. Pre-commit and pre-push hooks passed; the audit validator passes. Refs #2847 🤖 Generated with [Claude Code](https://claude.com/claude-code) ACKs for top commit: da2ce7: ACK ed1dc3d — F9 to F11 are fixed and recorded, every thread on this pull request has a reply, an audit row and a resolution, the audit validator's logic passes and the commit-id check prints nothing at this head, which merges cleanly with develop josecelano: ACK ed1dc3d Tree-SHA512: 999bcaa504376bc36d178e512256e4640e606fe5afeb51de6c737461e7bccac29181c5e8efd648fccf7b592b92e9030204dad5a65ecc8f9dc493a1e1dd993117
…ed after PR 2934 merged 875f1fd docs(pr-reviews): mark F5 to F7 of the PR 2929 audit fixed after PR 2934 merged (josecelano-bot) Pull request description: Closes the loop on da2ce7's round 4 Nits of PR #2929, following step 6 of the post-merge review workflow in `process-pr-review`. The fixes landed in follow-up PR #2934, merged into `develop` at 2026-11-18 10:59:19 UTC (`043255835`). Docs only, one file. - In `docs/pr-reviews/pr-2929-review/PR-REVIEW.md`, F5 to F7 change from `FOLLOW_UP` / `OPEN` to `FIXED` / `RESOLVED`. Their resolution references now name the merged commit subjects, and their reply URLs the new replies. - A Processing Log entry records the merge, the three replies and the resolutions. - All three threads on PR #2929 have a reply naming the merged fix and are resolved. A GraphQL refresh shows zero unresolved threads on #2929. The audit validator passes (7 rows, 8 log entries, 0 failures). The `open-pull-request` commit-id check prints nothing, and the pre-commit and pre-push hooks passed. Refs #2847 🤖 Generated with [Claude Code](https://claude.com/claude-code) ACKs for top commit: josecelano: ACK 875f1fd da2ce7: ACK 875f1fd — F5 to F7 read FIXED/RESOLVED with resolution subjects found among the follow-up's commits on develop, the audit validator's offline logic passes, the commit-id check prints nothing and the head merges cleanly with develop Tree-SHA512: 4e3d7d01c520fd865656be9f071a1833b75e34218884908aba8946a8c439a53ebe01b3c9348038a4101fc43a5882307a0261ca2eae5181952c304a9b8c053d55


Close-out of issue #2847 (SI-28 of EPIC #1488), after PR #2911 merged. Docs only.
2847-1488-si-28-verify-hung-component-abortfromdocs/issues/open/todocs/issues/closed/.status: done,related-pr: 2911, the newspec-path, and the evidence file'sissue-spec.packages/hung-component-tracker/tests/hung_component_abort.rsran and passed in the Unit (stable) and Unit (nightly) jobs of PR test(hung-component-tracker): [#2847] verify the hung-component abort on a real tracker binary #2911.CLOSEDon GitHub. Pre-commit hooks passed,linter allincluded.The PR #2909 review record still names the old
open/path; it is a historical record, so it is left unchanged.Refs #2847, #1488
🤖 Generated with Claude Code