Repository navigation
chore(issues): [#2873] archive the closed spec and mark it DONE in EPIC #2003 - #2900
Conversation
…E in EPIC torrust#2003 PR torrust#2893 merged and closed issue torrust#2873. The spec folder moves to docs/issues/closed/ with status done, its new spec path, the ticked checkpoint and a progress-log entry; no retrospective, as the spec already records. EPIC torrust#2003 row 22 is DONE and points at the archived spec. Co-Authored-By: Claude Opus 5.5 <[email protected]>
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 1b21e7ea20103242dc8d7a4cde128148b289802c. Recomputed from the bytes at this head, against the merge base e018ce07b; git merge-tree against develop 2fed4dbb3 writes a clean tree that differs from develop in exactly these four files (+15/-14), because develop has moved only Cargo.lock since the base.
Process: an archive close-out, governed by cleanup-completed-issues (Steps 1 to 6), with commit-changes and open-pull-request for the commit and the description. The change follows those steps.
The change against its claim: the three spec files are renames, and below their frontmatter both evidence files match the base byte for byte. ISSUE.md is done, its spec-path is its new location, the closing checkpoint is ticked, and the new entry is stamped in the commit's minute (08:58:55 UTC); the 18:14 UTC entry it cites does say why there is no retrospective. EPIC row 22 is DONE at the archived path. The merges of the spec PR (77ad3468c) and of the implementation PR (e018ce07b) both carry [#2873]. The row's other notes still hold: 53 skills, longest description 187 characters, write-markdown-docs read whole.
Consistency: the folder name occurs only in the moved files, the EPIC, and three lines of the PR 2875 audit record, which keep the path of that time as history, as Step 4 allows. All 47 frontmatter paths, Markdown links and anchors in the four files resolve at this head. No index lists archived specs.
Hygiene: one commit, 1b21e7ea2. Its subject is Conventional with the [#N] form, its body matches the diff, and its author is its committer. It carries one attribution footer and the description ends with an attribution line; no rule at this head forbids them, because the commit-provenance discussion's Outcome is pending. git diff --check is clean, the skill's PR-branch commit-id check prints nothing, and the closing-keyword pattern matches nothing in the title, the description or the commit.
Findings
- F1 (Minor): the EPIC Progress Log has no line for row 22 becoming DONE.
Checked, no finding: the 08:57 UTC merge time. The merge commit is stamped 08:50:05 UTC; the #2866 entry used the same push-time convention, and the forge's time is not in the capture. Also checked: the reviewer checkpoints left unticked, as in the #2866 archive, and the quoted evidence timestamp.
Checks
On the loop's compute node at this head, against the merge base e018ce07b (receipt server-gates-kranich-1046): the repository's pre-commit gate and lint roster exit 0 (355 s wall). The PR changes documentation only, so no package tests apply. F1 checked against the bytes at posting: the EPIC's Progress Log ends at line 456 with the 2026-11-16 17:35 UTC entry for row 21. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 2fed4dbb3.
|
ACK 1b21e7e — the archive move, its frontmatter and EPIC row 22 recompute from the bytes at this head, no live reference keeps the old path, and the merge with develop is clean |
There was a problem hiding this comment.
🟢 Approval recommended
No active review issues are recorded for the documentation-only archival and progress updates.
No open issues 🎉
What changed in this PR
This documentation-only PR closes out issue #2873 after implementation PR #2893 merged, archiving its specification and evidence and updating parent EPIC #2003. No runtime behavior changes.
Changes:
- Move the issue specification and evidence to
docs/issues/closed/and update their references. - Mark the issue complete and record its closure in the progress log.
- Mark EPIC row 22
DONE, linking the archived specification and both related PRs.
| File | Description |
|---|---|
docs/issues/open/2003-overhaul-guardrails-and-automation/EPIC.md |
Marks row 22 complete and references the archived spec and related PRs. |
docs/issues/closed/2873-2003-shorten-skill-descriptions/manual-verification-evidence.md |
Updates the issue-spec reference and timestamp. |
docs/issues/closed/2873-2003-shorten-skill-descriptions/ISSUE.md |
Records completion, updates archived paths, and logs closure. |
docs/issues/closed/2873-2003-shorten-skill-descriptions/description-measurements.md |
Updates references to the archived specification and evidence. |
Review effort: Balanced
|
ACK 1b21e7e |
… for row 22 Adds the sub-issue #2904 to the Subissues table. Also adds the progress log entry that was missing for row 22 (#2873), marked DONE by PR #2900. Co-Authored-By: Claude Fable 5.2 <[email protected]>
Close-out of #2873, after PR #2893 merged on 2026-11-17 at 08:57 UTC and closed the issue.
CLOSEDon GitHub.docs/issues/open/2873-2003-shorten-skill-descriptions/todocs/issues/closed/.ISSUE.md:status: done, newspec-pathand related-artifact paths, the "Issue closed and spec moved" checkpoint ticked, and a progress-log entry. No retrospective: the spec already records why none is needed.DONE, points at the archived spec, and names spec PR docs(issues): [#2873] add issue specification for shortening the skill descriptions #2875 and implementation PR docs(skills): [#2873] shorten the agent skill descriptions to fit Claude Code's listing budget #2893.🤖 Generated with Claude Code