Repository navigation
chore(issues): [#2394] archive the audit spec and mark it DONE in EPIC #2392 - #2898
Conversation
… in EPIC torrust#2392 Close-out for torrust#2394 after PR torrust#2891 merged. Moves the spec folder to docs/issues/closed/, sets status done, marks T6, the manual scenarios and the acceptance criteria done, and logs the archive. The EPIC's order 2 row is DONE and links drafts D1, D2 and D3; the coordinator creates their GitHub issues and rows. Live references in the EPIC and the three drafts point at the new path; past PR review records keep the old path as history. Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK de6a18d |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at de6a18d92faa209e671bb3a6fbf7f1fc23da34a5. Recomputed from the bytes at this head, against the merge base 3f9a7c24b; git merge-tree against develop e018ce07b writes a tree with no conflict (develop's one new merge touches none of the six files).
Process: an archive move with its EPIC sync, governed by the cleanup-completed-issues skill, with create-issue for the spec sections and open-pull-request for the title, body and keyword rules. Steps 2 to 5 of the cleanup skill are met; Step 1 (issue closed first) is not (F1).
The change against its claim: both audit files move as renames; status: done, spec-path, issue-spec and the stamps follow the new path; T6, M1, M2, AC1 to AC3 and three checkpoints are ticked with evidence; the EPIC row and log and the three drafts follow. A script recounts the inventory rows: 38 findings, 29 isolated, 1 exception (P3), 5 covered (P1, P9, C1, C2, C3), 3 new (P2, F2, C9), matching the EPIC row, AC2 and the summary table. The only non-docs change between the inventory's rerun point and this head is a comment in src/container.rs, so M1's evidence holds.
Consistency: the folder name appears outside the folder only at its new path, except five lines in the PR 2862, 2883 and 2891 review records, kept as history (Step 4). The moved files hold no relative link (one in-page anchor resolves); every related-artifact path exists; every table row keeps its header's cell count; no word is added that the tree's Markdown lacks.
Hygiene: one commit; Conventional subject in the tree's [#N] form; body matches the diff; author equals committer; one attribution footer, which no rule in the tree governs; git diff --check clean; the commit-id check prints nothing; no closing keyword in title, body or message.
Findings: F1 (Minor) archived while #2394 is open; F2 (Nit) C3's extension of order 4 stated as done; F3 (Suggestion) the no-retrospective reason omits the C9 miss. None blocks.
Checked, no finding: frontmatter against the validator's profiles; related-pr kept as in the sibling specs; the title's issue reference; the description's claims; no review thread, so no audit record is due.
Checks
On the loop's compute node at this head, against the merge base 3f9a7c24b (receipt server-gates-kranich-1042): the repository's pre-commit gate and lint roster exit 0 (296 s wall). The PR changes documentation only, so no package tests apply. F1 checked at posting: issue #2394 is open on the forge, while line 151 of the archived spec says "#2394 is closed by the maintainer". The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is e018ce07b.
|
ACK de6a18d — the archive move, its frontmatter and ticked evidence, the recounted 38-finding inventory, the EPIC row and the draft references recomputed at this head, with no blocking finding |
F1: the archive log entry says torrust#2394 is still open and the maintainer closes it when the close-out merges. F2: the EPIC row marks C3's extension of order 4's scope as pending. F3: the no-retrospective reason records the lesson from C9, which the T1 searches missed. Co-Authored-By: Claude Opus 5.5 <[email protected]>
There was a problem hiding this comment.
Warning
Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.
Copilot review overview
3 open issues
This spec now lives underdocs/issues/closed/and the progress log states “#2394 is closed by the… · New This spec now lives underdocs/issues/closed/and the progress log states “#2394 is closed by the… · New The EPIC row marks #2394 asDONE, but the PR description notes the GitHub issue #2394 is still… · New
What changed in this PR
Archives issue spec #2394 (EPIC #2392) and updates related EPIC/draft references to point to the closed spec location while recording completion evidence.
Changes:
- Moved #2394 audit spec references from
docs/issues/open/todocs/issues/closed/and marked the spec asdone. - Updated EPIC #2392 order 2 to
DONEwith outcome summary and linked draft follow-ups (D1–D3). - Updated draft subissues to reference the archived audit inventory.
| File | Description |
|---|---|
| docs/issues/open/2392-test-isolation/EPIC.md | Marks order 2 (#2394) as DONE and repoints spec link to closed location; adds decision log entry. |
| docs/issues/drafts/2392-remove-leaked-test-temporary-files/ISSUE.md | Updates audit inventory links to point to the closed archive path. |
| docs/issues/drafts/2392-fixed-port-metrics-test-concurrent-runs/ISSUE.md | Updates audit inventory links to point to the closed archive path. |
| docs/issues/drafts/2392-compose-cleanup-after-failed-start/ISSUE.md | Updates audit inventory links to point to the closed archive path. |
| docs/issues/closed/2394-2392-audit-shared-test-resources/inventory.md | Updates issue-spec and timestamps to reflect the archived spec location. |
| docs/issues/closed/2394-2392-audit-shared-test-resources/ISSUE.md | Marks #2394 as done, updates verification statuses/evidence, and links the new drafts. |
Review effort: Lite
Co-Authored-By: Claude Opus 5.5 <[email protected]>
…in the spec and EPIC Copilot's round on PR 2898: the spec's last checkpoint is split into the done archive move and the pending GitHub closure, and the EPIC's order 2 row says torrust#2394 is still open until the close-out merges. Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK de6a18d |
Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK f8a7385 |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at f8a7385a7bd00101bc9ec8184e6f9945d9561357. Recomputed from the bytes at this head, against the merge base 3f9a7c24b; git merge-tree against develop e018ce07b writes a tree with no conflict, and develop's one new merge still touches none of the PR's seven files.
Process: four commits fast-forward de6a18d92: two fix commits (9e0a88057, c7e762620) and the review audit in two commits of its own (9202a5144, f8a7385a7), as the process-pr-review skill asks; each subject and body matches its diff.
Round-1 findings: F1 resolved: the log entry says #2394 is still open and is closed when the close-out merges, and the closure checkpoint is split from the done move, so the early archive is now stated plainly. F2 resolved: the EPIC row marks C3's extension of order 4 as pending. F3 resolved: the reason records the C9 lesson (release on the success path only; EPIC rule 1), and its account of the first inventory's C5 matches the bytes.
Audit record: six rows, F1 to F3 of this review plus three bot findings, one a re-raise of F1. The validator's logic, run offline on the capture with the PR commits from local refs, reports 6 rows, 5 log entries, 0 failures. Each reply sits on its own thread; the quoted reply times, the six resolved threads and the six current-tree greps reproduce; the log admits three threads resolved before their replies. Its commit stamps are completion times (git sets %cI before the hook runs), about 33 s after %cI, which the skill allows.
Hygiene: author equals committer; each new commit carries one attribution footer, which no rule in the tree governs; git diff --check clean; the commit-id check prints nothing; no closing keyword in title, body or messages; every table keeps its shape.
Findings: F4 (Nit) the spec's and the EPIC's last-updated-utc stayed at 08:52 through the 09:19 and 09:21 edits; F5 (Nit) the description was not refreshed: it omits the audit record and names the old combined checkpoint. None blocks.
Checked, no finding: the replies and resolutions came before the push of all four commits (the stale-approval dismissal names f8a7385a7 at 09:36:51Z), which no rule orders; the "still open" statements are true at this head and want a tick once #2394 is closed.
Checks
On the loop's compute node at this head, against the merge base 3f9a7c24b (receipt server-gates-kranich-1044): the repository's pre-commit gate and lint roster exit 0 (133 s wall), and the audit validator passes the record (6 rows, 5 log entries, 0 failures). The PR changes documentation only, so no package tests apply. F4 checked against the bytes at posting: the spec's and the EPIC's last-updated-utc both read 2026-11-17 08:52, while c7e762620 edited both at 09:21:39Z. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "". At posting, develop is e018ce07b.
|
ACK f8a7385 — the round-1 fixes, the pending-closure wording and the six-row audit record against the captured threads recomputed at this head, with no blocking finding |
…edit Review round 2 of PR 2898 (F4): last-updated-utc follows the round-1 edits. Co-Authored-By: Claude Opus 5.5 <[email protected]>
Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
ACK 36926e9 |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 36926e9f113b8ad283b47c8aa4fd6c5c4f5f6c43. Recomputed from the bytes at this head, against the merge base 3f9a7c24b; git merge-tree against develop e018ce07b writes a tree with no conflict, and develop's one new merge still touches none of the PR's seven files.
Process: two commits fast-forward f8a7385a7: the F4 fix (95a0622cc) and the audit update in its own commit (36926e9f1), as the process-pr-review skill asks; each subject and body matches its diff.
Round-2 findings: F4 resolved: the spec's and the EPIC's last-updated-utc read 09:47, the minute of 95a0622cc (09:47:35Z), their last edit; the record's 09:49 matches 36926e9f1. F5 resolved: the description now names the audit record and the split checkpoint, and its claims match the head (the ticked move, the pending closure, the EPIC row's note, the logged C9 lesson). F1 to F3 stay resolved.
Audit record: eight rows; F4 and F5 of round 2 are rows F7 and F8 with the reviewer IDs kept, severities matching the brackets. The validator's logic, run offline on the capture with the PR commits from local refs, reports 8 rows, 7 log entries, 0 failures. Both new replies sit on their own threads at the quoted times, all eight threads are resolved, F8 cites its out-of-tree fix by the reply URL, and its body count reproduces (1). The sweep now selects only threads whose last comment is a reply.
Hygiene: author equals committer; each new commit carries one attribution footer, which no rule in the tree governs; git diff --check clean; the commit-id check prints nothing; no closing keyword in title, body or messages.
Findings: none new; F1 to F5 resolved.
Checked, no finding: the replies and resolutions again came before the push (the stale-approval dismissal names 36926e9f1 at 09:52:45Z), which no rule orders; the record's commit stamps are completion times, as in round 2.
Checks
On the loop's compute node at this head, against the merge base 3f9a7c24b (receipt server-gates-kranich-1045): the repository's pre-commit gate and lint roster exit 0 (152 s wall), and the audit validator passes the record (8 rows, 7 log entries, 0 failures). The PR changes documentation only, so no package tests apply. F4's fix checked against the bytes at posting: the EPIC's last-updated-utc now reads 2026-11-17 09:47, the minute of 95a0622cc. The head was confirmed with git ls-remote before posting. GitHub checks at this head at posting time: "Docs Lint: in_progress/pending". At posting, develop is e018ce07b.
|
ACK 36926e9 — the F4 stamps, the refreshed description and the eight-row audit record against the captured threads recomputed at this head, with no blocking finding |
|
ACK 36926e9 |
…s EPIC orders 6 to 8 f353d29 docs(pr-reviews): [#2392] record Copilot's round in the PR #2910 review audit (josecelano-bot) 7b102b7 docs(issues): [#2392] describe the #2906 candidate approach in the conditional (josecelano-bot) 944fb97 docs(pr-reviews): [#2392] record round 2 of the PR #2910 review audit (josecelano-bot) 1ed5b16 docs(pr-reviews): [#2392] cite commit subjects in the PR #2910 audit (josecelano-bot) 5946e8a docs(pr-reviews): [#2392] record the PR #2910 review audit (josecelano-bot) ae1f1e2 docs(issues): [#2392] refresh the #2394 records and evidence timestamps (josecelano-bot) d23ddd9 docs(issues): [#2392] place orders 6 to 8 in the EPIC delivery plan (josecelano-bot) b08b192 docs(issues): [#2392] keep the #2906 approach and #2908 test boundary open until T2 (josecelano-bot) 13c4d48 docs(issues): [#2392] add orders 6 to 8, close AC4 and extend #2396's scope (josecelano-bot) 2c6eafc docs(issues): [#2392] add issue specifications for #2906, #2907 and #2908 (josecelano-bot) Pull request description: ## Summary Spec-only follow-up of the #2394 shared-resource audit (PR #2891, close-out PR #2898). No code changes. The audit drafted three new problems (D1, D2, D3). This PR adds their specs under their GitHub issues and syncs EPIC #2392: - **New issue specs**, moved from `docs/issues/drafts/` to `docs/issues/open/` with their numbers (status `planned`): - #2906 (D1, finding P2): two runs of the fixed-port metrics test on one machine collide on `0.0.0.0:17091`-`17094`. - #2907 (D2, finding F2): tests leave `data_*.db`, `test_config_*.toml` and PEM files in the system temporary directory. - #2908 (D3, finding C9): a failed `docker compose up` leaves the qBittorrent E2E stack running. - **`docs/issues/open/2392-test-isolation/EPIC.md`**: - Orders 6 to 8 for the three issues, and order 2's row points at them. - Phase 2 is done. - AC4 is DONE: every finding is isolated, a deliberate exception, or tracked by a subissue. - AC2 now waits on orders 6 and 7, the two new problems that make the suite fail. - Order 6 notes that its proposed fix (the loopback helper beyond the 9 #2393 tests) needs a maintainer decision before implementation starts. - **`docs/issues/open/2396-2392-e2e-unique-tracker-image-tag/ISSUE.md`**: scope extended with the local default tags `torrust-tracker:qbt-e2e-local` and `torrust-tracker:test-mounted-no-persistence-configuration` (#2394 finding C3, maintainer decision Q2), in the background, scope, T5 and AC3. - **`docs/issues/closed/2394-2392-audit-shared-test-resources/`**: links to the drafts now point at the new specs, with the issue numbers. - **`docs/pr-reviews/pr-2910-review/PR-REVIEW.md`**: the review audit. da2ce7's round 1 findings are fixed in their own commits: the #2906 approach stays open until T2, orders 6 to 8 are placed in the delivery plan, and the #2394 records are refreshed. The branch history was rewritten once, with the maintainer's approval. In the first commit's body, "closed" no longer sits next to "#2394", so GitHub won't read it as a closing keyword (review finding F4). The tree is unchanged. The audit maps the commit ids that round 1 cited to commit subjects. ## Validation - `linter all` passes, and the pre-commit hook passes on each of the branch's commits. Related to #2392 Related to #2396 Related to #2906 Related to #2907 Related to #2908 🤖 Generated with [Claude Code](https://claude.com/claude-code) ACKs for top commit: da2ce7: ACK f353d29 — F1 to F9 verified fixed, all twelve threads replied to, recorded and resolved, and the audit validator passing offline at this head josecelano: ACK f353d29 Tree-SHA512: 3cd83a4b3ebad0f57e103c87d93f7bd2cdd7968f32065c3e903973d03e2d559895202c5cef74aa053d0a423482d259bfd8dbcea3dd430d99016d56ec3b8cfc3d


Related to #2394 (EPIC #2392, Test Isolation). Close-out after PR #2891 merged.
docs/issues/open/2394-2392-audit-shared-test-resources/todocs/issues/closed/, setstatus: done, the newspec-pathandissue-spec, andlast-updated-utc.docs/pr-reviews/pr-2862-review/,pr-2883-review/,pr-2891-review/) keep the old path as history.docs/pr-reviews/pr-2898-review/PR-REVIEW.md.Not in this PR:
🤖 Generated with Claude Code