Skip to content

chore(issues): [#2844] archive closed issue spec to docs/issues/closed - #2860

Merged
josecelano merged 2 commits into
torrust:developfrom
josecelano-bot:2844-close-out
Nov 14, 2026
Merged

josecelano merged 2 commits into
torrust:developfrom
josecelano-bot:2844-close-out

Conversation

@josecelano-bot

@josecelano-bot josecelano-bot commented Nov 14, 2026 •

Copy link
Copy Markdown
Contributor

Close-out of #2844 (SI-25, roadmap row 22 of EPIC #1488). Closes #2844. Documentation only.

🤖 Generated with Claude Code

@josecelano josecelano self-assigned this Nov 14, 2026
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 14, 2026 09:49

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 471feccec206d2c985aae68fb8ce8b2ce959e5c0. Recomputed from the bytes at this head, against the merge base 9e5d3ff95; git merge-tree against develop bae180ff7 writes a clean tree with no conflict, and no file this PR touches changed on develop since the merge base.

Process: an archive move under cleanup-completed-issues (frontmatter, checkpoints, log entry, reference audit, parent EPIC row and frontmatter), with process-pr-review for the added audit row and open-pull-request for title, body and closing keywords.

The change against its claim: both files of the spec folder move; status: done, spec-path, issue-spec and both stamps match the commit minute; the three open checkpoints are ticked and the log says why no retrospective was needed. The F13 stamps are fixed: history puts the round-1 fix commit at 22:52 and the evidence rewrite at 23:27. EPIC row 22 now links the closed path, and its note holds: merged as 9e5d3ff95, no version line changed, the nine variants are gone, the first-publish spec is still open. The Acceptance Criteria were already ticked at the merge base (F7).

Consistency: nothing in the tree still references the old path. The moved spec's EPIC link breaks (F2), and the link checker skips docs/issues/closed/. An offline replay of the audit validator on the PR 2858 record passes on this branch and fails F13 once merged (F1).

Hygiene: one commit, Conventional subject with [#2844], no body, author equals committer, one attribution footer that no rule in the tree forbids; git diff --check is clean; the PR-branch commit-id check prints nothing; the only closing keyword in title, body and message names the issue this PR closes.

Findings

  • F1 Major: F13's Follow-up PR URL is NA, so the record fails its validator on develop.
  • F2 Minor: the moved spec's EPIC link resolves under closed/.
  • F3 Minor: the new log entry's round and thread counts disagree with the audit.
  • F4 Minor: the audit's Ownership line still says not merged.
  • F5 Minor: the EPIC's last-updated-utc was not moved.
  • F6 Nit: the log entry makes the list loose again (F6 of the PR 2858 review).
  • F7 Nit: the description says acceptance rows were ticked; none changed.

Checked, no finding: the closed-location frontmatter rules; the F13 row's fields and its subject; the other links of the EPIC table; Closes #2844 as the closer, since the implementation PR used a non-closing reference.

Checks

On the loop's compute node at this head, against the merge base 9e5d3ff95 (receipt server-gates-kranich-875): the repository's pre-commit gate and lint roster exit 0 (95 s wall). This PR has no audit record of its own yet, so the gate ran no validator for it. The PR changes documentation only, so no package tests apply. F2 checked against the bytes at posting: the moved spec's line 29 links ../1488-overhaul-tracker-shutdown/ISSUE.md, which resolves to docs/issues/closed/1488-overhaul-tracker-shutdown/, absent at this head, while the EPIC is in docs/issues/open/. F1 checked against the bytes: F13's row reads Follow-up PR URL: NA. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 1bb188769.

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

The remaining documentation issues are a broken archive backlink, a missing follow-up PR URL that would prevent post-merge audit validation, and an outdated EPIC timestamp.

3 open issues
What changed in this PR

This documentation-only PR closes out #2844 (SI-25 of EPIC #1488) after PR #2858 removed unused public shutdown error variants. It archives the issue records without changing runtime behavior.

Changes:

  • Archive the issue spec and verification evidence, updating lifecycle metadata and completion checkpoints.
  • Mark roadmap row 22 as Done and link to the archived spec.
  • Correct timestamps and record F13 in the implementation PR’s review audit.
File Description
docs/​pr-reviews/​pr-2858-review/​PR-REVIEW.md Adds F13 and its close-out processing entry.
docs/​issues/​open/​1488-overhaul-tracker-shutdown/​ISSUE.md Marks SI-25 complete and updates its archive link.
docs/​issues/​closed/​2844-1488-si-25-remove-unused-error-variants/​manual-verification-evidence.md Updates the issue-spec path and evidence timestamp.
docs/​issues/​closed/​2844-1488-si-25-remove-unused-error-variants/​ISSUE.md Archives the spec, marks completion, and updates the progress log.

Review effort: Balanced

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 13404c72924a677b5780e515b07ddbfc6162fbc5. Recomputed from the bytes at this head, against the merge base 9e5d3ff95; git merge-tree against develop 8adea4890 writes a clean tree with no conflict, and none of the 86 commits develop gained since the merge base touches a file this PR changes.

Process: this round reads the one new commit 13404c729, a fast-forward of 471feccec, and the forge record since the last review, under process-pr-review for the new audit and cleanup-completed-issues for the spec and the EPIC.

The change against its claim: the commit fixes F1 to F7 as its replies say. F13's row names this PR as its follow-up, and an offline replay of the validator on the PR 2858 record now finds its subject on this branch and after merge; the EPIC link resolves under open/; the log entry says four rounds and 14 threads; the Ownership line, the EPIC stamp and the tight list are fixed; the description no longer claims acceptance rows.

Consistency: the new PR 2860 audit has one row and one detail per thread, seven from this review and three from the bot review. The validator's own logic, fed the captured comments, reports 0 failures on the branch and after merge: review IDs, reply threads, severity brackets, subjects and log order hold. Every thread has a reply on its own thread. Links in the changed files resolve.

Hygiene: Conventional subject with [#2844], no body, author equals committer, one attribution footer that no rule in the tree forbids; git diff --check is clean; the PR-branch commit-id check prints nothing; the only closing keyword names the issue this PR closes.

Findings

  • F27 Nit: the 12:38 stamps and the F5 "commit minute" precede the 12:39 commit, and the replies cite it before it existed.
  • F28 Minor: F7's Resolution reference cites the commit, but its fix is the description edit.
  • F29 Nit: C1 to C3 are recorded ORIGINAL with no Reviewer finding ID, though they repeat F2, F5 and F1.

None blocks.

Checked, no finding: F1 to F7 at this head; the PR 2858 record's other rows; the dictionary entry for the new word; Closes #2844 as the only closing keyword.

Checks

On the loop's compute node at this head, against the merge base 9e5d3ff95 (receipt server-gates-kranich-888): the repository's pre-commit gate and lint roster exit 0 (75 s wall); the repository's audit validator on pr-2860-review exits 0 (10 rows, 1 log entry, no failures). The PR changes documentation only, so no package tests apply. F1 and F2 checked against the bytes at posting: F13's row in the PR 2858 record now names this PR as its Follow-up PR URL, and the moved spec's EPIC link reads ../../open/1488-overhaul-tracker-shutdown/ISSUE.md. Read on the forge: all 10 review threads are answered and resolved. GitHub checks at this head at posting time: "". At posting, develop is 8adea4890.

- Source review ID: 5903621787
- Source URL: https://github.com/torrust/torrust-tracker/pull/2860#discussion_r4572936251
- Concern: Stamp stayed at 2026-11-12.
- Solution: Set to the commit minute.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F27] The 12:38 stamps precede the 12:39 commit that writes them

This commit is dated 12:39:24Z (author and committer), yet this Solution and the F5 reply call 12:38 "the commit minute", and the spec, evidence and EPIC last-updated-utc values and the Processing Log entry on line 181 all say 12:38. The ten replies were posted from 12:38:44Z to 12:39:03Z, before the commit they cite existed, as the log entry itself says ("answered, then fixed"). process-pr-review (Statements in Your Own Records) stamps an event only after it happened, with the time taken from git log --format=%cI; it is the F13 pattern of PR 2858 again.

Suggested: take the stamps from the commit that carries them, drop "the commit minute" unless it holds, and keep the log's order of replies before the commit.

- Concern: Description said acceptance rows were ticked.
- Solution: Edited the description.
- Current-tree verification: Read the changed file and ran `validate-audit-record.py` for PR 2858 and 2860.
- Resolution reference: docs(issues): [#2844] address the review of the close-out PR

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F28] F7's Resolution reference names this commit, but F7 was fixed by the description edit

The commit changes no description and no file for F7, so the Current-tree verification ("Read the changed file") has nothing to read. process-pr-review (Required Audit Fields) says a FIXED fix outside the repository tree, such as a PR body edit, cites the durable URL of the PR conversation response that states it; the PR 2858 audit does so for its F2, a title edit.

Suggested: - Resolution reference: https://github.com/torrust/torrust-tracker/pull/2860#discussion_r4573525674, and a verification that names the description.

| F5 | review-finding:pr-2860-f5 | Human | Minor | metadata | ORIGINAL | FIXED | RESOLVED |
| F6 | review-finding:pr-2860-f6 | Human | Nit | formatting | ORIGINAL | FIXED | RESOLVED |
| F7 | review-finding:pr-2860-f7 | Human | Nit | documentation | ORIGINAL | FIXED | RESOLVED |
| C1 | review-finding:pr-2860-c1 | Copilot | Minor | documentation | ORIGINAL | FIXED | RESOLVED |

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F29] C1 to C3 repeat F2, F5 and F1 but are recorded ORIGINAL, without the bot's own IDs

Their headings say "same as", the log says "all duplicates", and they arrived six minutes later at the same head. The audit template maps a later request for the same current-tree change to RE_RAISE_OF:<FindingId>, and the skill records the reviewer's own ID when it is reassigned; the bot labelled them F1, F3 and F2.

Suggested: Relationship RE_RAISE_OF:F2, RE_RAISE_OF:F5 and RE_RAISE_OF:F1, with - Reviewer finding ID: F1 for C1, F3 for C2 and F2 for C3.

@da2ce7

da2ce7 commented Nov 14, 2026

Copy link
Copy Markdown
Contributor

ACK 13404c7 — F1 to F7 are fixed in the bytes at this head, the new audit passes the validator's logic offline against the captured comments, F13 of the PR 2858 record now resolves after merge, and the merge with develop is conflict-free

@josecelano

Copy link
Copy Markdown
Member

ACK 13404c7

@josecelano
josecelano merged commit febd3d9 into torrust:develop Nov 14, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Remove the unused public shutdown error variants

4 participants