Skip to content

chore(issues): archive closed issue #2581 spec to docs/issues/closed - #2701

Merged
josecelano merged 2 commits into
torrust:developfrom
josecelano:chore/archive-issue-2581-spec
Nov 3, 2026
Merged

josecelano merged 2 commits into
torrust:developfrom
josecelano:chore/archive-issue-2581-spec

Conversation

@josecelano

Copy link
Copy Markdown
Member

Related to #2581

Archives the spec of issue #2581, which closed as completed when PR #2683 merged, from docs/issues/open/ to docs/issues/closed/, following the cleanup-completed-issues skill. The issue is already closed on GitHub, so this pull request does not close anything.

Changes

  • Moves docs/issues/open/2581-2003-pr-review-wait-poller/ (the spec and the manual verification evidence) to docs/issues/closed/, and sets status: done, the new spec-path, related-pr: 2683 and a real last-updated-utc in both files.
  • Records in the evidence that V6 (the poller returning on a real da2ce7 review) was not run: no da2ce7 review existed when the pull request merged and the poller had already returned pr_merged. The spec's progress log gets an archival entry, and its criterion about manual verification stays unticked for that reason.
  • Repairs the two live links that named the old path: the related-artifacts of the wait-for-pr-review skill and of the PR 2683 audit. The PR 2584 audit entries that name the old path are historical records of the path at the time, so they are left as they are. The parent EPIC Overhaul: Automation Tools and AI Agent Guardrails #2003 does not list Deterministic wait-for-review poller for AI agents #2581, so it needs no change.
  • Adds a note to the wait-for-pr-review skill: push every commit first and request the Copilot review last, because Copilot reviews the head as of the request (on PR feat(wait-for-pr-review): [#2581] add a deterministic wait-for-review poller for AI agents #2683 a review requested at head d000f8881 covered that commit although two more were pushed five minutes later), and use a 45-minute poller budget when waiting for Copilot. It also restores the line continuations of the two re-request commands, which an earlier edit had collapsed. This small skill improvement rides along as its own commit.

Validation

  • Pre-commit passed for both commits, and the pre-push hook passed on push.
  • frontmatter-validator passes on the four changed Markdown files, git diff --cached --check is clean, and the PR 2683 audit validator still passes (18 rows, 0 failures).
  • A search of the repository, including hidden folders, for the old spec path finds only the PR 2584 historical entries.
  • The branch is based on the current develop and merges with it cleanly.

josecelano and others added 2 commits November 3, 2026 17:14
…closed

PR 2683 merged and the issue closed as completed. Mark the spec done,
point it at the closed folder, record that V6 was not run, and repair
the live links that named the old path.

Co-authored-by: Copilot <[email protected]>
…t review last

Copilot reviews the head as of the request, not as of its answer: on PR
2683 a review requested at head d000f88 covered that commit although
two more were pushed 5 minutes later. Record the ordering, advise a
45-minute poller budget for Copilot, and restore the line continuations
of the two re-request commands.

Co-authored-by: Copilot <[email protected]>
Copilot AI balanced review requested due to automatic review settings November 3, 2026 17:19
@josecelano
josecelano requested a review from a team as a code owner November 3, 2026 17:19

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Warning

Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.

Copilot review overview

No open issues 🎉

What changed in this PR

Archives the completed spec for issue #2581 and updates related documentation links, along with a small update to the wait-for-pr-review skill guidance based on learnings from PR #2683.

Changes:

  • Updates issue spec/evidence frontmatter to reflect completion (status: done), new spec-path, related-pr, and timestamp.
  • Fixes references to the archived spec path in the PR #2683 review audit and in the wait-for-pr-review skill.
  • Enhances the wait-for-pr-review skill instructions (Copilot request timing, longer timeout, restored line continuations).
File Description
docs/​pr-reviews/​pr-2683-review/​PR-REVIEW.md Updates related-artifacts link to point at the archived issue spec path.
docs/​issues/​open/​2581-2003-pr-review-wait-poller/​manual-verification-evidence.md Updates frontmatter to archived spec path and adds a closing note explaining why V6 was not run.
docs/​issues/​open/​2581-2003-pr-review-wait-poller/​ISSUE.md Marks the issue as done, sets related-pr, updates spec-path, and adds an archival progress-log entry.
.github/​skills/​dev/​pr-reviews/​wait-for-pr-review/​SKILL.md Updates related-artifacts and improves Copilot re-request guidance + formatting.

Review effort: Lite

@josecelano josecelano self-assigned this Nov 3, 2026
@josecelano

Copy link
Copy Markdown
Member Author

ACK f626f75

@josecelano
josecelano merged commit db14a45 into torrust:develop Nov 3, 2026
1 check passed
@da2ce7

da2ce7 commented Nov 25, 2026

Copy link
Copy Markdown
Contributor

Post-merge note: this pull request requested a review from this account and was closed without one at its final head. A post-merge review will not be done: It changed only Markdown: an archived issue specification, a review record and the instructions of an agent skill, with no executable code, build or CI effect.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants