Skip to content

chore(issues): archive closed issue #2681 spec to docs/issues/closed - #2689

Merged
josecelano merged 3 commits into
torrust:developfrom
josecelano:chore/archive-issue-2681-spec
Oct 30, 2026
Merged

josecelano merged 3 commits into
torrust:developfrom
josecelano:chore/archive-issue-2681-spec

Conversation

@josecelano

@josecelano josecelano commented Oct 29, 2026 •

Copy link
Copy Markdown
Member

Archives the spec for issue #2681 (closed by the merge of PR #2688) from docs/issues/open/ to docs/issues/closed/, and sets row 3 of the #2482 Subissues table to DONE.

This PR also carries the approved post-merge correction for PR #2688's finding F10 (an audit chronology note), per the maintainer's durable approval at #2688 (comment): an append-only fix to docs/pr-reviews/pr-2688-review/PR-REVIEW.md only, no code change. The row stays FOLLOW_UP/OPEN in that audit; the GitHub thread is replied to and resolved once this PR merges.

Copilot AI balanced review requested due to automatic review settings October 29, 2026 13:12
… PR 2688 with maintainer approval

Co-authored-by: Copilot <[email protected]>
@josecelano
josecelano requested a review from da2ce7 October 29, 2026 13:16
@josecelano josecelano self-assigned this Oct 29, 2026

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

Two documentation issues remain: a review-request timestamp is still described as a push time, and the completion log entry precedes the creation entry, reversing chronology.

2 open issues
What changed in this PR

Archives issue #2681’s documentation after PR #2688 completed the tracker-core test-support migration under EPIC #2482. This PR changes documentation only.

Changes:

  • Moves the issue specification and supporting documents to docs/issues/closed/ and records completion.
  • Updates the EPIC status and live references to the archived paths.
  • Adds the approved post-merge chronology correction to PR #2688’s review audit.
File Description
docs/​pr-reviews/​pr-2688-review/​PR-REVIEW.md Updates the spec reference and records the F10 follow-up correction.
docs/​pr-reviews/​pr-2682-review/​PR-REVIEW.md Points audit metadata to the archived spec.
docs/​issues/​open/​2482-1669-reorganize-shared-test-support/​test-support-inventory.md Updates resolved pattern links to the archived spec.
docs/​issues/​open/​2482-1669-reorganize-shared-test-support/​EPIC.md Marks subissue 3 DONE and records its completion.
docs/​issues/​closed/​2681-2482-gate-tracker-core-test-modules-and-mocks/​manual-verification-evidence.md Archives evidence and updates its issue-spec metadata.
docs/​issues/​closed/​2681-2482-gate-tracker-core-test-modules-and-mocks/​ISSUE.md Archives the spec and records closure, completion, and implementation PR.
docs/​issues/​closed/​2681-2482-gate-tracker-core-test-modules-and-mocks/​implementation-retrospective.md Archives the retrospective and updates supporting references.
docs/​adrs/​20261021190318_share_workspace_test_support_through_testing_features.md Updates the amendment’s link to the archived spec.

Review effort: Balanced

da2ce7
da2ce7 previously approved these changes Oct 29, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 1100613ca0077026845f66bfc881a6e327cccab4. Recomputed from the bytes at this head, against the merge base 49641da38; git merge-tree against develop 49641da38 exited 0 without conflicts and produced the head tree.

Archive: all three files move by rename (97%, 96%, 99%). Captures establish the issue is closed and its implementation PR merged. Lifecycle metadata, the completion checkpoint and archival entry match the cleanup checklist; supplementary metadata follows its existing templates.

References: the whole tracked tree has one old-path occurrence, preserved historical prose. All 80 local Markdown links in changed files resolve, including 11 fragments. The EPIC and inventory match the private helper modules, feature-gated shared mock and consumer dev-dependencies.

F10: all five previous Processing Log entries are byte-identical. The new row, source review, severity, reply mapping and FOLLOW_UP/OPEN disposition agree with the captures and approval. Two prose qualifications remain below.

Hygiene: two Conventional commits match their diffs; author and committer match in each. Attribution footers have no applicable prohibition. Whitespace checks pass; the skill's branch-id check prints nothing. The description's closing-keyword scan has no matches, appropriate for this archive. No added alphabetic word is absent from the base tree.

The review bot's F1 also holds: the new 2026-10-29 12:50 UTC entry in the sub-EPIC's Progress Log sits above the 2026-10-28 12:07 UTC entry, against the log's rule to append (EPIC.md:320).

Findings: F1 (re-raises the review bot's F10) and F2 are Minor and nonblocking. IDs start at F1 for this PR, which has no audit record of its own. APPROVE: no blocking finding stands.

Checked, no finding: archive completeness, live and historical references, metadata, source-code alignment, append-only audit history, field mappings, commit scope, dictionary vocabulary and merge compatibility.

Checks

On the loop's compute hub at this head, against the merge base 49641da38, the #2688 merge (receipt server-gates-sojka-497): pre-commit profile gate exit 0 (105 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at this head and 16 / 4 at the base re-measured, none in the files this PR touches; the audit validator over docs/pr-reviews/pr-2688-review/PR-REVIEW.md at this head, with the review comments of PR #2688 and the commit lists of PRs #2688 and #2689 captured at gate time: ok, 10 rows, 6 log entries, 0 failures. No path outside docs/ changes, and git diff -M records the three spec files as renames. A search of the tree at this head for issues/open/2681- finds one line, a Progress Log entry of the archived spec dated 2026-10-28, which records history. git merge-tree of this head into develop 49641da38 is clean (tree ad1cba581). GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 49641da38.

- Reviewer finding ID: F10
- Source URL: <https://github.com/torrust/torrust-tracker/pull/2688#discussion_r4412162522>
- Concern: the 11:55 UTC Processing Log entry's final sentence says the re-request after the previous push was a no-op with no timeline event. The captured PR timeline instead contains event 34577909888: `review_requested` for `da2ce7` at 2026-10-29 11:24:49 UTC, followed by the dismissal of review 5694275942 at 11:24:50 UTC. So 11:24:49 UTC is an evidenced request time, though the capture does not establish it as the exact push time. The reviewer asks to append a correction preserving the entry, identify the completed request, and distinguish any separate attempted no-op from that event; the subsequent request at 11:57:58 UTC was still future when the 11:55 entry was written and need not be described as completed then.
- Solution: the finding was right, and continues F6 (the same chronology-precision concern). This pull request merged (2026-10-29 12:42 UTC, commit `49641da38`) before the correction could be made, so this is a post-merge finding handled under the `process-pr-review` skill's post-merge workflow: read-only triage, maintainer approval recorded as a durable comment (<https://github.com/torrust/torrust-tracker/pull/2688#issuecomment-6497509001>, 2026-10-29 13:06 UTC), then the append-only correction carried in the archive follow-up pull request for #2681, <https://github.com/torrust/torrust-tracker/pull/2689> (branch `chore/archive-issue-2681-spec`), which touches this audit file only (no code). The correction: the 11:24:49 UTC `review_requested` event for da2ce7 is the completed request after the push at 11:24:49 UTC (the capture does not establish it as the exact push instant); no separate no-op request is claimed for that push. The 11:57:58 UTC request remains described as a pending action in the 11:55 entry it was written in, because it was still future then.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F2] Attribute the single-file scope to the correction, not the archive PR
The phrase "which touches this audit file only" describes the linked archive pull request, but its diff against 49641da changes eight documentation files, including three renamed issue artifacts, the parent EPIC, inventory and ADR. Only commit 1100613 is confined to this audit. Please say that the F10 correction itself is audit-only and is carried alongside the archive changes; apply the same clarification to reply 4412730988. Nonblocking: this is repairable review-history wording, with no code behavior affected.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Not yet: the audit still describes the whole archive PR as touching only this audit file, although its diff now changes nine documentation files. Captured reply 4412730988 retains the same wording. New finding F3 continues this account's round-1 F2; scope the single-file claim to the correction itself.

@da2ce7

da2ce7 commented Oct 29, 2026

Copy link
Copy Markdown
Contributor

ACK 1100613 — verified the archive renames, references, audit field mappings and merge compatibility at this head

… completion log entry and keep the F10 chronology precise

Co-authored-by: Copilot <[email protected]>

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 7642cf1b6e90d2199a7722311b7c1f1506dd5201. Recomputed from the bytes at this head, against the round-1 head 1100613ca and the merge base 49641da38; git merge-tree against develop 49641da38 exited 0 without conflicts and produced the head tree.

What moved: three docs files since round 1, with 98 insertions and 2 deletions: the log reorder, timestamp wording and a new audit. The full PR changes nine docs files. The new Conventional subject matches the corrections; author and committer match; its attribution footer has no applicable prohibition.

Round 1: F1 is fixed; event 34577909888 alone carries 11:24:49 UTC, with no exact push time asserted. F2 remains in the record and captured reply. The review bot's log-order concern is fixed. All 54 dated entries across five logs are non-decreasing, and all five earlier entries in the prior audit remain byte-identical.

New audit: the two recorded rows match source reviews, severities, reply parents and resolved thread states. It omits review 5698507911 and both round-1 findings, without explanation. Collision-safe IDs and explicit re-raise mapping are needed; the source timestamp finding was F10, recorded locally as F2. Its explanation also incorrectly calls both log entries unmerged.

Hygiene: 80 local links and 11 fragments resolve. Whitespace and branch-id checks are clean; the description's closing-keyword scan has no matches. Metadata follows the existing profiles; the EPIC's update stamp still predates this correction. The only added alphabetic word absent from both the base vocabulary and project dictionary is ordinary English "conflation".

Findings: F3 and F4 are Minor; F5 is Nit. All are nonblocking, repairable record defects without misleading code claims. APPROVE.

Checked, no finding: docs-only scope, actual timestamp fix, full log order, preserved audit history, existing row/reply mappings, local links, commit format and footer policy, closing-keyword scan and merge compatibility.

Checks

On the loop's compute hub at this head, against the merge base 49641da38 (receipt server-gates-sojka-498): pre-commit profile gate exit 0 (93 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at this head and 16 / 4 at the base re-measured, none in the files this PR touches. Audit validator, with review comments and commit lists captured at gate time: over this PR's new docs/pr-reviews/pr-2689-review/PR-REVIEW.md ok, 2 rows, 1 log entry, 0 failures; over docs/pr-reviews/pr-2688-review/PR-REVIEW.md ok, 10 rows, 6 log entries, 0 failures. No path outside docs/ changes, and git diff -M records the three spec files as renames. A search of the tree for issues/open/2681- finds one line, the archived spec's dated 2026-10-28 Progress Log entry. git merge-tree of this head into develop 49641da38 is clean (tree 6ae5ad645). GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 49641da38.

- Reviewer finding ID: F10
- Source URL: <https://github.com/torrust/torrust-tracker/pull/2688#discussion_r4412162522>
- Concern: the 11:55 UTC Processing Log entry's final sentence says the re-request after the previous push was a no-op with no timeline event. The captured PR timeline instead contains event 34577909888: `review_requested` for `da2ce7` at 2026-10-29 11:24:49 UTC, followed by the dismissal of review 5694275942 at 11:24:50 UTC. So 11:24:49 UTC is an evidenced request time, though the capture does not establish it as the exact push time. The reviewer asks to append a correction preserving the entry, identify the completed request, and distinguish any separate attempted no-op from that event; the subsequent request at 11:57:58 UTC was still future when the 11:55 entry was written and need not be described as completed then.
- Solution: the finding was right, and continues F6 (the same chronology-precision concern). This pull request merged (2026-10-29 12:42 UTC, commit `49641da38`) before the correction could be made, so this is a post-merge finding handled under the `process-pr-review` skill's post-merge workflow: read-only triage, maintainer approval recorded as a durable comment (<https://github.com/torrust/torrust-tracker/pull/2688#issuecomment-6497509001>, 2026-10-29 13:06 UTC), then the append-only correction carried in the archive follow-up pull request for #2681, <https://github.com/torrust/torrust-tracker/pull/2689> (branch `chore/archive-issue-2681-spec`), which touches this audit file only (no code). The correction: the 11:24:49 UTC `review_requested` event for da2ce7 is the completed request; the capture establishes only that a push preceded it and does not give the push's own timestamp, so no exact push time is claimed, and no separate no-op request is claimed either. The 11:57:58 UTC request remains described as a pending action in the 11:55 entry it was written in, because it was still future then.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F3] Attribute the single-file scope to the correction
This continues this account's round-1 F2. The sentence still says the linked archive PR "touches this audit file only", but the diff against 49641da now changes nine documentation files (eight at round 1), including the three archive renames. Captured reply 4412730988 retains the same statement, with no subsequent edit recorded. Please limit the single-file scope to the F10 correction and say it travels alongside the archive changes; clarify the reply too. Nonblocking: this review-history wording is repairable after merge and does not misdescribe code.


## Findings

One review was submitted so far: the review of `copilot-pull-request-reviewer` (5698444728, COMMENTED, 2026-10-29 13:27:55 UTC) on the head whose subject is `docs(pr-reviews): [#2681] record the post-merge finding F10 of PR 2688 with maintainer approval`. It carries no "didn't start before the timeout" warning. It lists two open issues, each with one inline thread (F1 and F2). Copilot was requested through the `request_copilot_review` MCP tool. da2ce7 was requested through the REST `requested_reviewers` endpoint.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F4] Include the other submitted review and its separate findings
Review 5698507911 was submitted at 13:32:06 UTC, 98 seconds before this commit, with comments 4412934990 and 4412935004. Neither appears here, and the capture still marks both threads unresolved. The skill requires every finding, including re-raises, to have its own row and detail. Add this review and both findings, retaining their original IDs in detail fields and allocating unused audit-local IDs on collision. Round-1 F1 re-raises this audit's timestamp row F2; round-1 F2 is the distinct scope error continued in F3 above. Otherwise readers can mistake the two FIXED rows for disposition of this account's F1/F2. Also distinguish local row F2 from its source comment's actual ID F10. Nonblocking: audit coverage can be corrected after merge.

- Source review ID: 5698444728
- Reviewer finding ID: F1
- Source URL: <https://github.com/torrust/torrust-tracker/pull/2689#discussion_r4412888321>
- Concern: the new 2026-10-29 12:50 UTC Progress Log entry of the #2482 EPIC was inserted before the existing 2026-10-28 12:07 UTC entry, reversing chronology and leaving the log ending on an IN_PROGRESS statement after row 3's own completion statement.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F5] Say that only the completion entry was unmerged
The claim "The content of neither entry had merged yet" contradicts both its parenthesis and the base bytes: EPIC.md at 49641da already contains the 2026-10-28 12:07 creation entry. Only the 2026-10-29 12:50 completion entry is new on this branch. Please remove the broader claim and retain that narrower explanation for moving the new line. Nonblocking historical wording.

@da2ce7

da2ce7 commented Oct 29, 2026

Copy link
Copy Markdown
Contributor

ACK 7642cf1 — verified the docs-only delta, chronology fixes, audit source mappings, local links and clean merge at this head

@josecelano

Copy link
Copy Markdown
Member Author

ACK 7642cf1

@josecelano
josecelano merged commit 311e7f0 into torrust:develop Oct 30, 2026
1 check passed
@josecelano
josecelano requested review from da2ce7 and a balanced review from Copilot November 3, 2026 16:46

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟡 Changes recommended

The audit documentation omits human review findings and contains inaccurate claims about change scope and which entries were unmerged.

3 open issues
2 resolved since last review

Review effort: Balanced

- Reviewer finding ID: F10
- Source URL: <https://github.com/torrust/torrust-tracker/pull/2688#discussion_r4412162522>
- Concern: the 11:55 UTC Processing Log entry's final sentence says the re-request after the previous push was a no-op with no timeline event. The captured PR timeline instead contains event 34577909888: `review_requested` for `da2ce7` at 2026-10-29 11:24:49 UTC, followed by the dismissal of review 5694275942 at 11:24:50 UTC. So 11:24:49 UTC is an evidenced request time, though the capture does not establish it as the exact push time. The reviewer asks to append a correction preserving the entry, identify the completed request, and distinguish any separate attempted no-op from that event; the subsequent request at 11:57:58 UTC was still future when the 11:55 entry was written and need not be described as completed then.
- Solution: the finding was right, and continues F6 (the same chronology-precision concern). This pull request merged (2026-10-29 12:42 UTC, commit `49641da38`) before the correction could be made, so this is a post-merge finding handled under the `process-pr-review` skill's post-merge workflow: read-only triage, maintainer approval recorded as a durable comment (<https://github.com/torrust/torrust-tracker/pull/2688#issuecomment-6497509001>, 2026-10-29 13:06 UTC), then the append-only correction carried in the archive follow-up pull request for #2681, <https://github.com/torrust/torrust-tracker/pull/2689> (branch `chore/archive-issue-2681-spec`), which touches this audit file only (no code). The correction: the 11:24:49 UTC `review_requested` event for da2ce7 is the completed request; the capture establishes only that a push preceded it and does not give the push's own timestamp, so no exact push time is claimed, and no separate no-op request is claimed either. The 11:57:58 UTC request remains described as a pending action in the 11:55 entry it was written in, because it was still future then.

## Findings

One review was submitted so far: the review of `copilot-pull-request-reviewer` (5698444728, COMMENTED, 2026-10-29 13:27:55 UTC) on the head whose subject is `docs(pr-reviews): [#2681] record the post-merge finding F10 of PR 2688 with maintainer approval`. It carries no "didn't start before the timeout" warning. It lists two open issues, each with one inline thread (F1 and F2). Copilot was requested through the `request_copilot_review` MCP tool. da2ce7 was requested through the REST `requested_reviewers` endpoint.
- Reviewer finding ID: F1
- Source URL: <https://github.com/torrust/torrust-tracker/pull/2689#discussion_r4412888321>
- Concern: the new 2026-10-29 12:50 UTC Progress Log entry of the #2482 EPIC was inserted before the existing 2026-10-28 12:07 UTC entry, reversing chronology and leaving the log ending on an IN_PROGRESS statement after row 3's own completion statement.
- Solution: the finding was right. The content of neither entry had merged yet (the 12:07 entry merged earlier via PR #2682, but the misplaced 12:50 entry was new, unmerged content added only in this branch), so the fix moved the new entry below the already-merged one, restoring chronological order, instead of appending a further correction over an already-published mistake.
@da2ce7

da2ce7 commented Nov 25, 2026

Copy link
Copy Markdown
Contributor

Post-merge note: this pull request requested a review from this account and was closed without one at its final head. A post-merge review will not be done: It was approved at its final head commit 7642cf1 before it merged; the review request still shown is a stale re-request.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants