Repository navigation
chore(issues): archive closed EPIC #1978 spec to docs/issues/closed - #2685
Conversation
…sues/closed Co-authored-by: Copilot <[email protected]>
Co-authored-by: Copilot <[email protected]>
|
ACK 500ae90 |
There was a problem hiding this comment.
🔵 Needs a closer look
The live specification link in issue #1978 still points to the old open/ path and will return 404 after merge; update it to the closed/ path or record an explicit post-merge step.
No open issues 🎉
What changed in this PR
Archives the completed configuration schema v3.0.0 EPIC #1978 after all 17 subissues closed and documents how future configuration changes should be tracked.
Changes:
- Moves the EPIC specification to
closed/and updates completion metadata, acceptance criteria, and progress records. - Documents reopening before release and standalone, version-targeted issues after release.
- Updates the migration guide’s link to the archived specification.
| File | Description |
|---|---|
packages/configuration/docs/migrate-v2-to-v3.md |
Points the EPIC reference to its archived location. |
docs/issues/closed/1978-configuration-overhaul-epic/EPIC.md |
Records completion, archival, and the future-change policy. |
.github/skills/dev/planning/reopen-issue/SKILL.md |
Clarifies release-based rules for reopening EPICs. |
Review effort: Balanced
|
ACK 500ae90 |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 500ae90a3f8d96ce98a38a114d7599e841887f71 (post-merge). Recomputed from the bytes at the merged head, against the base fb278a684c3e81649801deaa749d914ec0757be6; the PR merged on 2026-10-28 at 17:13:58Z as db1789b66.
Label: POST_MERGE_FINDINGS — Review was requested on 2026-10-28 at 16:41:41Z. The PR merged before this round ran. The findings below stand at the merged head for a follow-up; no ACK follows a merged PR.
Claims and change: two commits change three Markdown files. The first archives the EPIC, changes lifecycle metadata and completion checks, records the release policy, and repairs the migration-guide link. The second adds the same policy to the reopening skill. No code or tests change. The description's separate-commit claim is correct; the native issue hierarchy, closure events and historical hook execution are not independently captured.
Records: closed-path metadata and the repository link repair are correct. All 15 relative Markdown links resolve. The folder-name search leaves historical review records and legacy-name examples, with no live old-path reference. The prescribed draft-child search finds no match. The new 16:40 archive entry and update stamp postdate both commits (F2). The existing evidence limitations from PR 2680 are inherited through PR 2684, not new implementation evidence here.
Hygiene: both commits have Conventional scoped subjects, matching author/committer identities and clean whitespace checks. The archive commit carries the issue tag; the independent skill-policy commit has a descriptive skills scope. Attribution footers are present; no applicable prohibition was found. No closing-keyword match occurs in the description, title or commits. Dictionary comparison finds no obvious new technical term requiring addition.
The review bot: review 5686489668 contains an actionable request to repair the issue's specification link or record a post-merge step, despite its no-open-issues summary. The capture has no inline thread, response addressing that request, or audit record. The old repository path is absent, but the issue body itself was not supplied, so the bot's live-link assertion cannot be accepted as verified. The missing disposition is F1.
Findings: F1 (Minor), unprocessed review-body concern; F2 (Minor), future-dated archive record.
Checked, no finding: preservation of archived content, current repository references, no draft children, and consistent before/after-release policy in the skill and EPIC. This PR completes the parent lifecycle deferred by PR 2684 after PR 2680; PR 2682 is independent.
Checks
On the loop's compute hub at the merged head, against the base fb278a684 (receipt server-gates-sojka-480; the PR merged as db1789b66): pre-commit profile gate exit 0 (94 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at the merged head and 16 / 4 at the base re-measured, the same 20 diagnostics by path and category. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 968099d93.
| epic: null | ||
| github-issue: 1978 | ||
| spec-path: docs/issues/open/1978-configuration-overhaul-epic/EPIC.md | ||
| spec-path: docs/issues/closed/1978-configuration-overhaul-epic/EPIC.md |
There was a problem hiding this comment.
[Minor][F1] Record a disposition for the unprocessed issue-link concern
This re-raises the review bot's 5686489668 concern as an unresolved review-processing gap. Its 16:54:50Z review body requests updating issue 1978's specification link or recording an explicit post-merge step. The capture contains no substantive response or disposition, and this merged tree has no PR 2685 audit. The issue body is not in the capture, so the asserted stale external link still needs independent verification; the moved repository path alone does not prove it. This concern is outside the file diff and is anchored to the new destination it concerns. Under process-pr-review's post-merge section, obtain a durable disposition and have the approved follow-up create the audit, retaining NON_RESOLVABLE for the body-only finding. If the issue still points at open/, repair it as part of that approved follow-up.
| - 2026-10-07 08:50 UTC - GitHub Copilot - Created subissue #2466 (bound the announce interval to what every delivery protocol can encode), reopened #1978 on GitHub, and linked #2466 natively; the specification PR then moves this specification back to `docs/issues/open/` - 16 of 17 subissues done | ||
| - 2026-10-28 13:35 UTC - GitHub Copilot - Archived the #2466 spec to `docs/issues/closed/` after PR #2680 merged and #2466 closed, and marked it `DONE` in the Subissues table; EPIC closure and AC4 are left for the maintainer to decide - Archive PR | ||
| - 2026-10-28 16:31 UTC - josecelano - Closed #1978 on GitHub, with all 17 linked subissues closed. Policy decided: this EPIC was reopened only to add #2466 because schema v3.0.0 is unpublished; while it stays unpublished the EPIC may be reopened the same way, and after the release changes become standalone issues planned for a target version - Chat decision | ||
| - 2026-10-28 16:40 UTC - GitHub Copilot - Marked AC4 and the closing checkpoints done, recorded the reopening policy in Risk 3, and archived this spec to `docs/issues/closed/` - Archive PR |
There was a problem hiding this comment.
[Minor][F2] Correct the archive event time that postdates its commit
The archive log and last-updated-utc say 16:40, but the archive commit 3cb18fa3e was authored and committed at 16:33:04Z, and the final skill-only commit 500ae90a3 at 16:33:57Z. No later commit carries a 16:40 update. Append a correction with the actual supported event time or an explicit clock-skew explanation, so the completion record can be used as chronology. This repeats the timestamp problem introduced by PR 2684 but concerns this PR's separate archival event.
Related to #1978.
Summary
Archives the specification for EPIC #1978, closed on GitHub on 2026-10-28 after its last subissue (#2466) merged, from
docs/issues/open/todocs/issues/closed/, and records the policy for later changes to configuration schema v3.0.0.Changes
docs/issues/open/1978-configuration-overhaul-epic/todocs/issues/closed/and setsstatus: done, the newspec-path, andlast-updated-utc.reopen-issueskill: while v3.0.0 is unpublished, the EPIC may be reopened to add a subissue, as was done for Bound announce intervals to what every delivery protocol can encode #2466; after the release, changes become standalone issues with a planned target version and the EPIC is not reopened.packages/configuration/docs/migrate-v2-to-v3.md. Closed specs already linked to theclosed/path. The older PR review audits that name the open path are left as historical records.The skill change is its own commit.
Validation
CLOSED, that all 17 sub-issues returned by the GitHub API are closed, and that no draft subissue remains (the Step 0.7 check printed nothing).docs/issues/open/AGENTS.mdremain.linter all) passed for both commits, and the closing-keyword scan of the commits found none.