Skip to content

chore(issues): archive closed issue #2670 spec to docs/issues/closed - #2679

Merged
josecelano merged 3 commits into
torrust:developfrom
josecelano:chore/archive-issue-2670-spec
Oct 28, 2026
Merged

josecelano merged 3 commits into
torrust:developfrom
josecelano:chore/archive-issue-2670-spec

Conversation

@josecelano

Copy link
Copy Markdown
Member

Related to #2670

Archives the spec of #2670 (row 9 of sub-EPIC #2482), which PR #2676 implemented and closed. The spec folder (ISSUE.md, evidence, retrospective and the baseline test list) moves from docs/issues/open/ to docs/issues/closed/, its status becomes done, and the remaining checkpoint boxes that are now true are ticked.

Live references are repaired: row 9 of the #2482 Subissues table is DONE with a Progress Log entry, the inventory row says "Resolved by #2670", and the audits of PR #2671 and PR #2676 point at the new path. Docs only; no code, workflow or Containerfile change.

Copilot AI balanced review requested due to automatic review settings October 28, 2026 09:40

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Warning

Copilot couldn't run its full agentic review because it didn't start before the timeout. Make sure your repository has a runner available, or add a copilot-code-review.yml file specifying one with the runs-on attribute. See the docs for more details.

Copilot review overview

No open issues 🎉

What changed in this PR

Archives the closed spec for issue #2670 by updating documentation references to the new docs/issues/closed/ location and marking the work as DONE in the #2482 tracking docs.

Changes:

  • Update PR review artifacts to reference the archived issue spec path under docs/issues/closed/.
  • Update the #2670 issue spec metadata/status and completion checklists, and add an archive progress-log entry.
  • Update #2482 EPIC/inventory docs to mark row 9 as DONE/Resolved and fix links + timestamps.
File Description
docs/​pr-reviews/​pr-2676-review/​PR-REVIEW.md Updates related artifact link to the archived #2670 spec path.
docs/​pr-reviews/​pr-2671-review/​PR-REVIEW.md Updates related artifact and verification references to the archived #2670 spec path.
docs/​issues/​open/​2670-2482-build-shipped-artifacts-without-test-features/​manual-verification-evidence.md Updates issue-spec pointer to the closed spec path and refreshes timestamp.
docs/​issues/​open/​2670-2482-build-shipped-artifacts-without-test-features/​implementation-retrospective.md Updates related-artifacts links to closed paths.
docs/​issues/​open/​2670-2482-build-shipped-artifacts-without-test-features/​ISSUE.md Marks status as done, updates spec-path, ticks archive checklist items, and adds a progress-log entry.
docs/​issues/​open/​2482-1669-reorganize-shared-test-support/​test-support-inventory.md Marks row 9 as resolved and updates the link to the closed spec path.
docs/​issues/​open/​2482-1669-reorganize-shared-test-support/​EPIC.md Marks subissue row 9 as DONE, updates link to closed spec path, and adds a progress-log entry.

Review effort: Lite

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟢 Approval recommended

No active review issues were identified for this documentation-only archival and reference-update change.

No open issues 🎉

Review effort: Balanced

@josecelano

Copy link
Copy Markdown
Member Author

ACK e66f1f7

@josecelano
josecelano merged commit 883cc83 into torrust:develop Oct 28, 2026
22 checks passed

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at e66f1f7f9fe276de3cd34c52c4c90cd159935f7e (post-merge). Recomputed from the bytes at the merged head, against the base 09263a46c; the PR merged on 2026-10-28 at 11:46:03Z as 883cc834c.

Label: POST_MERGE_FINDINGS — Review requested 2026-10-28T11:35:23Z; the PR merged before this round ran. The findings below stand at the merged head for a follow-up; no ACK follows a merged PR.

Scope: three commits, nine files, +103/-20. The four-file issue folder moves to closed; the baseline list is byte-identical, while metadata, completion prose and links change. The parent row is DONE and the inventory links to the archive. This builds directly on PR #2676; it changes no code or tests.

Records: an audit record does exist in this head, with an empty findings table and two review-log entries. The closed primary spec has status done, a matching spec-path, updated timestamp and an archive entry. Repository search by the whole folder slug found no remaining live open-path reference; all changed Markdown file targets resolve. F1 and F2 concern consistency and historical evidence, not missing moved files.

The review bot: two reviews, both on the initial archive commit. The first reports a timeout and no findings; the second has no actionable finding. The capture shows no inline threads. No implementation remediation was needed for either review. The later request to this account is present in the timeline after the audit was written.

Hygiene: conventional subjects and matching identities; attribution footers are present without a located prohibition. The archive subject follows the cleanup skill’s own form. The description has no closing-pattern match. Changed document timestamps precede their carrying commits. The completed-work claims inherited from PR #2676 retain that review’s execution-evidence limits.

Findings: F1 and F2 Minor. Checked, no finding: complete folder move, metadata paths, parent/inventory navigation, unchanged baseline bytes and the absence of actionable bot threads.

Checks

On the loop's compute hub at the merged head, against the base 09263a46c (receipt server-gates-sojka-483; the PR merged as 883cc834c): pre-commit profile gate exit 0 (129 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at the merged head and 16 / 4 at the base re-measured, the same 20 diagnostics by path and category; the audit validator over docs/pr-reviews/pr-2679-review/PR-REVIEW.md with the review comments and commit list captured at gate time: ok, 0 rows, 2 log entries, 0 failures. GitHub checks at this head at posting time: "Publish (Development): completed/skipped; Publish (Release): completed/skipped; Context: completed/success; Package Coverage (${{ matrix.package }}): completed/skipped; Package Coverage Regression: completed/success; Test (Docker) (release): completed/success; Docker E2E: completed/skipped; Build on macos-latest (nightly): completed/success; Build on windows-latest (nightly): completed/success; Build on macos-latest (stable): completed/success; Build on windows-latest (stable): completed/success; Build on ubuntu-latest (stable): completed/success; Build on ubuntu-latest (nightly): completed/success; Shipped Features: completed/success; Discover Package Coverage: completed/success; Layer Boundary Bans: completed/success; Unit (nightly): completed/success; Unit (stable): completed/success; Workspace Packaging: completed/success; Generate Coverage Report: completed/success; Docs Lint: completed/success; Documented Clippy Allows: completed/success". At posting, develop is 968099d93.

doc-type: issue
issue-type: task
status: in-review
status: done

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F1] Reconcile the remaining in-progress task when archiving

The archive now declares the issue done and checks completion, but T4 still says IN_PROGRESS despite M6 and AC3 already recording its hosted run as complete. Update that task status as part of the archival reconciliation. The task row is unchanged and outside the diff, so this is anchored to the newly terminal status. This repeats the unresolved record inconsistency identified as F2 in the post-merge review of PR #2676.

Commit Points rows for T2 and T3 require the recorded review and the maintainer's review before their commit.
- Current-tree verification: `.github/skills/dev/planning/create-issue/SKILL.md` lines 180 to 194 describe the
loop; `grep -n "Arrange-Act-Assert" docs/issues/open/2670-2482-build-shipped-artifacts-without-test-features/ISSUE.md`
loop; `grep -n "Arrange-Act-Assert" docs/issues/closed/2670-2482-build-shipped-artifacts-without-test-features/ISSUE.md`

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Minor][F2] Preserve the commands recorded by the earlier review

These are historical verification commands in the audit of PR #2671, whose head had only the open path; changing them to the closed path makes the record describe a command that could not have produced the stated result at that head. The cleanup skill’s Step 4 explicitly distinguishes immutable historical records from live navigation. Keep the frontmatter navigation update, restore the commands at lines 70, 89 and 105, and append an archive-location note if a current rerun command is useful.

This branch was previously deployed

1 inactive deployment
coverage — e66f1f7f Deployed Oct 28, 2026 by josecelano via Generate Coverage Report #2842
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants