docs(issues): [#2668] add issue specification for shutdown policy configuration - #2669
Conversation
Refresh the SI-20 draft against develop (listener drain budget, chained budget model, second hard-coded deadline, health-check drain) and move it to docs/issues/open/2668-1488-si-20-configure-shutdown-policy/. The spec places the shutdown settings in an application-level [application.shutdown] table. Drop the skeleton verification.md, mark EPIC torrust#1488 roadmap row 20 as planned with the issue number, and repair the links to the old draft path. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
There was a problem hiding this comment.
🟡 Changes recommended
The verification plan contains invalid inputs and a nonexistent test target, and required pre-review bug-reproduction evidence is missing.
3 open issues
What changed in this PR
This spec-only PR prepares issue #2668, the shutdown-policy configuration task in EPIC #1488. It defines planned behavior without changing runtime code, tests, or configuration.
Changes:
- Defines four shutdown budgets, their validation rule, configuration placement, exit outcomes, and deployment requirements.
- Adds implementation tasks, verification scenarios, acceptance criteria, and rollback guidance.
- Moves SI-20 into the open issue collection and updates roadmap and documentation references.
| File | Description |
|---|---|
docs/issues/open/2668-1488-si-20-configure-shutdown-policy/ISSUE.md |
Adds the refreshed shutdown-policy specification. |
docs/issues/open/1488-overhaul-tracker-shutdown/ISSUE.md |
Marks SI-20 planned and links issue #2668. |
docs/issues/drafts/1488-si-8-configurable-grace-periods/verification.md |
Redirects verification ownership to the new spec. |
docs/issues/drafts/1488-si-8-configurable-grace-periods/ISSUE.md |
Updates the superseding SI-20 link. |
docs/issues/drafts/1488-si-20-configure-shutdown-policy/verification.md |
Removes the obsolete evidence skeleton. |
docs/issues/drafts/1488-si-20-configure-shutdown-policy/ISSUE.md |
Removes the draft replaced by the open spec. |
docs/issues/closed/2412-1488-si-16-migrate-standalone-http-environment/ISSUE.md |
Updates the SI-20 metadata reference. |
docs/issues/closed/2410-1488-si-22-process-queued-events-before-listeners-stop/EPIC.md |
Updates the SI-20 metadata reference. |
docs/issues/closed/2370-1488-si-15-define-udp-active-request-policy/ISSUE.md |
Updates the SI-20 metadata reference. |
docs/features/shutdown-process/questions.md |
Corrects the planned verification evidence filename. |
Review effort: Balanced
…atter Set related-pr to the spec-only pull request and log its opening. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
… a failed shutdown Reproduce the false-success exit code on the real binary before review and record it in manual-verification-evidence.md: an aborted and a failed component both give exit status 0 and the success message, with SIGTERM and SIGINT, once a temporary fault-injection patch makes a component fail. Four network attempts on the unmodified binary did not fail a component, and the evidence says so. Replace the not-applicable bug sections with the workflow link, the regression boundary and the recheck plan, split T3 into a red test and the fix, mark T1 done, rewrite scenarios M1 and M5, and record the disposable script. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
…orrust#2668 checks The Automatic Checks listed `cargo test --test integration`, which selects the integration targets of other workspace packages and never runs the root package's native-binary lifecycle tests. Name the registered lifecycle-signals target instead, and make T6 register its new test files as [[test]] targets, because Cargo does not discover files in subdirectories of tests/. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
…own chain rule Scenario M3 left the UDP drain at its 5 s default, so max(2, 5) + 1 = 6 is not below the 5 s deadline and startup would reject the configuration before the scenario reached the HTTP drain failure it shows. Set udp_request_drain_in_secs to 1, and check every other worked example against max(H, U) + L < P. Give M4 six explicit configurations with their arithmetic, and use a 3 s HTTP drain in M6 and the temporary fault-injection patch in M7, because a held request ends within about 5 s on its own. Name the M3 budgets in T6. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
Record the three findings of the Copilot review of 2669 with their fixes, replies and resolution, and the correction to the finding about the integration test target. Related to torrust#2668 Co-authored-by: Copilot <[email protected]>
|
ACK 65faa45 |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 65faa45b13ee4845410ac1747fab393afa16e1b3 (post-merge). Recomputed from the bytes at the merged head, against the base 72fbeacc1; the PR merged on 2026-10-27 at 10:57:14Z as 802612dce.
Label: POST_MERGE_FINDINGS — Review requested at 2026-10-27T08:10:56Z; the PR merged before this round ran. Findings below stand at the merged head for a follow-up; no ACK follows a merged PR.
Specification: the four budgets, 25/15/5/5 defaults, strict chain rule, optional application section, two production deadline consumers and intended exit mapping are coherent with the existing lifecycle. D5 intentionally leaves delivery design for the first implementation review. The corrected worked examples satisfy the rule; M4 distinguishes rejected cases from the accepted 19+5<25 boundary. The issue template's planning, ownership, bug-process, regression, commit-point and verification sections are present.
Records and bot: agree with R2 (missing bug-workflow evidence), R3 (wrong test target) and R1 (invalid M3 arithmetic). The audit maps them to F1/F2/F3, with matching source/reply threads, fix subjects and resolved states. The R3 reply correctly distinguishes the root target from similarly named workspace targets: the old command would not run the lifecycle tests. The embedded temporary patch preserves the existing outcome path while injecting failure or delay, and no such patch reaches runtime source here. Its execution remains reported evidence. The record incorrectly calls an attempt after the first review a pre-review event.
Change and hygiene: recomputed six commits, fourteen files, +1048/-312. Runtime source and manifests are unchanged; the added shell harness and baseline TOML are verification artifacts, qualifying the body's broad “no code or configuration” wording. The shell parses, but readiness is not bounded by its advertised watchdog. Subjects are Conventional with scopes and issue references; identities match, whitespace checks are clean, and attribution footers have no applicable prohibition. No closing-keyword match occurs in the title, body or commit messages. Changed Markdown file links and checked heading targets resolve.
Group relationship: follows the health-environment migration/archive in PRs 2652/2664. PR 2678 implements this policy, revises D5 and removes the disposable harness. PR 2686 archives the specification.
Findings: F4/F5 below, both Minor. F4 concerns this historical head; the harness is absent after PR 2678.
Checked, no finding: budget arithmetic; lifecycle target registration; no runtime fault injection; audit reply targets; optional-schema migration plan; explicit distinction between unmodified attempts and injected reproduction.
Checks
On the loop's compute hub at the merged head, against the base 72fbeacc1 (receipt server-gates-sojka-469; the PR merged as 802612dce): pre-commit profile gate exit 0 (94 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at the merged head and 16 / 4 at the base re-measured, the same 20 diagnostics by path and category; the audit validator over docs/pr-reviews/pr-2669-review/PR-REVIEW.md with the review comments and commit list captured at gate time: ok, 3 rows, 3 log entries, 0 failures. GitHub checks at this head at posting time: "Publish (Release): completed/skipped; Publish (Development): completed/skipped; Context: completed/success; Test (Docker) (release): completed/success; Docker E2E: completed/skipped; Unit (stable): completed/success; Workspace Packaging: completed/success; Unit (nightly): completed/success; Documented Clippy Allows: completed/success; Layer Boundary Bans: completed/success; Package Coverage (${{ matrix.package }}): completed/skipped; Package Coverage Regression: completed/success; Discover Package Coverage: completed/success; Generate Coverage Report: completed/success; Build on windows-latest (nightly): completed/success; Build on windows-latest (stable): completed/success; Build on ubuntu-latest (nightly): completed/success; Build on macos-latest (stable): completed/success; Build on macos-latest (nightly): completed/success; Build on ubuntu-latest (stable): completed/success; Docs Lint: completed/success". At posting, develop is 968099d93.
| sleep 0.1 | ||
| done | ||
| for _ in $(seq 1 100); do | ||
| curl -fsS -o /dev/null http://127.0.0.1:11313/health_check 2>/dev/null && break |
There was a problem hiding this comment.
[Minor][F4] Bound readiness before starting the shutdown watchdog
The readiness curl has no connection or total timeout, and the 40-second watchdog is not started until line 44, after both readiness loops and the held-connection setup. A server that accepts the probe but never answers can therefore leave this script and its child running indefinitely; exhausting either loop also continues without proving readiness. This contradicts the script's bounded-run claim and the specification's absolute-deadline requirement. Use a bounded readiness deadline, fail if readiness is not established, and ensure child cleanup on that path. PR 2678 later deletes this disposable harness, so the defect is historical rather than live on the current target.
| | Step | Status | | ||
| | ----------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | ||
| | Analysis and hypothesis | Done. `main` discards the supervisor outcomes and always logs success (`src/main.rs`, read from source). Hypothesis: a failed or aborted component still gives exit `0`. | | ||
| | Real-artifact reproduction | Done before review: **Reproduced, with a temporary fault-injection patch** (V1 in [manual-verification-evidence.md](manual-verification-evidence.md)). Exit `0` and the success message for an aborted component and for a failed one, with SIGTERM and SIGINT. Four network attempts on the unmodified binary did not fail a component, and the evidence says so. | |
There was a problem hiding this comment.
[Minor][F5] Record the reproduction as a response to review
The row says the reproduction was done before review, and the T1 row and 09:02 progress entry repeat that chronology. The capture places the review request at 08:10:56Z and the review bot's review at 08:27:54Z; the evidence itself dates the reproduction attempts to 08:45–08:58Z. The attempt addresses the missing-evidence finding, but cannot establish compliance with the earlier pre-review checkpoint. Correct the mutable summary and append a chronology correction to the progress log: this was performed after the first review and before the 09:17 reply. Preserve the distinction from the planned final implementation recheck.

Related to #2668
Spec-only PR for SI-20 (roadmap row 20) of EPIC #1488, "Configure shutdown policy and deployment contract". No code, tests or configuration change; implementation follows after this merges.
Summary
developafter sub-EPIC SI-22 and SI-23/24, and moves it todocs/issues/open/2668-1488-si-20-configure-shutdown-policy/ISSUE.md. Every claim read from source and not run is marked as such.max(HTTP drain, UDP drain) + listener drain < process deadline. With the Q4 defaults plus SI-22's 5 s listener budget the chain is 25 s with no slack, so the spec proposes a 15 s HTTP drain default (decision D1, approved by the maintainer).src/app.rs, and a drain that reaches its budget is reported asJobStatus::Failed.[application.shutdown]table (approved by the maintainer) and records the candidate section names with their pros and cons, the other application-level values found in source, and decisions D1 to D10.manual-verification-evidence.md. Four network attempts on the unmodified binary did not fail a component; with a temporary fault-injection patch (embedded in the evidence, reverted, not committed) an aborted and a failed component both exit 0 with the success message, for SIGTERM and SIGINT.verification.md(the evidence goes inmanual-verification-evidence.md), marks EPIC Overhaul: Tracker Shutdown #1488 roadmap row 20 as planned with the issue number, and repairs the links to the old draft path in SI-8 and in three closed specs.Files
docs/issues/open/2668-1488-si-20-configure-shutdown-policy/(ISSUE.md,manual-verification-evidence.md,evidence/hold-and-stop.sh,evidence/baseline.toml),docs/issues/open/1488-overhaul-tracker-shutdown/ISSUE.md,docs/features/shutdown-process/questions.md,docs/issues/drafts/1488-si-8-configurable-grace-periods/(two files), the closed specs of #2370, #2412 and #2410 (frontmatter links only),docs/pr-reviews/pr-2669-review/PR-REVIEW.md, and the removed draft underdocs/issues/drafts/1488-si-20-configure-shutdown-policy/.Validation
TORRUST_GIT_HOOKS_LOG_DIR=.tmp ./contrib/dev-tools/git/hooks/pre-commit.shpassed (all 9 steps, includinglinter all, the staged frontmatter validator andcargo test --doc --workspace) for every commit, and the pre-push hook passed for each push. The commit-id check from theopen-pull-requestskill printed nothing.python3 .github/skills/dev/pr-reviews/process-pr-review/scripts/validate-audit-record.py --pr-number 2669exits 0.Review
The Copilot review (three inline threads) is processed in
docs/pr-reviews/pr-2669-review/PR-REVIEW.md: one signed fix commit per finding, a reply on each thread naming the fixing commit's subject, and all three threads resolved.Head to merge
The branch has six commits, in this order:
docs(issues): add issue specification for #2668(the specification),docs(issues): record the spec pull request in the #2668 frontmatter(setsrelated-pr), then the three review fixesdocs(issues): record the pre-review reproduction of exit code 0 after a failed shutdown,docs(issues): use the registered lifecycle-signals test target in the #2668 checksanddocs(issues): make the #2668 worked examples satisfy the shutdown chain rule, and finallydocs(pr-reviews): record the review audit for pull request 2669. Merge the head, which is the last one, the audit commit.