Repository navigation
chore(issues): archive closed issue #2628 spec to docs/issues/closed - #2644
Conversation
…closed Co-authored-by: Copilot <[email protected]>
|
ACK 0af1e95 |
There was a problem hiding this comment.
🟢 Approval recommended
The documentation-only archive consistently reflects the confirmed issue closure and implementation merge, with no unresolved findings.
No open issues 🎉
What changed in this PR
Archives issue #2628’s documentation after the protocol-helper migration merged in PR #2636, keeping the shared-test-support EPIC and related references current. No runtime code changes.
Changes:
- Moves the issue specification, verification evidence, and retrospective to
docs/issues/closed/and updates their metadata. - Marks EPIC #2482 row 2 as done while leaving unfinished EPIC criteria open.
- Updates the inventory and coupling report links to the archived specification.
| File | Description |
|---|---|
docs/issues/open/2482-1669-reorganize-shared-test-support/test-support-inventory.md |
Points the resolved protocol-helper entry to the archive. |
docs/issues/open/2482-1669-reorganize-shared-test-support/EPIC.md |
Records row 2 completion and updates subissue status. |
docs/issues/open/1669-overhaul-packages/workspace-coupling-report-2026-10-06.md |
Updates the subissue link and completion label. |
docs/issues/closed/2628-2482-move-test-helpers-protocol-helpers/manual-verification-evidence.md |
Updates the archived issue reference and timestamp. |
docs/issues/closed/2628-2482-move-test-helpers-protocol-helpers/ISSUE.md |
Records completed status, archive location, and closure. |
docs/issues/closed/2628-2482-move-test-helpers-protocol-helpers/implementation-retrospective.md |
Updates related-artifact paths to the archive. |
Review effort: Balanced
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 0af1e95b2018ff3c85ff9a1a29654e7e2baaa724 (post-merge). Recomputed from the bytes at the merged head, against the merge base 849f5a809; the PR merged on 2026-10-25 at 06:41:51Z as 2451f97bb.
Label: POST_MERGE_FINDINGS — the review was requested at 06:27:59Z and the PR merged at 06:41:51Z, before this round ran. The findings below stand at the merged head for a follow-up; no ACK follows a merged PR.
Archive steps. The three files moved at 96, 97 and 98% similarity. In ISSUE.md:
statusgoes fromin-reviewtodone.spec-pathbecomes theclosed/path, andrelated-pr: 2636stays.- The stamp becomes 06:20.
- The last checkpoint is ticked, and a log entry is appended.
The retrospective's two frontmatter paths and the evidence file's issue-spec and stamp follow. Row 2 of #2482 is DONE with the new path, the "GitHub issues" paragraph is corrected, and a log entry is appended. Every task row (T1 to T5), scenario and criterion of the spec was already DONE, so the stale-row and unbumped-stamp classes of earlier archives do not recur. One statement is incomplete (F1).
Ticks. The only box this commit ticks is the archive checkpoint, and it holds: the issue closed at 20:54:59Z and the folder moves here. The EPIC entry's claims hold at the merged #2636 head 9e5c38005 and at this head. test-helpers depends directly only on rand, configuration, tracing and tracing-subscriber, and deny.toml bans client-lib, core, events and swarm-coordination-registry for it. No criterion is ticked in this commit, on anyone's word or otherwise.
References. The 66 body links and 30 frontmatter paths in the changed files resolve. The folder-name search over docs/, .github/ and contrib/ finds only the three repaired links outside the moved folder. Inside it, the open/ paths name documents that are still open, plus the 16:23 log entry, which is history. The coupling report's edit is not dated (F2).
Issue and merges. Issue 2628 closed as completed at 20:54:59Z, one second after #2636 merged as 722f2b5b2. The spec's related-pr: 2636, both new log entries and the row note agree with that. The 06:20 stamps follow the close and precede the commit, which was authored at 06:21:43Z and committed at 06:25:34Z. The inventory's date-only stamp moves to 2026-10-25.
Hygiene.
- The subject is the skill's template without a tag, like
144b81288and87daddf9dondevelop;f4ee048a1andc19fca7d1carry one. - The body holds only the footer. Author equals committer.
- The footer is an attribution line, which no rule in the tree forbids.
git diff --checkis clean.- The commit-id check prints nothing. Run verbatim, it is vacuous after the merge, because no file is in
develop...HEAD. Against the merge base, it scans 12 hex tokens and prints none. - The description carries no closing keyword ("Related to #2628"), and
project-words.txtis unchanged. - The #2641 merge, which the PR's base had moved to, touches none of these files, and the merge commit's tree matches the head for them.
The review bot. One summary at 06:44:21Z, after the merge, with no inline comment. Each row of its file table matches the diff and is agreed. It raises neither F1 nor F2.
Findings
- F1 Nit: the EPIC log entry lists AC4, AC6, AC7 and AC8 as staying open, but AC1 is open too.
- F2 Suggestion: the dated coupling report now states a later fact without saying when it was added.
Checked, no finding: similarity; frontmatter for closed/; the checkpoint; row 2 and the paragraph; the EPIC claims against #2636; link repairs; stamps; the issue and merge facts; hygiene; the bot.
Checks
On the loop's compute hub at the merged head, against the merge base 849f5a809, the #2642 merge (receipt server-gates-sojka-459; the PR merged onto the #2641 merge 1b6129768, and develop has since moved to 5124c66e2): pre-commit profile gate exit 0 (85 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at this head and 16 / 4 at the base re-measured, the same 20 diagnostics by path and category, none in the six files this PR touches. No Rust changes, so no cargo step. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 5124c66e2.
| evidence cell now says (the 07:32 entry's parenthesis "the maintainer approved ... the written | ||
| ADR" is corrected by this entry). | ||
| - 2026-10-23 16:23 UTC - AI assistant (Copilot SDK in VS Code, #2482 subissue 2) - Created issue #2628 (row 2), linked it as a subissue of #2482 and moved its spec to `docs/issues/open/`; row 2 is IN_PROGRESS. | ||
| - 2026-10-25 06:20 UTC - AI assistant (Copilot SDK in VS Code, #2482 subissue 2) - Subissue 2 (#2628) is done: PR #2636 merged on 2026-10-24 (merge commit `722f2b5b2`) and #2628 is closed; its spec is archived. Row 2 of the Subissues table is DONE. `torrust-tracker-test-helpers` now depends directly only on `rand`, `configuration`, `tracing` and `tracing-subscriber`, and `deny.toml` bans `client-lib`, `tracker-core`, `swarm-coordination-registry` and `events` for it. No EPIC acceptance criterion or checkpoint became true with this row alone: AC4 (rows 3 to 9 are still drafts), AC6, AC7 and AC8 stay open, and the per-subissue checkpoints cover every subissue. Next row: 8. |
There was a problem hiding this comment.
[Nit][F1] AC1 is open too
The entry says that no EPIC criterion became true with row 2, and names the ones that 'stay open': AC4, AC6, AC7 and AC8. AC1 (the inventory covers every workspace member and pattern) is also unticked at line 438 and TODO at line 459. A reader who relies on the list would take AC1 as done. The PR description repeats the same list. 'AC1, AC4, AC6, AC7 and AC8 stay open' would match the table.
| ([`2482-1669-reorganize-shared-test-support`](../2482-1669-reorganize-shared-test-support/EPIC.md)). | ||
| Subissue draft: | ||
| [move the `test-helpers` protocol helpers to their consumer](../2628-2482-move-test-helpers-protocol-helpers/ISSUE.md). | ||
| Subissue (done, #2628): |
There was a problem hiding this comment.
[Suggestion][F2] A dated report now states a later fact without saying so
The report says 'Generated: 2026-10-06 16:35 UTC' and has no last-updated-utc. This line now says the subissue is done, which became true on 2026-10-24. Step 4 of cleanup-completed-issues asks for the link repair on the next line, but not for the added status, and nothing marks the status as later than the report. The pointer lines of this finding were also edited in place on 2026-10-08, 2026-10-21 and 2026-10-23, none of them marked, so this follows the file's practice. A one-line note under 'Generated' that dates the later pointer updates would tell a reader which facts postdate the report.
Related to #2628
Archives the specification of the closed issue #2628 (row 2 of sub-EPIC #2482), as the maintainer asked after PR #2636 merged. No code changes.
Summary of changes
ISSUE.md,manual-verification-evidence.md,implementation-retrospective.md) moves fromdocs/issues/open/todocs/issues/closed/;ISSUE.mdgetsstatus: done, the newspec-path, a ticked "Issue closed and spec moved" checkpoint and a Progress Log entry, and the other two files get their new paths and stamps.Files and packages touched
Only
docs/issues/: the moved #2628 folder, the #2482 EPIC, the test support inventory and the workspace coupling report.Validation performed
The pre-commit gate passed (
linter all, which includes the local link check),git diff --cached --checkwas clean, and the commit-id check printed nothing.