Skip to content

chore(issues): archive closed issue #2416 spec to docs/issues/closed - #2632

Merged
josecelano merged 1 commit into
torrust:developfrom
josecelano:chore/archive-2416-spec
Oct 24, 2026
Merged

josecelano merged 1 commit into
torrust:developfrom
josecelano:chore/archive-2416-spec

Conversation

@josecelano

Copy link
Copy Markdown
Member

Archives the spec for issue #2416 (closed on GitHub; PR #2623 merged on 2026-10-24) from docs/issues/open/ to docs/issues/closed/.

…pec to docs/issues/closed

Issue torrust#2416 is closed on GitHub and PR torrust#2623 is merged. Move the spec folder,
set status done, tick the acceptance criteria at the maintainer's instruction
(his review and merge count as the acceptance review), repoint the live
references (the sub-EPIC Subissues row, the ADR link, the review audit's
related artifacts, the moved files' relative links and frontmatter) and add the
progress-log entries. The sub-EPIC is not closed here.

Co-authored-by: Copilot <[email protected]>
Copilot AI balanced review requested due to automatic review settings October 24, 2026 12:27
@josecelano josecelano self-assigned this Oct 24, 2026
@josecelano
josecelano requested a review from da2ce7 October 24, 2026 12:33

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟢 Approval recommended

The archival and reference updates match the documented closure and acceptance, preserve supporting evidence, and have no identified blocking issues.

No open issues 🎉

What changed in this PR

Archives issue #2416’s specification and supporting evidence after the shutdown-order implementation merged in PR #2623. This updates the documentation lifecycle without changing tracker behavior or closing parent sub-EPIC #2410.

Changes:

  • Moves the issue folder to docs/issues/closed/ and records maintainer acceptance.
  • Updates live links, metadata, and the parent sub-EPIC’s completion record.
  • Preserves the verification harness, configuration, logs, and review artifacts.
File Description
docs/​pr-reviews/​pr-2623-review/​PR-REVIEW.md Repoints issue metadata to the archive.
docs/​issues/​open/​2410-1488-si-22-process-queued-events-before-listeners-stop/​EPIC.md Marks #2416 done and records archival.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​manual-verification-evidence.md Updates the issue reference and harness path.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​ISSUE.md Records acceptance and updates archived links.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​implementation-retrospective.md Updates artifact and parent links.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​run_m1.py Archives the mixed-protocol verification harness.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m3-race-failed-start.tracker.log Preserves failed-start evidence.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m3-race-2.tracker.log Preserves the second race-run log.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m3-race-2.summary.txt Preserves second race-run counts.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m3-race-1.tracker.log Preserves the first race-run log.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m3-race-1.summary.txt Preserves first race-run counts.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m2-control-wait10.tracker.log Preserves the ten-second control log.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m2-control-wait10.summary.txt Preserves ten-second control results.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m2-control-wait1.tracker.log Preserves the one-second control log.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m2-control-wait1.summary.txt Preserves one-second control results.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m1-tracker.toml Archives the mixed-protocol test configuration.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​evidence/​m1-burst.tracker.log Preserves mixed-protocol shutdown evidence.
docs/​issues/​closed/​2416-2410-si-22-4-stop-producers-before-listeners/​agent-review-reports.md Updates the archived issue reference.
docs/​adrs/​20261021184946_order_shutdown_by_event_flow_and_drain_event_listeners.md Repoints the implementation link to the archive.

Review effort: Balanced

@josecelano

Copy link
Copy Markdown
Member Author

ACK f4ee048

@josecelano
josecelano merged commit 8f8b4d7 into torrust:develop Oct 24, 2026
21 checks passed

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at f4ee048a1a419fcba23fd8c5cb2161e3d944b93a (post-merge). Recomputed from the bytes at the merged head, against the merge base a743450b0; the PR merged on 2026-10-24 at 12:53:48Z as 8f8b4d714.

Label: POST_MERGE_FINDINGS — this review was requested at 12:33:59Z, and the PR merged at 12:53:48Z, before this round ran. The findings below stand at the merged head for a follow-up, and no ACK follows a merged PR.

The archive steps. Checked against cleanup-completed-issues 1.12:

  • #2416 is closed (12:19:09Z, completed).
  • The folder moved, and every evidence file moved at 100% similarity. The four Markdown files changed only for the move's paths and the closure edits.
  • ISSUE.md has status: done, a spec-path under closed/, and last-updated-utc 12:20, which is what the frontmatter validator requires of a closed spec.
  • The sub-EPIC row is DONE with the archived link, and its stamp and log entry are 12:21. Both stamps precede the commit (12:21:55Z).
  • The ADR link, the audit's related artifact, and the moved files' frontmatter and relative links are repointed.

One file's stamp was not refreshed (F3).

The ticks.

  • Verified by the #2623 reviews: AC1, AC2, and the rejection and bus declarations of AC6 were checked against the code. The orchestrator's test runs at the round-1, round-2 and round-4 heads (library, lifecycle and persistence targets, and the HTTP, UDP and helper suites) passed, and a stop-order mutant was caught. No code changed after round 4. AC4 and AC5 were read in round 1.
  • Verified more narrowly: AC3 through the retained logs, hashes and V5's counts, not a rerun.
  • Not run by the reviews: AC6's bus retention, and linter all itself (the gates ran the pre-commit profile and three lints).
  • On the maintainer's decision alone: the workflow checkpoint and the ACCEPTED rows. The new log line states that decision.

No template or skill defines ACCEPTED. The skill lets an archive tick checkboxes "based on the actual content of the spec body". The archive entries of #2414 and #2415 record the same decision, but they cite an ACK of the PR head and keep their rows at DONE (F2). The T10 row still leaves the acceptance review to the maintainer (F1).

References. 80 relative links and fragments in the seven changed Markdown files resolve. lychee excludes docs/issues/closed/, so nothing else checks the moved files. The old folder path survives only in verification commands of the #2614 and #2623 audits, which record where those commands ran, and the skill allows keeping them. The evidence file's harness command now names the archived path.

The issue and the merges. PR #2623 merged at 12:19:07Z as a743450b0; related-pr is 2623, and both logs say 12:19. #2410 is open, as the sub-EPIC entry says.

Hygiene.

  • The subject is chore(issues) with [#2416]. Earlier archive commits used the same type and scope without the tag, and no rule requires either.
  • Author and committer match.
  • The commit carries an attribution footer naming the review bot's account; no rule in the tree forbids it.
  • git diff --check is clean.
  • The commit-id check, run verbatim, prints nothing, because nothing differs from develop after the merge. Against the merge base, every commit token in the changed files is on it.
  • project-words.txt is unchanged.

The review bot. Review 5638277500 has no inline comment and recommends approval. Its summary of the changes is accurate, and it does not raise F1 to F3.

Findings

  • F1 Nit: the T10 row still leaves the acceptance-criteria review to the maintainer.
  • F2 Nit: "as for #2414 and #2415" does not hold: those rows read DONE, and those entries cite an ACK of the PR head.
  • F3 Nit: the evidence file changed but keeps last-updated-utc 2026-10-23 16:22.

Checked, no finding: rename similarities; the frontmatter against the validator; the issue, merge and sub-EPIC states; the stamps against the commit; links; old-path references; the commit-id check; the footer.

Checks

On the loop's compute hub at the merged head, merge base a743450b0, the #2623 merge (receipt server-gates-sojka-442; develop is the merge commit 8f8b4d714): pre-commit profile gate exit 0 (91 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 16 errors / 4 warnings at this head and 16 / 4 at a743450b0 re-measured, the same 20 diagnostics by path and category, none in the nineteen files this PR touches; no Rust changes, so no cargo step. GitHub checks at this head at posting time: "Publish (Development): completed/skipped; Publish (Release): completed/skipped; Context: completed/success; Package Coverage (${{ matrix.package }}): completed/skipped; Package Coverage Regression: completed/success; Docker E2E: completed/skipped; Layer Boundary Bans: completed/success; Unit (stable): completed/success; Documented Clippy Allows: completed/success; Unit (nightly): completed/success; Discover Package Coverage: completed/success; Workspace Packaging: completed/success; Generate Coverage Report: completed/success; Build on windows-latest (nightly): completed/success; Build on macos-latest (nightly): completed/success; Build on ubuntu-latest (stable): completed/success; Build on windows-latest (stable): completed/success; Build on ubuntu-latest (nightly): completed/success; Build on macos-latest (stable): completed/success; Test (Docker) (release): completed/success; Docs Lint: completed/success". At posting, develop is 8f8b4d714.

- [x] GitHub issue created and linked to the sub-EPIC
- [x] Design-review checkpoint after T8 recorded (sub-EPIC record entry 31)
- [ ] Implementation completed and acceptance criteria reviewed
- [x] Implementation completed and acceptance criteria reviewed

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F1] T10 still leaves the acceptance-criteria review to the maintainer

This line ticks 'acceptance criteria reviewed', and AC1 to AC6 and the evidence rows now read as accepted. But the T10 row (line 108, unchanged) still ends 'Left for the maintainer: the acceptance-criteria review.', so the archived spec now says both. A follow-up could close that note with what the 12:20 entry records.

- 2026-10-24 08:13 UTC - GitHub Copilot (model not verifiable from the session; the maintainer states Claude Sonnet 5.5) - Review round 7 of PR #2623 processed: one nit (F18, a reviewer finding ID that should read N/A in the F17 audit entry) fixed, replied and resolved; the audit row is recorded.
- 2026-10-24 08:34 UTC - GitHub Copilot (model not verifiable from the session; the maintainer states Claude Sonnet 5.5) - Review round 8 of PR #2623 processed: one finding (F19, the F18 verification matched its own heading) fixed, replied and resolved; the audit row is recorded.
- 2026-10-24 08:57 UTC - GitHub Copilot (model not verifiable from the session; the maintainer states Claude Sonnet 5.5) - Review round 9 of PR #2623 processed: two nits (F20, a review time that was 08:29 and not 08:30; F21, a count of edits of a reply) fixed by an appended correction in the audit log, replied and resolved; the audit rows are recorded.
- 2026-10-24 12:20 UTC - GitHub Copilot (model not verifiable from the session; the maintainer states Claude Sonnet 5.5) - PR #2623 was merged on 2026-10-24 at 12:19 UTC after nine review rounds, and issue #2416 is closed on GitHub. The maintainer chose to count his review and merge as the acceptance review, so AC1 to AC6, the `linter all` criterion and the last workflow checkpoint are ticked here at his instruction, and the evidence rows read ACCEPTED, as for #2414 and #2415. Qualifications that stand from the evidence: window (b) is proven by the controlled red and green tests (V1, V7), not by the real-binary race script (V5, a recheck), and the unstated limits are in the Implementation Completion Review. The spec is archived to `docs/issues/closed/`; the review audit and retrospective are in `docs/pr-reviews/pr-2623-review/`.

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F2] The #2414 and #2415 precedent differs from this entry

This entry says the evidence rows read ACCEPTED 'as for #2414 and #2415'. In those archived specs, the Acceptance Verification rows read DONE (some with a qualification). Their archive entries also say the maintainer approved the head of the PR with an ACK comment before counting the review and merge as the acceptance review. This entry names no such approval. ACCEPTED, like READY FOR REVIEW before it, is defined by no template or skill. Either DONE with the precedent's wording, or a sentence saying what the review here was, would make the comparison hold.

---
doc-type: manual-verification-evidence
issue-spec: docs/issues/open/2416-2410-si-22-4-stop-producers-before-listeners/ISSUE.md
issue-spec: docs/issues/closed/2416-2410-si-22-4-stop-producers-before-listeners/ISSUE.md

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

[Nit][F3] The evidence file changed, but its last-updated-utc did not

This commit changes issue-spec here and the harness command at line 231, but last-updated-utc (line 4) stays 2026-10-23 16:22. Step 4 of cleanup-completed-issues asks to set last-updated-utc to the current date when an affected document with that field is modified. ISSUE.md and the sub-EPIC got 12:20 and 12:21.

This branch was previously deployed

1 inactive deployment
coverage — f4ee048a Deployed Oct 24, 2026 by josecelano via Generate Coverage Report #2779
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants