Repository navigation
docs(issues): [#2482] add the sub-EPIC specification for #2482 - #2484
Conversation
There was a problem hiding this comment.
🟢 Approval recommended
The specification promotion, references, metadata, and corrected test command are consistent with the repository and issue requirements.
0 open findings
What changed in this PR
Promotes issue #2482’s reviewed draft into an open specification under EPIC #1669.
Changes:
- Finalizes issue metadata and workflow checkpoints.
- Corrects the root integration-test command.
- Updates EPIC and coupling-report references.
| File | Description |
|---|---|
docs/issues/open/2482-1669-decouple-test-helpers-from-unpublished-crates/ISSUE.md |
Promotes and finalizes the specification. |
docs/issues/open/1669-overhaul-packages/EPIC.md |
Links issue #2482 and its open specification. |
docs/issues/open/1669-overhaul-packages/workspace-coupling-report-2026-10-06.md |
Replaces the draft reference with issue #2482. |
🧠 Review effort: Balanced
Give feedback about Copilot approvals in this survey to enter a drawing for a $150 gift card.
046ecb5 to
0438fa8
Compare
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 0438fa81bb600919fe5e9bbf09cec39de4d92224 (round 1). Recomputed from the bytes at this head, against develop at 40dae98a7.
The PR promotes the reviewed finding-1 draft to docs/issues/open/ as #2482 (0418c510e, ff9782e70) and broadens it (0438fa81b). The folder is renamed to 2482-1669-reorganize-shared-test-support/. ISSUE.md becomes a decision-and-migration spec with options O1–O6. A new test-support-inventory.md records five patterns. The finding-2 draft is folded in as O1, and the EPIC and the coupling report point at #2482. Six paths, all under docs/.
Promotion and rename. The folder follows create-issue/SKILL.md:270-276. branch: equals the head ref (reported); SKILL.md:256-259 ties it to the branch in use and says a rename needs a new PR. status: planned, github-issue, epic and spec-path agree with EPIC.md:709. Field order matches the template and profile.rs:182-195. The H1 is the issue title minus its EPIC suffix (reported). Of the checkpoints, "Inventory (T1)" and "Broadened spec reviewed" are new. The narrow-scope approval is ticked and the broadened one is open, which is honest. The 08:42 entry explains the feature-gate reversal (the registry obstacle), and MV3 tests it. The 08:42 stamps match the log.
Inventory as a document. No profile governs research-report (profile.rs:108-113). Its frontmatter matches the one precedent (docs/issues/closed/1505-…/pre-implementation-analysis.md:1-18). All 10 related-artifacts exist. 31 members = 30 globbed + root. The Method is reported. No code changed between d1388579b and 40dae98a7.
Inventory facts. These hold:
- all line counts;
- the
testing/mod.rs:7-9quotes andEnvContainer×3; - every consumer cell;
- the nine forced edges (manifests parsed, source scanned outside test code);
- the
rest-api-corenote; - DEC-13's date and citation, and the reading that its premise fails (
test_helpers.rs:3-4was already#[cfg(test)] pub(crate)on 2026-06-11); - 3.0.0, five workspace dependencies, seven dev-dependents, and
http/udpused only viatests/common/mod.rs:30-36; - Patterns C–E;
src/console/ci/andtempfile.
These fail: F1, F3, F4 and F5.
Spec claims and structure. O1's caveat is the folded draft's note (base lines 38-40). O2 defers its claim to MV2 as a hypothesis. T1 DONE with AC1 open is consistent, because AC1 is reviewed after implementation. Line 240 requires the toolchain to be recorded. The ADR link resolves; see F2. All 81 relative links resolve.
Fold, EPIC and report. The finding-2 draft's goal, cargo metadata note and forced edges survive in O1, the Risks bullet (its AC8) and the inventory. Its tasks and ACs go to the T5 follow-ups. No file links either deleted folder; PR-REVIEW.md for #2462 keeps them as dated code spans. EPIC 669/709/752/992-997 and report 1192-1193/1207-1209 are consistent.
Hygiene. Three Conventional [#2482] subjects, and each body matches its diff. Author = committer, with ascending author times. No trailers, no banned token, git diff --check clean, docs only. "Related to" is correct for a spec-only PR.
Findings
- F1 [Minor] The inventory dates all five
test-helpersworkspace dependencies to 2026-07-29. - F2 [Minor] The spec says every workspace package will be published; nine members are
publish = false. - F3 [Nit] The
udprow liststorrust-info-hash, whichudp.rsdoes not import. - F4 [Nit]
peer_testsleaves no empty public module. - F5 [Nit] Only two environments define
Unstarted. - F6 [Suggestion]
axum-http-server→configurationis used outside test code only by an intra-doc link. - F7 [Suggestion] Name the open #1488 subissues that change these environments.
F1 and F2 leave the tree stating what the repository contradicts, so they block. F3–F7 do not block.
Checked, no finding
- Commit 3 (09:03:01Z) is later than the 08:42 stamps, which fits a last-edit stamp.
- The rewrite drops
ff9782e70's check, which suits a docs-only issue. - The PR title stays accurate.
- Pattern E omits the
benches/helpersmodules; AC1's review covers that.
Checks
On the loop's compute hub at this head, base develop 40dae98a7 (receipt server-gates-krkavec-175): pre-commit profile gate exit 0 (75 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop 40dae98a7 re-measured, so no new frontmatter finding. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 40dae98a7.
0438fa8 to
8f806be
Compare
Records da2ce7 review 5454599321 (F1-F7) with their fixes, verification, and reply URLs.
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at c43fc9013a0eece3c407e783c1f2752b504501e1 (round 2). Recomputed from the bytes at this head, against develop at 285938179.
The push keeps the thirteen earlier commits unchanged (range-diff =, ending at ed4948b74) and adds c43fc9013. That commit replaces ISSUE.md with a sub-EPIC EPIC.md (git records a delete plus an add) and re-points the inventory, #1669 and the coupling report at the new file. The inventory changes only at :8, the report at :1192-1193 and :1207-1209, and #1669 at its stamp, quick list, Details row, Specs Index and one log entry.
| Finding | Status | Proof at the head |
|---|---|---|
| F1, F3, F4, F5, F6 | FIXED, carried | The inventory is unchanged except :8, so :115-117, :113, :128-132, :52-55 and :87-91 still read as fixed. EPIC.md:48 keeps the nine edges, and row 5 names the doc-link-only edge |
| F2 | FIXED, carried | EPIC.md:66-71 ("and EPIC #1669 finish") and :109 |
| F7 | FIXED, carried | EPIC.md:204-207 (ordering rule), :325-327 and :342-345; rows 5–7 wait on #2471, #2449 and #2450 |
| F8 | Open, Nit | EPIC.md:270 and :274 are still 103 and 101 characters |
Conversion.
- The frontmatter matches the template and the schema's
Epicdefinition in fields and order:doc-type: epic,status: planned,epic: 1669,github-issue: 2482, its ownspec-path,epic-owner, a quoted stamp. Both skill links exist, and all sevenrelated-artifactsexist. - The template's sections appear in order. The Subissues table has the template's columns and its
Status valuesline, and the parent is named below the H1 (create-issue/SKILL.md:207-208). - The folder keeps the
{number}-{epic}-{desc}form (:273-276).create-issuenames no step for turning an issue into an EPIC. - All 14 relative links resolve. Only one path in the tree still names the deleted
ISSUE.md: see F9.
Content.
- Carried: Background (now "Why This Is Needed"), Criteria, Options, Out of Scope (minus "Moving code"), T1–T6 → D0–D5, MV1–MV3, the Risks (now pointing at subissue 8), References, Architectural Decisions (into References and In Scope), Implementation Completion Review (into the completion policy), and all seven earlier log entries.
- Moved to the subissues, as the 12:53 entry says: Bug-Fix Process, Regression Test Strategy, Commit Points, Verification Plan.
- Dropped and not listed: Design and Ownership Review (F12). Nothing that #1669, the inventory or the report relies on is lost.
- Rows 2–7 match the inventory's crates and patterns; row 8 is conditional on O1.
- AC1–AC8 cover the template's acceptance criteria in substance.
#1669 and the report. The row, quick list and note are true of EPIC.md, and the report links resolve. The time is wrong: see F11.
Hygiene. c43fc9013 has a [#2482] subject and a body that matches the diff. Author = committer (12:54:52Z), no trailers, no banned token, docs only, git diff --check clean.
Findings
- F9 [Major] The audit's
related-artifactsnames the deletedISSUE.md. - F10 [Minor] Two audit verifications cite
ISSUE.mdlines that no longer exist. - F8 [Nit] Two log lines overrun the 100-column wrap.
- F11 [Nit] #1669 records the conversion at 12:33;
EPIC.mdrecords it at 12:53. - F12 [Suggestion] The ownership rule from Design and Ownership Review was dropped.
F9 blocks. F10 does not block on its own, but it is part of the same audit edit.
Checked, no finding
- All seven threads are still resolved at the 13:01Z capture. The audit validator, run on that capture, reports 7 rows and 0 failures.
- Subissue 1's draft path is marked as to be created.
- The PR body still describes
ISSUE.mdand calls #2482 a subissue (reported, for the author). - The PR title is accurate enough; note only.
Checks
On the loop's compute hub at this head, base develop 285938179 (also the merge base; git merge-tree clean; receipt server-gates-krkavec-198): pre-commit profile gate exit 0 (75 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop re-measured, so no new frontmatter finding; validate-audit-record.py --pr-number 2484 --base 285938179 over the live review comments: 7 rows, 3 log entries, 0 failures. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 285938179.
c43fc90 to
aa63f4e
Compare
Records da2ce7 review 5454599321 (F1-F7) with their fixes, verification, and reply URLs.
…PIC.md The sub-EPIC conversion replaced ISSUE.md with EPIC.md: re-point the related artifact and the F2 and F7 current-tree verifications, keeping the earlier ISSUE.md citations as history.
…indings Record da2ce7 review 5457064358 (F8-F12), all fixed and replied.
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 542f1b29306c4e145acb4e441501636821fb4a16 (round 3). Recomputed from the bytes at this head, against develop at 23891ad8f, which is also the merge base.
The force-push rebases the fourteen round-2c commits onto 23891ad8f unchanged (range-diff =, with c43fc9013 now d15b25340); the 11 new develop commits touch none of this PR's files. It adds four fixes, and a second push adds the audit update. Against d15b25340 only three files change: the two EPICs and the audit.
| Finding | Status | Proof at the head |
|---|---|---|
| F8 | FIXED | EPIC.md:270-276 is rewrapped with the same 98 words. The 26 lines over 100 are 23 table rows and 3 link lines. The rewrap is logged at :283-284 |
| F9 | FIXED | PR-REVIEW.md:7 names EPIC.md, which exists. The only hit for the old path anywhere in the tree is :180, the verification quoting its own search |
| F10 | FIXED | :89 and :154 cite EPIC.md:66-71, :109, :204-207, :330-332 and :347-350, and each range holds the cited text. They sit five lines below my round-2 ranges because F8 and F12 added lines. The old citations are marked "before the sub-EPIC conversion" |
| F11 | FIXED | #1669 :9 and :998 read 12:53, matching EPIC.md:277 |
| F12 | FIXED | D2 (:168) carries the rule word for word as quoted in round 2; see F13 for the log wording |
Audit record.
- Rows F8–F12 follow F7 and match the review: Human; Nit, Major, Minor, Nit, Suggestion; ORIGINAL, FIXED, RESOLVED. All twelve threads are resolved at the capture.
- Categories are in the vocabulary. The IDs are kept as posted, with
Reviewer finding ID: N/A(process-pr-review/SKILL.md:218-219records the original ID only "when reassigned"). - The Source URLs are my five comments from review 5457064358 at
c43fc9013, and each reply answers its own thread. The resolution references are the four fix subjects; F9 and F10 share one. - Every current-tree verification holds. F12's "inspected" needs no line number, because the template asks for an inspection and its result.
- The 13:08 entry is true of the review. The 15:01 entry is also true: four commits,
develop11 commits ahead, replies at 15:00:54–15:01:02Z before the 15:04:28Z commit. The pre-push run is reported. - The log is chronological. Ownership, Status Values and Completion Rules are byte-identical to the template.
- The validator, run on the capture, reports 12 rows, 5 log entries and 0 failures.
aa63f4eecchanges exactly:7,:89and:154.
Carry-over and hygiene. F1–F7 still read as fixed in the same places: the inventory and coupling report are byte-identical to round 2c, and EPIC.md:66-71, :109, :204-207, :330-332, :347-350 and rows 5–7 are unchanged. The five new commits have [#2482] subjects and true bodies (two have none), author = committer, ascending author times, no trailers and no banned token. All 85 relative links resolve, and git diff --check is clean.
Findings
- F13 [Nit] The 14:48 entry says a subissue-1 spec that does not exist yet "carries" the section.
F8–F12 are fixed; F13 does not block.
Checked, no finding
EPIC.md:207,:287and:298start indented continuations with#<digits>. Docs Lint passed at this head (capture), as it does for 72 such lines indevelop'sdocs/, so MD018 (enabled by"default": true) does not fire on them. The F8 precaution was harmless.- The PR title (renamed at 13:01:54Z) and the body now describe the sub-EPIC.
- The 13:08 entry cites
c43fc9013as the review's commit, not as a fix.
Checks
On the loop's compute hub at this head, base develop 23891ad8f (also the merge base; git merge-tree clean; receipt server-gates-krkavec-201): pre-commit profile gate exit 0 (80 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop re-measured, so no new frontmatter finding; validate-audit-record.py --pr-number 2484 --base 23891ad8f over the live review comments: 12 rows, 5 log entries, 0 failures. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 23891ad8f.
|
ACK 542f1b2 — F8–F12 fixed at the bytes and the round-2 audit rows verified against review 5457064358, its replies, the captured threads and the template at this head |
…pproval and F13
|
ACK feb0d8f |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at feb0d8f243fc4e07722b28ad1fe9848a65e440d4 (round 4, delta over round 3). Recomputed from the bytes at this head, against develop at 23891ad8f, which is also the merge base.
Two linear pushes over 542f1b293 add 1868c8d44 (the F13 fix) and feb0d8f24 (the audit update); the nineteen round-3 commits are unchanged. Only EPIC.md (+4/−2) and the audit (+19/−0) change.
F13: FIXED.
EPIC.md:287now reads "Subissue 1's spec will carry the full Design and Ownership Review."- The 15:20 entry (
:288-289) names F13 and gives the reason ("since that spec does not exist yet"). - The stamp (
:9) is"2026-10-08 15:20", the newest entry, and the log is chronological. - The changed lines are 90–94 columns wide; no prose line exceeds 100.
Audit record.
- The F13 row (Human, Nit, documentation, ORIGINAL, FIXED, RESOLVED) and its detail block match the review: source review 5458896567 (posted as APPROVE at
542f1b293, dismissed by the push), comment 4220793533, and reply 4220965544 on that thread. The resolution reference is1868c8d44's subject. Reviewer finding ID: N/Ais correct, because nothing collided (process-pr-review/SKILL.md:218-219).- All thirteen threads are resolved.
- The 15:17 entry is true of the review. In the 15:32 entry, "replied before recording" holds (15:32:32Z, before 15:33:28Z). The request and the pre-push run are reported.
- The only change since
542f1b293is 19 added lines. The verbatim blocks match the template. - The validator, run locally, reports 13 rows and 0 failures. See F14.
Carry-over and hygiene. The range-diff shows nineteen =. F1–F12 are unaffected, because the only EPIC.md hunks are :9 and :287-289. Both commits have [#2482] subjects and no body; author = committer, times ascend, no trailers, no banned token, docs only.
Findings
- F14 [Minor] Two audit verifications cite
EPIC.mdranges that the 15:20 entry shifted by two lines. Non-blocking.
F13 is fixed; F14 does not block.
Checked, no finding
- The 15:20 stamp is earlier than the commit time (15:30:05Z), which a last-edit stamp allows.
EPIC.md:287still starts with an indented#2484; Docs Lint passed (capture), as measured in round 3.
Checks
On the loop's compute hub at this head, base develop 23891ad8f (also the merge base; git merge-tree clean; receipt server-gates-krkavec-203): pre-commit profile gate exit 0 (78 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop re-measured, so no new frontmatter finding; validate-audit-record.py --pr-number 2484 --base 23891ad8f over the live review comments: 13 rows, 7 log entries, 0 failures. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is 23891ad8f.
|
ACK feb0d8f — F13 fixed at the bytes and its audit row verified against review 5458896567, the reply, the captured threads and the template at this head |
feb0d8f to
8eec89a
Compare
Records da2ce7 review 5454599321 (F1-F7) with their fixes, verification, and reply URLs.
e8b6f06 to
2f22dc7
Compare
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 2f22dc7e3e8c4b4282ae7a313040995367990a36 (round 6). Recomputed from the bytes at this head, against develop at aa7f1ea95, which is also the merge base.
Since c02d0a36d there have been two pushes. The first added eight retrospective fixes (one per round-5 finding, a rewrap, and the scope and triage paragraphs). The second rebased onto aa7f1ea95, whose 11 commits touch none of this PR's files, and added 9bc4dc690 (the round-5 rows) and 2f22dc7e3 (a rewrap). The thirty-two earlier commits are unchanged (range-diff =).
| Finding | Status | Proof at the head |
|---|---|---|
| F15 | FIXED | Retro :51 and :69-71: four errors in the inventory and one in the spec's publishing plan (F2) |
| F16 | FIXED | :57-59: the fixes after rounds 3 and 4 cost reviews 5458896567 and 5459306372, both DISMISSED |
| F17 | FIXED | :52: F9–F12 come from the conversion. F8's 103-column line came from 1bd47216d and was carried by d7ee1882b |
| F18 | FIXED | :122-126 and :190-191 claim no existing rule. process-pr-review/SKILL.md:268 is the only stamp text, and #2320 item 10 (:481-482) holds. See F23 |
| F20 | FIXED | :75-77: "except F9 and F10"; no prose line exceeds 100 |
| F21 | FIXED | Audit :90 and :156 name ed4948b74 and 542f1b293, and each range holds at the head it names |
Audit rows.
- Rows F15–F18, F20 and F21 match review 5459990293 at
c02d0a36d: Human; Major, Major, Minor, Minor, Nit, Nit; ORIGINAL, FIXED, RESOLVED. F19 was never posted, so it has no row, and the 16:44 entry says it was cleared. - Each source URL is one of the six comments and each reply answers its own thread. The resolution references are the six fix subjects, and
Reviewer finding ID: N/Ais correct because nothing collided (process-pr-review/SKILL.md:218-219). - Every verification holds.
- The 16:44 and 17:45 entries are true. 17:45 is earlier than the 17:51:42Z commit, and the replies came at 17:45:45–55Z, before that commit.
- The 12:42 entry is rewrapped within 100 columns with its words unchanged.
- Rows F1–F14 and the verbatim blocks are unchanged.
- All 20 threads are resolved, and the local validator reports 20 rows and 0 failures. The completion rules are met.
New paragraphs. The scope note is now true (F22 cleared). The triage paragraph matches comment 6064986152. F23 still stands at :126.
Carry-over and hygiene. F1–F14 are unaffected. Both new commits have [#2482] subjects and true bodies where present, author = committer, no trailers and no banned token. Docs only.
Findings
- F23 [Nit] "It was not adopted" leaves out #2278 matrix row
:47, which is Adopt.
F15–F18, F20 and F21 are fixed, F22 is cleared, and F23 does not block.
Checked, no finding
- The retrospective is byte-identical to the round-6 head.
- The proposals and the triage are reported; the loop takes no position on them.
Checks
On the loop's compute hub at this head, base develop aa7f1ea95 (also the merge base; git merge-tree clean; receipt server-gates-krkavec-216): pre-commit profile gate exit 0 (76 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop re-measured, so no new frontmatter finding; validate-audit-record.py --pr-number 2484 --base aa7f1ea95 over the live review comments: 20 rows, 11 log entries, 0 failures. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is aa7f1ea95.
|
ACK 2f22dc7 — F15–F18, F20 and F21 fixed at the bytes and their audit rows verified against review 5459990293, its six replies, the captured threads and the template at this head |
…ent-derived log stamps The torrust#2320 proposal was adopted in torrust#2278's improvement matrix (the PR torrust#2271 row), though no skill or template states it yet.
…pproval and F23
|
ACK 2b8f981 |
da2ce7
left a comment
There was a problem hiding this comment.
Reviewed at 2b8f9817961ff6549815b6ab546090e49be0a9e7 (round 7). Recomputed from the bytes at this head, against develop at aa7f1ea95, which is also the merge base.
Three linear commits sit on 2f22dc7e3, with the thirty-four earlier ones =. 531758230 fixes the retrospective sentence F23 named, 43cd0f4f3 corrects the audit's F18 Solution, and 2b8f98179 records round 6. Only the retrospective (+3/−1) and the audit (+21/−1) change.
F23: FIXED. Retro :126-128 now says #2278's retrospective-improvement-matrix.md "adopts the same idea (the PR #2271 row "Derive log events from Git and GitHub timestamps, not recollection.", Adopt), but no skill or template states it yet". Both halves are true: the matrix row at :47 reads exactly that, with Adopt (checked at aa7f1ea95), and no skill or template at this head states a stamp-derivation rule. All lines are within 100 columns.
Audit rows.
- F23 row (
:73): Human, Nit, correctness, ORIGINAL, FIXED, RESOLVED. Its block names review 5460915644 at2f22dc7e3, comment 4222491549 and reply 4222555652 on that thread. The resolution reference is531758230's subject, the Solution names the second commit, and the verification holds. - F22 was cleared and never posted, so it has no row; the 18:05 entry records the clearing.
- The F18 Solution (
:305) no longer says "which was not adopted". It now names the matrix row withAdoptand says no skill or template states it yet, which is true. - The 18:05 entry is true of the review. The 18:12 entry is not later than its commit (18:13:41Z), and the reply (18:12:40Z) came before the recording.
- The log is chronological. Rows F1–F22 are otherwise unchanged and the verbatim blocks match the template.
- All 21 threads are resolved, so completion is met. The local validator reports 21 rows and 0 failures.
Carry-over and hygiene. The round-6 rulings stand: F15–F18, F20 and F21 FIXED, F22 cleared, the triage paragraph true, and F1–F14 unaffected. The three new commits have [#2482] subjects and true bodies where present, author = committer, ascending times, no trailers and no banned token. git diff --check is clean and the change is docs only.
Findings
None. F23 is fixed.
Checked, no finding
- The reply's own review records the PR head as
2f22dc7e3, and the dismissal came one second later (18:12:41Z). The fix commits therefore reached GitHub just after the reply, and both happened before the recording commit. - The proposals and the triage are reported; the loop takes no position on them.
Checks
On the loop's compute hub at this head, base develop aa7f1ea95 (also the merge base; git merge-tree clean; receipt server-gates-krkavec-218): pre-commit profile gate exit 0 (90 s); linter markdown, linter cspell, linter lychee exit 0; frontmatter-validator --all: 19 errors / 4 warnings at this head and 19 / 4 at develop re-measured, so no new frontmatter finding; validate-audit-record.py --pr-number 2484 --base aa7f1ea95 over the live review comments: 21 rows, 13 log entries, 0 failures. GitHub checks at this head at posting time: "Docs Lint: completed/success". At posting, develop is aa7f1ea95.
… dispositions in the matrix The PR torrust#2484 review retrospective proposes six improvements and asks the owner of EPIC torrust#2003 to decide which enter it or this child EPIC. The matrix is this EPIC's decision input, so each proposal gets a row in its form: the manual pre-push sweep and anchoring verifications to headings or quoted phrases are adopted for order 5, the sweep's tool is deferred to order 8 for its audit-body part, deferring non-blocking findings after an approval is deferred to order 10, and the spec-template, create-issue and session items are left to EPIC torrust#2003's register. Orders 5, 8 and 10 name what they gained, and the progress log records the decision. No fixed decision of the Decision Record changes.
…in the EPIC's scope and qualify the path sweep The PR torrust#2484 rows made the retrospective a decision source, but the Decision Record still said the matrix maps "the three retrospectives", AC1 required only PRs torrust#2270 to torrust#2272, and References listed those three. The Decision Record now names the retrospectives the matrix lists, so it stays true when another arrives; AC1, its verification and References cover PR torrust#2484, whose retrospective reaches develop when that PR merges. The sweep's path check failed any tracked file naming a deleted or renamed path, including references that record history on purpose. It now fails only on a current reference (a live link, a related-artifacts entry, a verification claim about the current tree) and allows references marked historical, keeping EPIC torrust#2264's distinction between current and historical paths.
Review 5460432014 raised two Minor findings on this pull request: the EPIC's scope text omitted the PR torrust#2484 retrospective (F1), and the pre-push sweep's path rule also rejected references kept as history (F2). The record carries both rows with their sources, the fix that answers them and verifications anchored to headings and quoted phrases, so they hold when the files move again. The reply URLs are filled in once the replies are posted after the push.
…dispositions in the matrix 99ae7d4 docs(pr-reviews): [#2278] record the PR #2494 reply URLs (Cameron Garnham) 3ab7f90 docs(pr-reviews): [#2278] add the PR #2494 review audit (Cameron Garnham) 17a83b7 docs(issues): [#2278] cover the PR #2484 retrospective in the EPIC's scope and qualify the path sweep (Cameron Garnham) 27ead58 docs(issues): [#2278] record the PR #2484 retrospective dispositions in the matrix (Cameron Garnham) Pull request description: ## Summary EPIC #2278's improvement matrix is the approved decision input for its subissues. The PR #2484 review retrospective proposes six improvements and asks the owner of EPIC #2003 to decide which enter that EPIC or this child EPIC; this change records those decisions, in the matrix's own vocabulary and within the fixed decisions of the Decision Record, which do not change. Related to #2278 ## Changes Four commits and three files: `EPIC.md` and `retrospective-improvement-matrix.md` under `docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/`, and the audit record `docs/pr-reviews/pr-2494-review/PR-REVIEW.md`. ### `caa7818f7` docs(issues): [#2278] record the PR #2484 retrospective dispositions in the matrix `retrospective-improvement-matrix.md`: - Six rows with source `PR #2484`, one per proposal, in the matching sections: the manual pre-push sweep (Adopt, order 5; its tool deferred to order 8 for the audit-body part) and anchoring each `Current-tree verification` to a heading or quoted phrase (Adopt, order 5) under Author Verification and Convergence; deferring non-blocking findings after an approval (Defer, order 10) under the proportionate-evidence section; and a new section, PR #2484 Items Left to Other Owners, for the spec-log stamp rule, the restructuring step for `create-issue`, and one session per pull-request branch (Out of scope, EPIC #2003 and `docs/agents/orchestration.md`). - The introduction names the fourth source retrospective, and the note on the `Owner task` columns says the new rows name the subissue order directly. - `related-artifacts` gains `docs/pr-reviews/pr-2484-review/review-retrospective.md`, and `last-updated-utc` is the time of the decision. `EPIC.md`: - Rows 5, 8 and 10 of the Subissues table name what they gained from the retrospective. - A Progress Log entry records the triage; `last-updated-utc` matches it. ### `05660e36a` docs(issues): [#2278] cover the PR #2484 retrospective in the EPIC's scope and qualify the path sweep Answers review 5460432014 (F1 and F2): - `EPIC.md`: the Decision Record maps the proposals of "the PR review retrospectives its introduction lists", so it stays true when another arrives; AC1, its Acceptance Verification row and the References entry "Source retrospectives" cover PR #2484; a Progress Log entry records the change. - `retrospective-improvement-matrix.md`: the PR #2484 sweep row fails only when a tracked file still names a deleted or renamed path as a current reference, keeps references marked historical, and its rationale cites EPIC #2264's distinction between current and historical paths. ### `cf2c60ce3` docs(pr-reviews): [#2278] add the PR #2494 review audit `docs/pr-reviews/pr-2494-review/PR-REVIEW.md` records F1 and F2 of review 5460432014 (both Minor, `FIXED`/`RESOLVED`), each with its source thread, concern, solution, current-tree verification and resolution reference, and a Processing Log. ### `53a49579c` docs(pr-reviews): [#2278] record the PR #2494 reply URLs The audit record's two Reply URL fields name the posted replies on the F1 and F2 threads. The #2003 side of the same decisions (the register notes and the new label) travels with PR #2366, the open overhaul of that EPIC's specification. ## Merge order The matrix's new `related-artifacts` entry names the PR #2484 retrospective. PR #2484 merged on 2026-10-08 and the retrospective is on `develop`, so the condition is met and this pull request can merge. PR #2366 merges after this one, because its EPIC text cites these matrix rows. ## Validation On 2026-10-09 the branch was rebased onto `develop` `41add51ab` at the maintainer's request, with no content change: `git range-diff` shows the four commits as equal, and the head is `99ae7d401`. At that head, in a Linux container with the workspace nightly toolchain: pre-commit profile gate exit 0 (75 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and at `develop`; `validate-audit-record.py --pr-number 2494` 0 failures. In a Linux container with the workspace nightly toolchain at `53a49579c`, base `develop` `554c47f67`: pre-commit profile gate exit 0 (74 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all`: 19 errors / 4 warnings at this head and 19 / 4 at `develop` re-measured; `validate-audit-record.py --pr-number 2494` exit 0; `git diff --check` clean. ACKs for top commit: josecelano: ACK 99ae7d4 Tree-SHA512: d17f6b9f734071cfd09ea8279a16d61d4177898b72d262ac887a479f9556399a7238170c9dec65326f181c3dfd2e0017405d70e5495803048036ca6260dd72e9
…red R2 and R4 into the order-5 change Review 5467975631 approved PR torrust#2494 and deferred two non-blocking findings to the next torrust#2278 change touching these files, because a push would have dismissed the approval. R2: the References line still said the PR torrust#2484 retrospective reaches develop when PR torrust#2484 merges, which has happened, so the clause goes. R4: the PR torrust#2484 sweep row's Disposition read "Defer (tool)", while its rationale defers only the audit-body check and assigns the tree-wide checks to other owners; in the matrix's vocabulary those are Out of scope, so the cell now says so. A Progress Log entry records the carry.
…ix assigns to order 5 PR torrust#2494 added the PR torrust#2484 retrospective's rows to the torrust#2278 matrix and assigned two of them to order 5: a manual sweep before each push to a reviewed branch, and anchoring each Current-tree verification to a heading or quoted phrase. The order-5 draft predates them and named neither, so the order would have closed without delivering two adopted items. The draft now carries both in its Background, Scope table, tasks and acceptance criteria, citing the matrix rows by source PR and quote, and its Progress Log records that they entered with this round.
…red R2 and R4 into the order-5 change Review 5467975631 approved PR torrust#2494 and deferred two non-blocking findings to the next torrust#2278 change touching these files, because a push would have dismissed the approval. R2: the References line still said the PR torrust#2484 retrospective reaches develop when PR torrust#2484 merges, which has happened, so the clause goes. R4: the PR torrust#2484 sweep row's Disposition read "Defer (tool)", while its rationale defers only the audit-body check and assigns the tree-wide checks to other owners; in the matrix's vocabulary those are Out of scope, so the cell now says so. A Progress Log entry records the carry.
…ix assigns to order 5 PR torrust#2494 added the PR torrust#2484 retrospective's rows to the torrust#2278 matrix and assigned two of them to order 5: a manual sweep before each push to a reviewed branch, and anchoring each Current-tree verification to a heading or quoted phrase. The order-5 draft predates them and named neither, so the order would have closed without delivering two adopted items. The draft now carries both in its Background, Scope table, tasks and acceptance criteria, citing the matrix rows by source PR and quote, and its Progress Log records that they entered with this round.
…red R2 and R4 into the order-5 change Review 5467975631 approved PR torrust#2494 and deferred two non-blocking findings to the next torrust#2278 change touching these files, because a push would have dismissed the approval. R2: the References line still said the PR torrust#2484 retrospective reaches develop when PR torrust#2484 merges, which has happened, so the clause goes. R4: the PR torrust#2484 sweep row's Disposition read "Defer (tool)", while its rationale defers only the audit-body check and assigns the tree-wide checks to other owners; in the matrix's vocabulary those are Out of scope, so the cell now says so. A Progress Log entry records the carry.
…ix assigns to order 5 PR torrust#2494 added the PR torrust#2484 retrospective's rows to the torrust#2278 matrix and assigned two of them to order 5: a manual sweep before each push to a reviewed branch, and anchoring each Current-tree verification to a heading or quoted phrase. The order-5 draft predates them and named neither, so the order would have closed without delivering two adopted items. The draft now carries both in its Background, Scope table, tasks and acceptance criteria, citing the matrix rows by source PR and quote, and its Progress Log records that they entered with this round.
…specification 29b87d8 docs(pr-reviews): [#2278] record the PR #2431 round 2 reply URLs (Cameron Garnham) cf4b1b3 docs(pr-reviews): [#2278] record the maintainer's round 2 on PR #2431 (Cameron Garnham) 452a5ca docs(issues): [#2278] restate the #2362 overlap on current develop (Cameron Garnham) 0242f53 docs(issues): [#2278] cover the PR #2484 items the matrix assigns to order 5 (Cameron Garnham) 066dd18 docs(issues): [#2278] cite the skill, template, matrix and EPIC by stable references (Cameron Garnham) 79613e7 docs(issues): [#2278] carry the PR #2494 review's deferred R2 and R4 into the order-5 change (Cameron Garnham) a5130aa docs(pr-reviews): [#2278] add the PR #2431 review audit record (Cameron Garnham) bed38f9 docs(issues): [#2278] record a comparison base per historical audit (Cameron Garnham) 355e9c4 docs(issues): [#2278] specify the pre-posting pass of the self-audit gate (Cameron Garnham) b8d4397 docs(issues): [#2278] draft the order 5 self-audit gate specification (Cameron Garnham) Pull request description: Related to #2278 ## Summary This spec-only PR drafts EPIC #2278 order 5, "Add the author self-audit gate to `process-pr-review`". It contains planning documentation only: no skill, template, validator or workflow change. - **Draft specification for order 5.** New folder-style draft at `docs/issues/drafts/2278-author-self-audit-gate/ISSUE.md`. The order is docs only. It takes its content from the EPIC's retrospective-improvement matrix: the rows routed to the self-audit gate (run the validator when it can run and do its checks by hand otherwise, re-derive everything after a second re-raise and after context compaction, corrections re-derived from named Git or GitHub commands, command and result before narrative, no self-referential counts, one fix per commit, `git show --stat` on cited commits, log stamps from Git and GitHub timestamps), the F65 counterpart to "update progressively", the manual part of F55, and the two PR #2484 items the matrix assigns to order 5 (a manual sweep before each push to a reviewed branch, and anchoring each `Current-tree verification` to a heading or quoted phrase). Each gate pass is recorded as one append-only Processing Log entry naming the gated event and the commands run; no helper is a prerequisite and no per-finding field is added. Four commit points: the skill's gate section, template guidance, two checklist items, and the evidence with the EPIC row. - **Stable references.** The draft names matrix rows by F-ID or by source PR and a short quote, and cites the skill, the template, the validator and the EPIC by section heading or quote, so later merges into those files do not move its citations. The skill is at version 1.5 on `develop` `686a42f45`; order 5 bumps it from there, or from the version #2362 leaves. - **EPIC bookkeeping.** Progress Log lines record the draft and the carried review items; row 5 keeps its `TODO` status and placeholder path until the issue exists. ## Requested Maintainer Decisions The maintainer agreed with the draft's proposed answers to questions 2 to 5 in review 5469277375; question 1 waits on the restated #2362 overlap below. 1. Sequencing with #2362 (pending confirmation). Re-derived by quote on `develop` `686a42f45`, #2362 rewrites, in the skill, Workflow step 7's superseded-thread sentence, step 8 ("Consolidate review bodies"), the Detail-Entry Fields sentence on `FIXED` resolution references, and the Completion Checklist item on consolidated responses; in the template, the Status Values bullet on outdated threads, the `Resolution reference` placeholder and the guidance paragraph after it, and the Completion Rules bullets on outdated threads, consolidated responses and citing a fix. This order rewrites none of those passages, so no sentence is changed by both. Both edit three of the same sections (Workflow step 7, the Completion Checklist, and the template guidance beside Finding Details), where this order inserts next to #2362's passages, and both bump the skill version. The rule for a fix outside the tree, already on `develop`, is the text #2362's F5 and F6 wording starts from. Which lands first? The second rebases over the first's text in those three sections and takes the next skill version. 2. The copied `## Completion Rules` section carries no gate bullet, because every new record would copy it and order 8 would byte-diff it. Agreed as proposed. 3. One gate pass may precede several replies posted together when it covers every replied row. Agreed as proposed. 4. F75 (`RE_RAISE_OF` does not say whose finding ID it takes) keeps its wording with order 8, where the register places it. Agreed as proposed. 5. The EPIC's order-10 row lists "F55 as a self-audit step" while the matrix's F55 row places the manual step in T2; the draft keeps it here in its own commit so it can move unchanged. Agreed as proposed. 6. On approval, the GitHub issue is created, the draft moves to `docs/issues/open/` with its number, and row 5 links to it. ## Files Touched - `docs/issues/drafts/2278-author-self-audit-gate/ISSUE.md` (new) - `docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/EPIC.md` (one Progress Log line for the draft; with the carry commit, the References line, a second Progress Log line and the frontmatter stamp) - `docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/retrospective-improvement-matrix.md` (the carry commit: one Disposition cell and the frontmatter stamp) - `docs/pr-reviews/pr-2431-review/PR-REVIEW.md` (new: the review audit record, rounds 1 and 2) ## Rebase, carried items and round 2 PR #2494 merged into `develop` at `686a42f45` and also changed the #2278 EPIC, so this branch was rebased onto it; every other file merged cleanly. The EPIC conflict is resolved by keeping both sides: PR #2494's changes, including its two 2026-10-08 Progress Log entries, and this branch's 2026-10-03 entry for the draft, placed before them so the log stays chronological. `docs(issues): [#2278] carry the PR #2494 review's deferred R2 and R4 into the order-5 change` applies the two non-blocking findings that review 5467975631 deferred to this change: the References line drops the clause on when the PR #2484 retrospective reaches `develop`, and the PR #2484 sweep row's Disposition reads "Adopt (manual sweep); Defer (audit-body tool check); Out of scope (tree-wide tool checks)". Review 5469277375 is answered by `docs(issues): [#2278] cite the skill, template, matrix and EPIC by stable references` (F3, F4), `docs(issues): [#2278] restate the #2362 overlap on current develop` (F5) and this description (F6). `docs(issues): [#2278] cover the PR #2484 items the matrix assigns to order 5` adds the two items the matrix has assigned to this order since PR #2494, and `docs(pr-reviews): [#2278] record the maintainer's round 2 on PR #2431` records the round. After PR #2434 merged, the branch was rebased again, onto `develop` `f960c78d7`; its ten commits keep their content, and the #2278 EPIC conflict is resolved as the maintainer asked. ## Merge order PR #2434 merged into `develop` at `f960c78d7`, and this branch is rebased onto it. The rebase touched only the #2278 EPIC's frontmatter stamp and the position of one Progress Log entry, resolved as the maintainer asked: both sides' entries are kept, this branch's 2026-10-03 17:09 entry sits before `develop`'s 2026-10-04 19:18 entry, and `last-updated-utc` stays "2026-10-09 11:16", the stamp of the merged log's latest entry. PR #2486 then merged into `develop` at `7711ade56`, and this branch is rebased onto it at the maintainer's request; no file conflicted, so every commit is unchanged in content (`git range-diff` against `284095128`: 10 commits equal). ## Validation At this head: In a Linux container with the workspace nightly toolchain, at the rebased head `29b87d8ef`, base `develop` `7711ade56` (the merge base): pre-commit profile gate exit 0 (79 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and 19 / 4 at `develop` re-measured; `validate-audit-record.py --pr-number 2431` against the review comments captured after the round-2 replies were posted: 6 rows, 12 log entries, 0 failures; `git range-diff` against `284095128` shows all 10 commits equal (the previous rebase's range-diff against `7b7348dbf`: 8 equal, 2 differing only in the resolved EPIC hunks). ACKs for top commit: josecelano: ACK 29b87d8 Tree-SHA512: fe6f791a4761f4b835d1c8c44df3e605182301606c9e6226b3f31b65f60eaa614ad210f881193d50f895420d6f7305a1df27092a3932661dbb7a59850756dd20
… dispositions The PR torrust#2484 review retrospective asks the owner of this EPIC to decide which of its six proposals enter this EPIC or torrust#2278. The author-side items go to torrust#2278's improvement matrix; the friction register records where the rest land: the stamp rule for spec progress logs and the restructuring step for create-issue as notes on their existing labels, one session per pull-request branch as a new label against the orchestration guide, and the sweep's tree-wide path and line-width checks on the citation and wrapping labels. The progress log records the triage.
…ter the hand-off 27ddb0a docs(issues): [#2003] describe the register's index as five comments at its 2026-10-11 revision (Cameron Garnham) 48a5d0e docs(issues): [#2003] record the provenance rounds and the rebase, and drop the index version (Cameron Garnham) 3ffa0f5 docs(pr-reviews): [#2003] record the PR #2366 reply URLs (Cameron Garnham) 2e27966 docs(pr-reviews): [#2003] add the PR #2366 review audit (Cameron Garnham) 5ae74fb docs(issues): [#2003] refresh the friction register section and the checkpoint range (Cameron Garnham) 7356602 docs(issues): [#2003] record the PR #2484 retrospective dispositions (Cameron Garnham) 914f8ae docs(issues): [#2003] follow the prose-tests draft's placement under the EPIC (Cameron Garnham) 3fa09ac docs(issues): [#2003] record the discussion outcomes on the EPIC (Cameron Garnham) 20c2d33 docs(issues): [#2003] place the two draft specifications and record the #2375 scheduling (Cameron Garnham) f95f26d docs(issues): [#2003] overhaul the EPIC specification after the hand-off (Cameron Garnham) Pull request description: ## Summary Overhauls the EPIC #2003 specification so the file carries what the issue's comment thread established since July, and hands the EPIC to its new owner. Ten commits: six change the EPIC, the seventh adds this pull request's review audit record, the eighth records the reply URLs in it, the ninth records what the rebase onto current `develop` brought, and the tenth describes the register's index as the five comments it now spans. The GitHub issue body mirrors the EPIC under the Issue Body Mirror rule in its Verification Plan and is re-derived from this head (see Validation). Related to #2003 ## Files touched - `docs/issues/open/2003-overhaul-guardrails-and-automation/EPIC.md` (commits 1 to 6, 9 and 10) - `docs/pr-reviews/pr-2366-review/PR-REVIEW.md` (commit 7, new) ## First commit: the overhaul after the hand-off `docs(issues): [#2003] overhaul the EPIC specification after the hand-off` The GitHub issue body was updated first (2026-09-28 16:39 UTC) and mirrored this file exactly; 42 of the issue's 46 comments were then minimized because the text carries them, and only the friction register index (two comments at the time) and the ownership record stayed visible. What the revision adds: an owner line; the Subissues table through order 13 in the template's columns (statuses, notes, the two child EPICs, #2347 and #2360); the order-12 close-out list; the follow-up owners created by #2347; the five undecided improvement candidates from the #2347 retrospective; a "Decisions Recorded on This EPIC" section (interim formatter, author-side register items to #2278, semantic labels, ownership); a "Friction Register" section with the labelling rule, the closed F series, the disposition precedence, the in-place filing rule and the per-group counts of 2026-09-28; the findings without an owning subissue; dated progress-log entries; an "Issue Body Mirror" rule under Verification Plan; four new risks; and reference lines for the index, the ownership record and the inventory measurements. Sections that were already current are unchanged apart from reflowing each paragraph, list item and table row onto one line. Frontmatter: `epic-owner` is `da2ce7`; `status` stays `planned`; `last-updated-utc` is the quoted UTC minute of the last edit and equals the last progress-log entry; the semantic links gain `process-pr-review` and the child-EPIC, #2347 and schema artifacts. ## Second commit: the draft specifications and the #2375 scheduling `docs(issues): [#2003] place the two draft specifications and record the #2375 scheduling` Places the two draft specifications that landed on `develop` (the AI-agent memories draft and the AI-harness workspace draft) under a new "Drafts Awaiting Issues" subsection, records the #2375 scheduling position in its row, and adds the placement decision and a progress-log line. ## Third commit: the discussion outcomes `docs(issues): [#2003] record the discussion outcomes on the EPIC` After PR #2428 merged the three design discussions, records under `Decisions Recorded on This EPIC` the goals-and-boundaries decisions (the four-aspect frame, the gates, contract versus technique, coordination claims, copies of GitHub state, the discussions convention) and the four specifications-and-rationale answers as revised in review round 4, each linking its Outcome section by path and naming the review that holds it, with a Progress Log entry and the update stamp. The parts that belong to #2264 and #2278 are recorded in PR #2434. ## Fourth commit: the prose-tests draft's placement `docs(issues): [#2003] follow the prose-tests draft's placement under the EPIC` Follows the prose-tests ADR draft's placement under this EPIC, merged by PR #2437. The specifications-and-rationale decision links the draft at `docs/issues/drafts/2003-adopt-prose-tests-as-executable-specification/ISSUE.md`, and Drafts Awaiting Issues lists it beside the memories and harness-workspace drafts, under the Scope exception until its issue is created. ## Fifth commit: the PR #2484 retrospective dispositions `docs(issues): [#2003] record the PR #2484 retrospective dispositions` The PR #2484 review retrospective asks this EPIC's owner to decide which of its six proposals enter this EPIC or #2278. A Friction Register paragraph records where each lands: items 1 to 3 in #2278's improvement matrix (orders 5, 8 and 10, added by PR #2494); item 4 (one stamp per event in spec progress logs) on `issue-template-log-correction-rule-unstated`; item 5 (a step for restructuring a spec under review) on `create-issue-issue-to-epic-conversion-unstated`; item 6 (one session per pull-request branch) as a new label against `docs/agents/orchestration.md`; and item 1's tree-wide path sweep and line-width check on `linter-path-citations-unchecked` and `write-markdown-docs-line-wrap-rule-unstated`. A Progress Log entry stamped 2026-10-08 16:50 UTC records the triage, and `last-updated-utc` matches it. ## Sixth commit: the friction register section and the checkpoint range `docs(issues): [#2003] refresh the friction register section and the checkpoint range` Answers R1 and R2 of review 5468071770: - The Friction Register describes the register's index as the four comments it now spans: at index v31 (2026-10-08 13:31 UTC) they hold 12 artifact groups and 238 labels, 236 frictions and two CI findings, with a bullet per part naming its groups, and part 3 carries the live counts. The bullet on the closed F series points to the former-number map in part 3. - The counts table of 2026-09-28 is kept as a dated snapshot rather than refreshed, because a stamped copy of GitHub state stays true as later batches change the counts; its caption says so and points to part 3, and the clusters sentence speaks of that revision. - The introduction no longer carries a friction count, for the same reason. - The Delivery Strategy and the Workflow Checkpoints drop the "orders 1–14" range, so neither goes stale with the next Subissues row. - A Progress Log entry records the round, and `last-updated-utc` matches it. ## Seventh commit: the review audit `docs(pr-reviews): [#2003] add the PR #2366 review audit` Adds `docs/pr-reviews/pr-2366-review/PR-REVIEW.md` from the repository's audit template: R1 (Major), R2 (Minor), R3 (Minor) and R4 (Nit) of review 5468071770, each with its source thread, concern, solution, current-tree verification and resolution reference, and a Processing Log. R1 and R2 are fixed by the sixth commit; R3 needs no change, as the Merge order below explains; R4 is answered by this description. ## Eighth commit: the reply URLs `docs(pr-reviews): [#2003] record the PR #2366 reply URLs`: the audit record's four Reply URL fields, and the Resolution reference of R3 and R4, name the posted replies on the four threads, which are resolved. ## Ninth commit: the provenance rounds, the rebase and the index revision `docs(issues): [#2003] record the provenance rounds and the rebase, and drop the index version` After the rebase onto `develop` `5d05fefdd`, the 185 commits that arrived were checked against every section of the EPIC. Two of the merged pull requests are rounds of the AI-model-provenance discussion under this EPIC: PR #2486 (the decision owner's round on Q1 to Q11) and PR #2502 (the opening author's reply on Q1 and Q11 with a new Q12). Its Outcome is pending, so nothing enters Decisions Recorded on This EPIC, and the EPIC lists discussions only through their recorded Outcomes. The other merged work changes no fact the EPIC states: every path it names still resolves, and the subissue rows, drafts, follow-up owners and open findings hold as written. A Progress Log entry records the rebase and the two rounds, and `last-updated-utc` matches it. The Friction Register names the index revision by its timestamp alone, as review 5505015377 suggests, because no index comment carries a version number; the 2026-10-09 log entry that mentions the version stays as written. ## Tenth commit: the register's index as five comments `docs(issues): [#2003] describe the register's index as five comments at its 2026-10-11 revision` Batch 32 laid the register's index out in five comments on 2026-10-11 at 09:08 UTC ([comment 6107435063](#2003 (comment))). The Friction Register's stamped state line now describes that revision: five comments holding 13 artifact groups and 255 labels, 253 frictions and two CI findings, counted from the five comments' bodies. Each part's bullet names the groups it holds now, with a new bullet for part 5 (the hooks, linters and maintenance skills, and the archiving skill `cleanup-completed-issues`). References links all five parts, and a Progress Log entry records the change with `last-updated-utc` matching it. ## Merge order PR #2494 merged on 2026-10-09 at 11:09 UTC as `686a42f45`, so the Friction Register paragraph saying the PR #2484 retrospective's six proposals are dispositioned in #2278's improvement matrix is true on `develop`. **Rebase.** After review 5505015377 approved this pull request at `5dd98ecd0`, the branch was 185 commits behind `develop`; at the reviewer's request it was rebased onto `develop` `5d05fefdd` with no conflict, and `git range-diff` shows all eight commits equal. The ninth commit records what the rebase brought. ## Validation In a Linux container with the workspace nightly toolchain, at the fixes head `cc6dee1e3` and again at the reply-URL head `5dd98ecd0`, base `1d116fbfa` (this branch's merge base with `develop`): pre-commit profile gate exit 0 (76 s and 130 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at each head and 19 / 4 at the base re-measured; `validate-audit-record.py --pr-number 2366` at `5dd98ecd0`, against the review comments captured after the replies were posted: 4 rows, 3 log entries, 0 failures (at `cc6dee1e3` the only failures were the placeholder Reply URL and Resolution reference fields then pending). The issue body was re-derived from this head by the Issue Body Mirror rule (drop the frontmatter, the skill-link marker and the title line, keep the rest byte for byte) and compared with the live body: the only differences are the sixth commit's changes below the frontmatter, nine lines changed and three added (the introduction, the Friction Register paragraph and its four index bullets, two of them new, the F-series bullet, the counts caption, the clusters sentence, the Delivery Strategy sentence, the checkpoint line and the new Progress Log entry). The live body was replaced by the derived text on 2026-10-09 10:43 UTC. At the new head, base `develop` `5d05fefdd`: In a Linux container with the workspace nightly toolchain, at the rebased head `27ddb0ab6`, base `develop` `5d05fefdd` (the merge base): pre-commit profile gate exit 0 (76 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and the same at `develop` re-measured; `validate-audit-record.py --pr-number 2366` against the review comments captured on 2026-10-13: 4 rows, 3 log entries, 0 failures; `git merge-tree` against `develop` clean; `git range-diff` against `5dd98ecd0` shows the eight earlier commits equal. The issue body was re-derived from the new head by the Issue Body Mirror rule and compared with the live body, last edited on 2026-10-11. The only differences are the ninth and tenth commits' changes below the frontmatter (the Friction Register sentence and its part bullets, the References line, and the two new Progress Log entries) and one trailing blank line that the live body carries and the rule does not produce. ACKs for top commit: josecelano: ACK 27ddb0a Tree-SHA512: a7b1c468c7e89794c638ef235dd44c28e6c96b5fe0dc5cfd48c144c0423c04072b466f9f0f27a40fe6dfa065ab0ae315e7004c7879ae73c92b2cc0fe54b96eb0
Summary
Spec-only PR for #2482, now a sub-EPIC of EPIC #1669. No code changes.
At the maintainer's request, #2482 was first broadened from "move the
http/udphelpers out oftest-helpers" to deciding how workspace packages share test support code, and then converted from a task into a sub-EPIC: it decides the rules (one ADR) in its first subissue and then applies them package by package in later subissues. The goal is that no shared crate becomes a coupling hub and test-only code and dependencies stay out of production builds unless a consumer opts in.Related to #2482
Related to #1669
Changes
docs/issues/open/2482-1669-reorganize-shared-test-support/(moved fromdocs/issues/drafts/1669-decouple-test-helpers-from-unpublished-crates/, then renamed from2482-1669-decouple-test-helpers-from-unpublished-crates):EPIC.md(wasISSUE.md): goal, why, why a sub-EPIC, criteria, options (O1testingfeature, O2 separate support crate, O3tests/common/, O4 leaftest-helpers, O5#[cfg(test)], O6 keep DEC-13), and:{issue}-2482-{slug},epic: 2482); behaviour unchanged by moves; environment moves after the EPIC Overhaul: Tracker Shutdown #1488 subissues that change the same environments (Migrate the REST API test environment to the token lifecycle #2449, Migrate the health-check API test environment to the token lifecycle #2450, Stop the HTTP test environment's tasks when it is dropped without stop() #2471); the inventory as a living document.test-support-inventory.md(new): the five test support patterns found across the 31 workspace members, with their consumers and the dependencies they force:testing/environmentmodules in four server packages, compiled into every build, forcing 9 normal dependency edges that production code does not use.test-helperscrate, whosehttp/udpmodules have one consumer (finding 1).#[cfg(test)]helpers intracker-coredeclaredpub mod.#[automock]mocks intracker-core(mockallas a normal dependency).tests/common/folders.docs/issues/drafts/1669-gate-server-testing-modules-behind-feature/) is removed and folded in; its feature-gating plan is option O1 and its coupling tool change is provisional subissue 8.docs/issues/open/1669-overhaul-packages/EPIC.md: one quick-list entry and one Details row for the sub-EPIC (its subissues are tracked in its ownEPIC.md), Specs Index link, and progress-log entries.workspace-coupling-report-2026-10-06.md: findings 1 and 2 link the sub-EPIC.da2ce7, review 5454599321): all seven findings fixed and recorded indocs/pr-reviews/pr-2484-review/PR-REVIEW.md; the sub-EPIC conversion came after and keeps those fixes.docs/pr-reviews/pr-2484-review/review-retrospective.md: a review retrospective of rounds 1 to 4, written at the maintainer's request. Rounds 2 to 4 came from the author's own edits; it proposes six process improvements, which the EPIC Overhaul: Automation Tools and AI Agent Guardrails #2003 owner triaged in this PR's conversation (dispositions in PRs docs(issues): [#2278] record the PR #2484 retrospective dispositions in the matrix #2494 and docs(issues): [#2003] overhaul the EPIC specification after the hand-off #2366).da2ce7) are all fixed and recorded in the audit record above.On GitHub, #2482 now carries the
EPIClabel instead oftask, and its body describes the sub-EPIC.The branch keeps its original name; renaming it would require a new PR.
Pre-commit and pre-push checks passed.