Repository navigation
docs(issues): [#2264] [#2278] record the discussion outcomes from PR #2428 - #2434
Conversation
There was a problem hiding this comment.
Copilot review overview
🟡 Changes recommended
The source discussion Outcomes remain stale and lack their required links to these canonical records.
Review effort: Balanced
Findings: 1
Open (1)
What changed in this PR
Records PR #2428’s design outcomes in EPICs #2264 and #2278.
Changes:
- Adds semantic-link and path-reference decisions to #2264.
- Adds audit-record decisions to #2278.
- Updates progress logs and timestamps.
| File | Description |
|---|---|
docs/issues/open/2264-2003-refactor-semantic-link-conventions/EPIC.md |
Records semantic-link decisions and updates affected planning. |
docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/EPIC.md |
Records audit-contract decisions. |
💡 Add a code-review agent skill or configure MCP servers for context-aware, tailored reviews. Learn more in the docs.
Copilot review 5407866771 raised one finding on this pull request: both discussion Outcomes still said nothing was recorded in an EPIC and lacked the link to their canonical records. The process-pr-review skill requires an audit record for every finding, so this records it as F1, Major from its bracket, FIXED by the Outcome-link commit, with the thread state the skill prescribes for a concern a change fixed. The reply URL is recorded once the reply is posted.
The reply on the F1 thread exists now, so the audit record carries its durable URL and the log entry for the push and the reply, as the process-pr-review skill requires before the thread is resolved.
The Docs Lint workflow failed on this branch because cspell does not know the word, which appears in a reviewer's finding quoted verbatim in the PR torrust#2434 audit record. The quoted text stays as written, so the word goes into the project dictionary, and the record's Processing Log notes the failure.
josecelano
left a comment
There was a problem hiding this comment.
Review of head d26ba356c. No blocking issues; two Minor accuracy findings (R1, R2) and two Nits (R3, R4) inline.
Checked on this head: all 6 commits GPG-verified; merges cleanly into develop 41add51ab; validate-audit-record.py --pr-number 2434 → 1 row, 0 failures; frontmatter-validator on the touched files, linter markdown, linter cspell, linter lychee → exit 0. The #2264 and #2278 records match the source Outcomes (48 dropped entries, the 53-in-34 recount note, the frozen-v1 caveat, the context-link rule, epic-owner = assignee). F1 is correctly fixed.
…'s review of PR torrust#2434 Review 5467876260 left four non-blocking findings. The audit record gains their rows and detail blocks, R1 to R3 resolved by the previous commit and R4 by this one. R4 asked for the F1 thread's resolution, which the log announced but never recorded; the log is append-only and checked for chronological order, so the entry is appended at the time of recording and states the resolution's own time in its text.
…#2434 round 2 reply URLs
…scussion outcomes Records the Outcome section of the semantic-linking discussion (docs/discussions/2003-overhaul-guardrails-and-automation/20261003-semantic-linking-knowledge-graph/README.md, merged in PR torrust#2428) and the goals-and-boundaries Outcome's parts that name this EPIC (the ADR-link purpose rule and the field-definition split) in a new Decisions Recorded on This EPIC section before Open Questions. Three Open Questions are marked as answered in direction or in part with a pointer, the Expected output cells of orders 5 and 7 carry the scope the decisions set, and a Progress Log entry and the update stamp follow. Related to torrust#2264
…he discussions Records, under Decision Record, the parts of the goals-and-boundaries discussion's Outcome section (docs/discussions/2003-overhaul-guardrails-and-automation/20261003-goals-and-boundaries/README.md, merged in PR torrust#2428) that bear on the audit record: the record as contract, stamped-or-checked copies of GitHub state as the premise of the validator rows, and epic-owner. It also records that the specifications-and-rationale Outcome sends no work here. A Progress Log entry and the update stamp follow. Related to torrust#2278
…m their Outcomes Both Outcome sections said none of their answers was recorded in an EPIC, which stops being true once this pull request records them in EPICs torrust#2264 and torrust#2278. The discussions convention has a discussion record its outcome and link the canonical document that carries it (docs/discussions/AGENTS.md, step 3), and the goals-and-boundaries Outcome itself records that a discussion is afterwards edited only to repair links. Each status sentence now names where its answers are recorded instead: the semantic-linking Outcome links the Decisions Recorded on This EPIC section of EPIC torrust#2264, and the goals-and-boundaries Outcome links that section and the Decision Record of EPIC torrust#2278. The EPIC torrust#2003 parts are on its overhaul pull request torrust#2366, which replaces that clause with a link when it lands. No other text changes. This fixes review-finding:pr-2434-f1 from Copilot review 5407866771.
Copilot review 5407866771 raised one finding on this pull request: both discussion Outcomes still said nothing was recorded in an EPIC and lacked the link to their canonical records. The process-pr-review skill requires an audit record for every finding, so this records it as F1, Major from its bracket, FIXED by the Outcome-link commit, with the thread state the skill prescribes for a concern a change fixed. The reply URL is recorded once the reply is posted.
The reply on the F1 thread exists now, so the audit record carries its durable URL and the log entry for the push and the reply, as the process-pr-review skill requires before the thread is resolved.
The Docs Lint workflow failed on this branch because cspell does not know the word, which appears in a reviewer's finding quoted verbatim in the PR torrust#2434 audit record. The quoted text stays as written, so the word goes into the project dictionary, and the record's Processing Log notes the failure.
…cord reference and cite the round-3 review The torrust#2264 record said the four-aspect frame and the discussions convention are recorded on torrust#2003, which holds only through that EPIC's open overhaul pull request torrust#2366; it now names that pull request, as the goals-and-boundaries Outcome does. The torrust#2278 record attributed its specifications-and-rationale bullet to review 5400754664, while that Outcome cites review 5402713128 (round 3); the bullet and its Progress Log entry now cite it. The torrust#2264 Progress Log entry gains the final period its neighbours have.
…'s review of PR torrust#2434 Review 5467876260 left four non-blocking findings. The audit record gains their rows and detail blocks, R1 to R3 resolved by the previous commit and R4 by this one. R4 asked for the F1 thread's resolution, which the log announced but never recorded; the log is append-only and checked for chronological order, so the entry is appended at the time of recording and states the resolution's own time in its text.
…#2434 round 2 reply URLs
ebe5e01 to
072cc27
Compare
|
Rebased onto |
|
ACK 072cc27 |
…specification 29b87d8 docs(pr-reviews): [#2278] record the PR #2431 round 2 reply URLs (Cameron Garnham) cf4b1b3 docs(pr-reviews): [#2278] record the maintainer's round 2 on PR #2431 (Cameron Garnham) 452a5ca docs(issues): [#2278] restate the #2362 overlap on current develop (Cameron Garnham) 0242f53 docs(issues): [#2278] cover the PR #2484 items the matrix assigns to order 5 (Cameron Garnham) 066dd18 docs(issues): [#2278] cite the skill, template, matrix and EPIC by stable references (Cameron Garnham) 79613e7 docs(issues): [#2278] carry the PR #2494 review's deferred R2 and R4 into the order-5 change (Cameron Garnham) a5130aa docs(pr-reviews): [#2278] add the PR #2431 review audit record (Cameron Garnham) bed38f9 docs(issues): [#2278] record a comparison base per historical audit (Cameron Garnham) 355e9c4 docs(issues): [#2278] specify the pre-posting pass of the self-audit gate (Cameron Garnham) b8d4397 docs(issues): [#2278] draft the order 5 self-audit gate specification (Cameron Garnham) Pull request description: Related to #2278 ## Summary This spec-only PR drafts EPIC #2278 order 5, "Add the author self-audit gate to `process-pr-review`". It contains planning documentation only: no skill, template, validator or workflow change. - **Draft specification for order 5.** New folder-style draft at `docs/issues/drafts/2278-author-self-audit-gate/ISSUE.md`. The order is docs only. It takes its content from the EPIC's retrospective-improvement matrix: the rows routed to the self-audit gate (run the validator when it can run and do its checks by hand otherwise, re-derive everything after a second re-raise and after context compaction, corrections re-derived from named Git or GitHub commands, command and result before narrative, no self-referential counts, one fix per commit, `git show --stat` on cited commits, log stamps from Git and GitHub timestamps), the F65 counterpart to "update progressively", the manual part of F55, and the two PR #2484 items the matrix assigns to order 5 (a manual sweep before each push to a reviewed branch, and anchoring each `Current-tree verification` to a heading or quoted phrase). Each gate pass is recorded as one append-only Processing Log entry naming the gated event and the commands run; no helper is a prerequisite and no per-finding field is added. Four commit points: the skill's gate section, template guidance, two checklist items, and the evidence with the EPIC row. - **Stable references.** The draft names matrix rows by F-ID or by source PR and a short quote, and cites the skill, the template, the validator and the EPIC by section heading or quote, so later merges into those files do not move its citations. The skill is at version 1.5 on `develop` `686a42f45`; order 5 bumps it from there, or from the version #2362 leaves. - **EPIC bookkeeping.** Progress Log lines record the draft and the carried review items; row 5 keeps its `TODO` status and placeholder path until the issue exists. ## Requested Maintainer Decisions The maintainer agreed with the draft's proposed answers to questions 2 to 5 in review 5469277375; question 1 waits on the restated #2362 overlap below. 1. Sequencing with #2362 (pending confirmation). Re-derived by quote on `develop` `686a42f45`, #2362 rewrites, in the skill, Workflow step 7's superseded-thread sentence, step 8 ("Consolidate review bodies"), the Detail-Entry Fields sentence on `FIXED` resolution references, and the Completion Checklist item on consolidated responses; in the template, the Status Values bullet on outdated threads, the `Resolution reference` placeholder and the guidance paragraph after it, and the Completion Rules bullets on outdated threads, consolidated responses and citing a fix. This order rewrites none of those passages, so no sentence is changed by both. Both edit three of the same sections (Workflow step 7, the Completion Checklist, and the template guidance beside Finding Details), where this order inserts next to #2362's passages, and both bump the skill version. The rule for a fix outside the tree, already on `develop`, is the text #2362's F5 and F6 wording starts from. Which lands first? The second rebases over the first's text in those three sections and takes the next skill version. 2. The copied `## Completion Rules` section carries no gate bullet, because every new record would copy it and order 8 would byte-diff it. Agreed as proposed. 3. One gate pass may precede several replies posted together when it covers every replied row. Agreed as proposed. 4. F75 (`RE_RAISE_OF` does not say whose finding ID it takes) keeps its wording with order 8, where the register places it. Agreed as proposed. 5. The EPIC's order-10 row lists "F55 as a self-audit step" while the matrix's F55 row places the manual step in T2; the draft keeps it here in its own commit so it can move unchanged. Agreed as proposed. 6. On approval, the GitHub issue is created, the draft moves to `docs/issues/open/` with its number, and row 5 links to it. ## Files Touched - `docs/issues/drafts/2278-author-self-audit-gate/ISSUE.md` (new) - `docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/EPIC.md` (one Progress Log line for the draft; with the carry commit, the References line, a second Progress Log line and the frontmatter stamp) - `docs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/retrospective-improvement-matrix.md` (the carry commit: one Disposition cell and the frontmatter stamp) - `docs/pr-reviews/pr-2431-review/PR-REVIEW.md` (new: the review audit record, rounds 1 and 2) ## Rebase, carried items and round 2 PR #2494 merged into `develop` at `686a42f45` and also changed the #2278 EPIC, so this branch was rebased onto it; every other file merged cleanly. The EPIC conflict is resolved by keeping both sides: PR #2494's changes, including its two 2026-10-08 Progress Log entries, and this branch's 2026-10-03 entry for the draft, placed before them so the log stays chronological. `docs(issues): [#2278] carry the PR #2494 review's deferred R2 and R4 into the order-5 change` applies the two non-blocking findings that review 5467975631 deferred to this change: the References line drops the clause on when the PR #2484 retrospective reaches `develop`, and the PR #2484 sweep row's Disposition reads "Adopt (manual sweep); Defer (audit-body tool check); Out of scope (tree-wide tool checks)". Review 5469277375 is answered by `docs(issues): [#2278] cite the skill, template, matrix and EPIC by stable references` (F3, F4), `docs(issues): [#2278] restate the #2362 overlap on current develop` (F5) and this description (F6). `docs(issues): [#2278] cover the PR #2484 items the matrix assigns to order 5` adds the two items the matrix has assigned to this order since PR #2494, and `docs(pr-reviews): [#2278] record the maintainer's round 2 on PR #2431` records the round. After PR #2434 merged, the branch was rebased again, onto `develop` `f960c78d7`; its ten commits keep their content, and the #2278 EPIC conflict is resolved as the maintainer asked. ## Merge order PR #2434 merged into `develop` at `f960c78d7`, and this branch is rebased onto it. The rebase touched only the #2278 EPIC's frontmatter stamp and the position of one Progress Log entry, resolved as the maintainer asked: both sides' entries are kept, this branch's 2026-10-03 17:09 entry sits before `develop`'s 2026-10-04 19:18 entry, and `last-updated-utc` stays "2026-10-09 11:16", the stamp of the merged log's latest entry. PR #2486 then merged into `develop` at `7711ade56`, and this branch is rebased onto it at the maintainer's request; no file conflicted, so every commit is unchanged in content (`git range-diff` against `284095128`: 10 commits equal). ## Validation At this head: In a Linux container with the workspace nightly toolchain, at the rebased head `29b87d8ef`, base `develop` `7711ade56` (the merge base): pre-commit profile gate exit 0 (79 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and 19 / 4 at `develop` re-measured; `validate-audit-record.py --pr-number 2431` against the review comments captured after the round-2 replies were posted: 6 rows, 12 log entries, 0 failures; `git range-diff` against `284095128` shows all 10 commits equal (the previous rebase's range-diff against `7b7348dbf`: 8 equal, 2 differing only in the resolved EPIC hunks). ACKs for top commit: josecelano: ACK 29b87d8 Tree-SHA512: fe6f791a4761f4b835d1c8c44df3e605182301606c9e6226b3f31b65f60eaa614ad210f881193d50f895420d6f7305a1df27092a3932661dbb7a59850756dd20
…-PRs as row 2.3 6c7b54e docs(pr-reviews): [#2264] record the PR #2425 round 2 reply URLs (Cameron Garnham) dbf7f54 docs(pr-reviews): [#2264] record the maintainer's round 1 on PR #2425 (Cameron Garnham) 19646e2 docs(issues): [#2264] state the B1 reproduction environment and toolchain (Cameron Garnham) 54e55ec docs(issues): [#2264] mark the D4 doc-types as proposed and pin the placeholder syntax (Cameron Garnham) 18b9cb4 docs(issues): [#2264] order the row 2.3 draft once and align it with rows 3 and 4 (Cameron Garnham) 4c6afa7 docs(pr-reviews): [#2264] record the PR #2425 reply URLs and thread resolution (Cameron Garnham) 36ab604 docs(pr-reviews): [#2264] record the reproduced B1 run in the PR #2425 audit (Cameron Garnham) f19c9e5 docs(issues): [#2264] record the reproduced stale-guidance run for row 3 (Cameron Garnham) 94cdd7f docs(pr-reviews): [#2264] reword the audit's branch-name sentence (Cameron Garnham) 1c668ab docs(pr-reviews): audit PR #2425 Copilot findings (Cameron Garnham) fb07d86 docs(issues): [#2264] make the row 3 advisory-severity scenario trigger a finding (Cameron Garnham) b8d8370 docs(issues): [#2264] exempt the template-exclusion test from row 3 AC3 (Cameron Garnham) d7c8947 docs(issues): [#2264] split the row 3 stale-guidance fix into red, fix, and green tasks (Cameron Garnham) e27b7dc docs(issues): [#2264] record the stale-guidance reproduction attempt for row 3 (Cameron Garnham) 721d75e docs(issues): [#2264] name the spec-only branch in the row 3 draft (Cameron Garnham) 943953d docs(issues): [#2264] draft row 3 spec and order related-PRs as row 2.3 (Cameron Garnham) Pull request description: Related to #2264 ## Summary This spec-only PR plans the next Frontmatter step of EPIC #2264. It contains planning documentation and its review audit only: no validator, template, skill, or schema change. - **Draft specification for EPIC row 3, "Extend strict profiles and author guidance".** New folder-style draft at `docs/issues/drafts/2264-extend-strict-profiles-and-author-guidance/ISSUE.md` (`status: draft`, `github-issue: null`). It extends the canonical Rust frontmatter model beyond the strict issue and EPIC profiles to the classes the v1 contract defers (ADRs, Agent Skills and agent profiles, evidence and plan records), protects `docs/templates/` against drift from the contract (the validator command excludes that folder today), and replaces duplicated field lists in author guidance with references to the generated schema. It proposes decisions D1-D8 with recommendations and alternatives, names the EPIC Open Questions it answers or defers, and plans tasks T1-T9 with commit points, acceptance criteria AC1-AC10, and manual scenarios M1-M7. Implementation starts with an approval checkpoint for an issue-local profile catalog. - **Triage of the unordered draft proposal.** "Support multiple related pull requests in issue frontmatter" becomes row 2.3 of the Progressive Subissues table, before row 3, instead of being merged into row 3: it changes the existing strict issue and EPIC profiles, while row 3 adds profiles for other document classes. The row states its dependencies, including that it is `BLOCKED` until row 4 is done if it needs a new `schema-version`; the Draft Subissue Proposals list now reads "None pending.", and the Progress Log entry that records the triage carries its reason. - **EPIC bookkeeping.** Progress Log entries record the triage and this review round. The EPIC's frontmatter is unchanged: `develop` already carries `epic-owner: da2ce7` and a later `last-updated-utc`. Row 3 stays `TODO` until its GitHub issue exists. - **First review round (automated review 5400517694).** All five findings, F1-F5, are fixed and recorded in `docs/pr-reviews/pr-2425-review/PR-REVIEW.md`; their replies are posted and their threads resolved. The stale convention field lists stay under the `fix-bug` workflow, and the reproduction recorded in section B1 of the draft's `manual-verification-evidence.md` is `Reproduced`. ## Maintainer Review Round 1 (review 5468099277) All seven findings are fixed, R1-R3 as requested and R4-R7 as suggested, in these commits: - `docs(issues): [#2264] order the row 2.3 draft once and align it with rows 3 and 4` (R1, R2, R4): the triaged draft leaves the unordered proposals list, and its reason moves into the triage's Progress Log entry. The row 3 risk "Ordering after EPIC row 2.3" states the soft preference to start after row 2.3, with its reasons, and row 2.3 is `BLOCKED` until row 4 is done if it needs a new `schema-version`, while row 3 proceeds without it. - `docs(issues): [#2264] mark the D4 doc-types as proposed and pin the placeholder syntax` (R3, R5, R7): D4 marks `adr`, `implementation-retrospective`, `agent-review-reports`, and `security-report` as proposed `doc-type` values that their templates must start emitting. T1 and AC1 record a disposition for every file in `docs/templates/`. D6 pins the enumerated-placeholder syntax and reports other spellings as drift. A note under the baseline table says T1 re-measures the counts. - `docs(issues): [#2264] state the B1 reproduction environment and toolchain` (R6): section B1 names the environment as a Linux container with the workspace nightly toolchain, aligns step 3 with that toolchain, and states which parts of the first observed record come from the transcript of the run and which were completed from the validator source. - `docs(pr-reviews): [#2264] record the maintainer's round 1 on PR #2425`: rows R1-R7 with their verifications and the reply texts for posting. - `docs(pr-reviews): [#2264] record the PR #2425 round 2 reply URLs`: the seven Reply URL fields name the posted replies, and the seven threads are resolved. ## Requested Maintainer Decisions 1. Approve, change, or reject the placement of the multiple-related-PRs draft as row 2.3, and its stated dependencies. 2. Review the row 3 draft's scope and decisions D1-D8, in particular D2 (new profiles join `schema-version: 1` as additive profiles), D3 (explicit `doc-type` opt-in rather than path-based classes), D4 (the candidate catalog and the producer criterion), D5 (an extension-only profile for Agent Skills and agent profiles), and D6 (a placeholder-aware template mode instead of excluding `docs/templates/`). 3. Confirm that the stale convention field lists are handled as bug work under `fix-bug` (Bug-Fix Process, evidence section B1, and tasks T7a-T7c) rather than as a documentation-only task. 4. On approval, the GitHub issue is created, the draft moves to `docs/issues/open/` with its issue number, and row 3 links to it. The spec's "Spec reviewed and approved by user/maintainer" checkpoint stays unchecked until then. 5. Confirm `da2ce7` as the EPIC owner. ## Files Touched - `docs/issues/drafts/2264-extend-strict-profiles-and-author-guidance/ISSUE.md` (new) - `docs/issues/drafts/2264-extend-strict-profiles-and-author-guidance/manual-verification-evidence.md` (new) - `docs/issues/open/2264-2003-refactor-semantic-link-conventions/EPIC.md` (Progressive Subissues table, Draft Subissue Proposals list, Progress Log) - `docs/pr-reviews/pr-2425-review/PR-REVIEW.md` (new) ## Rebase PR #2434 merged into `develop` at `f960c78d7` and also changed the #2264 EPIC, so this branch is rebased onto it; every other file merged cleanly, and the sixteen commits keep their content apart from that file. The conflict is resolved by keeping both sides' Progress Log entries in stamp order: this branch's 2026-10-03 10:56 entry, `develop`'s 2026-10-04 19:18 entry, then this branch's 2026-10-09 10:25 entry, each with its existing wrapping. `last-updated-utc` keeps `develop`'s "2026-10-09 10:41", the time of PR #2434's edit to this file, which is later than every entry. The base is now `f960c78d7`. After the maintainer's approval the branch was 57 commits behind `develop` again, and it is rebased from `f960c78d7` onto `develop` at `f7380a4d4` at the maintainer's request; no file conflicted, and `git range-diff f960c78..c1d6b45 f7380a4..6c7b54e` reports all sixteen commits as unchanged. The base is now `f7380a4d4`. ## Validation In a Linux container with the workspace nightly toolchain, at the rebased head `c1d6b4572`, base `develop` `f960c78d7` (the merge base): pre-commit profile gate exit 0 (80 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and 19 / 4 at `develop` re-measured; `git range-diff` against `5f6ef0e73` shows 14 commits equal and 2 differing only in the resolved EPIC hunks. At the rebased head `6c7b54eac`, base `develop` `f7380a4d4` (the merge base): pre-commit profile gate exit 0 (84 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and 19 / 4 at `develop` re-measured; `validate-audit-record.py --pr-number 2425` against the review comments captured on 2026-10-13: 12 rows, 27 log entries, 0 failures; `git merge-tree` against `develop` clean. - markdownlint (`markdownlint-cli2` with the repository `.markdownlint.json`) on all four files: 0 errors. - `git diff --check`: clean. - `validate-audit-record.py --pr-number 2425` at the rebased head, against the review comments captured after the replies were posted: 12 rows, 27 log entries, 0 failures. - B1 reproduction (section B1 of `docs/issues/drafts/2264-extend-strict-profiles-and-author-guidance/manual-verification-evidence.md`): `Reproduced` in a Linux container with the workspace nightly toolchain; the maintainer's independent rerun on the PR head printed the same records; the rebase leaves the draft and its evidence unchanged. ACKs for top commit: da2ce7: ACK 6c7b54e — the rebase onto `f7380a4d4` is content-identical (all 16 commits equal in the range-diff), the pre-commit gate and the three linters pass at this head, the frontmatter validator equals the `develop` baseline, and the audit validator reports 12 rows and 0 failures josecelano: ACK 6c7b54e Tree-SHA512: 49be231d588f474d40c340521ce7df069bb37d5a38fdf110899852aadb5d62c31bdd3636a0d86688983444caf48b35cbe586374b81846bee04a71700babeacdf
…ter the hand-off 27ddb0a docs(issues): [#2003] describe the register's index as five comments at its 2026-10-11 revision (Cameron Garnham) 48a5d0e docs(issues): [#2003] record the provenance rounds and the rebase, and drop the index version (Cameron Garnham) 3ffa0f5 docs(pr-reviews): [#2003] record the PR #2366 reply URLs (Cameron Garnham) 2e27966 docs(pr-reviews): [#2003] add the PR #2366 review audit (Cameron Garnham) 5ae74fb docs(issues): [#2003] refresh the friction register section and the checkpoint range (Cameron Garnham) 7356602 docs(issues): [#2003] record the PR #2484 retrospective dispositions (Cameron Garnham) 914f8ae docs(issues): [#2003] follow the prose-tests draft's placement under the EPIC (Cameron Garnham) 3fa09ac docs(issues): [#2003] record the discussion outcomes on the EPIC (Cameron Garnham) 20c2d33 docs(issues): [#2003] place the two draft specifications and record the #2375 scheduling (Cameron Garnham) f95f26d docs(issues): [#2003] overhaul the EPIC specification after the hand-off (Cameron Garnham) Pull request description: ## Summary Overhauls the EPIC #2003 specification so the file carries what the issue's comment thread established since July, and hands the EPIC to its new owner. Ten commits: six change the EPIC, the seventh adds this pull request's review audit record, the eighth records the reply URLs in it, the ninth records what the rebase onto current `develop` brought, and the tenth describes the register's index as the five comments it now spans. The GitHub issue body mirrors the EPIC under the Issue Body Mirror rule in its Verification Plan and is re-derived from this head (see Validation). Related to #2003 ## Files touched - `docs/issues/open/2003-overhaul-guardrails-and-automation/EPIC.md` (commits 1 to 6, 9 and 10) - `docs/pr-reviews/pr-2366-review/PR-REVIEW.md` (commit 7, new) ## First commit: the overhaul after the hand-off `docs(issues): [#2003] overhaul the EPIC specification after the hand-off` The GitHub issue body was updated first (2026-09-28 16:39 UTC) and mirrored this file exactly; 42 of the issue's 46 comments were then minimized because the text carries them, and only the friction register index (two comments at the time) and the ownership record stayed visible. What the revision adds: an owner line; the Subissues table through order 13 in the template's columns (statuses, notes, the two child EPICs, #2347 and #2360); the order-12 close-out list; the follow-up owners created by #2347; the five undecided improvement candidates from the #2347 retrospective; a "Decisions Recorded on This EPIC" section (interim formatter, author-side register items to #2278, semantic labels, ownership); a "Friction Register" section with the labelling rule, the closed F series, the disposition precedence, the in-place filing rule and the per-group counts of 2026-09-28; the findings without an owning subissue; dated progress-log entries; an "Issue Body Mirror" rule under Verification Plan; four new risks; and reference lines for the index, the ownership record and the inventory measurements. Sections that were already current are unchanged apart from reflowing each paragraph, list item and table row onto one line. Frontmatter: `epic-owner` is `da2ce7`; `status` stays `planned`; `last-updated-utc` is the quoted UTC minute of the last edit and equals the last progress-log entry; the semantic links gain `process-pr-review` and the child-EPIC, #2347 and schema artifacts. ## Second commit: the draft specifications and the #2375 scheduling `docs(issues): [#2003] place the two draft specifications and record the #2375 scheduling` Places the two draft specifications that landed on `develop` (the AI-agent memories draft and the AI-harness workspace draft) under a new "Drafts Awaiting Issues" subsection, records the #2375 scheduling position in its row, and adds the placement decision and a progress-log line. ## Third commit: the discussion outcomes `docs(issues): [#2003] record the discussion outcomes on the EPIC` After PR #2428 merged the three design discussions, records under `Decisions Recorded on This EPIC` the goals-and-boundaries decisions (the four-aspect frame, the gates, contract versus technique, coordination claims, copies of GitHub state, the discussions convention) and the four specifications-and-rationale answers as revised in review round 4, each linking its Outcome section by path and naming the review that holds it, with a Progress Log entry and the update stamp. The parts that belong to #2264 and #2278 are recorded in PR #2434. ## Fourth commit: the prose-tests draft's placement `docs(issues): [#2003] follow the prose-tests draft's placement under the EPIC` Follows the prose-tests ADR draft's placement under this EPIC, merged by PR #2437. The specifications-and-rationale decision links the draft at `docs/issues/drafts/2003-adopt-prose-tests-as-executable-specification/ISSUE.md`, and Drafts Awaiting Issues lists it beside the memories and harness-workspace drafts, under the Scope exception until its issue is created. ## Fifth commit: the PR #2484 retrospective dispositions `docs(issues): [#2003] record the PR #2484 retrospective dispositions` The PR #2484 review retrospective asks this EPIC's owner to decide which of its six proposals enter this EPIC or #2278. A Friction Register paragraph records where each lands: items 1 to 3 in #2278's improvement matrix (orders 5, 8 and 10, added by PR #2494); item 4 (one stamp per event in spec progress logs) on `issue-template-log-correction-rule-unstated`; item 5 (a step for restructuring a spec under review) on `create-issue-issue-to-epic-conversion-unstated`; item 6 (one session per pull-request branch) as a new label against `docs/agents/orchestration.md`; and item 1's tree-wide path sweep and line-width check on `linter-path-citations-unchecked` and `write-markdown-docs-line-wrap-rule-unstated`. A Progress Log entry stamped 2026-10-08 16:50 UTC records the triage, and `last-updated-utc` matches it. ## Sixth commit: the friction register section and the checkpoint range `docs(issues): [#2003] refresh the friction register section and the checkpoint range` Answers R1 and R2 of review 5468071770: - The Friction Register describes the register's index as the four comments it now spans: at index v31 (2026-10-08 13:31 UTC) they hold 12 artifact groups and 238 labels, 236 frictions and two CI findings, with a bullet per part naming its groups, and part 3 carries the live counts. The bullet on the closed F series points to the former-number map in part 3. - The counts table of 2026-09-28 is kept as a dated snapshot rather than refreshed, because a stamped copy of GitHub state stays true as later batches change the counts; its caption says so and points to part 3, and the clusters sentence speaks of that revision. - The introduction no longer carries a friction count, for the same reason. - The Delivery Strategy and the Workflow Checkpoints drop the "orders 1–14" range, so neither goes stale with the next Subissues row. - A Progress Log entry records the round, and `last-updated-utc` matches it. ## Seventh commit: the review audit `docs(pr-reviews): [#2003] add the PR #2366 review audit` Adds `docs/pr-reviews/pr-2366-review/PR-REVIEW.md` from the repository's audit template: R1 (Major), R2 (Minor), R3 (Minor) and R4 (Nit) of review 5468071770, each with its source thread, concern, solution, current-tree verification and resolution reference, and a Processing Log. R1 and R2 are fixed by the sixth commit; R3 needs no change, as the Merge order below explains; R4 is answered by this description. ## Eighth commit: the reply URLs `docs(pr-reviews): [#2003] record the PR #2366 reply URLs`: the audit record's four Reply URL fields, and the Resolution reference of R3 and R4, name the posted replies on the four threads, which are resolved. ## Ninth commit: the provenance rounds, the rebase and the index revision `docs(issues): [#2003] record the provenance rounds and the rebase, and drop the index version` After the rebase onto `develop` `5d05fefdd`, the 185 commits that arrived were checked against every section of the EPIC. Two of the merged pull requests are rounds of the AI-model-provenance discussion under this EPIC: PR #2486 (the decision owner's round on Q1 to Q11) and PR #2502 (the opening author's reply on Q1 and Q11 with a new Q12). Its Outcome is pending, so nothing enters Decisions Recorded on This EPIC, and the EPIC lists discussions only through their recorded Outcomes. The other merged work changes no fact the EPIC states: every path it names still resolves, and the subissue rows, drafts, follow-up owners and open findings hold as written. A Progress Log entry records the rebase and the two rounds, and `last-updated-utc` matches it. The Friction Register names the index revision by its timestamp alone, as review 5505015377 suggests, because no index comment carries a version number; the 2026-10-09 log entry that mentions the version stays as written. ## Tenth commit: the register's index as five comments `docs(issues): [#2003] describe the register's index as five comments at its 2026-10-11 revision` Batch 32 laid the register's index out in five comments on 2026-10-11 at 09:08 UTC ([comment 6107435063](#2003 (comment))). The Friction Register's stamped state line now describes that revision: five comments holding 13 artifact groups and 255 labels, 253 frictions and two CI findings, counted from the five comments' bodies. Each part's bullet names the groups it holds now, with a new bullet for part 5 (the hooks, linters and maintenance skills, and the archiving skill `cleanup-completed-issues`). References links all five parts, and a Progress Log entry records the change with `last-updated-utc` matching it. ## Merge order PR #2494 merged on 2026-10-09 at 11:09 UTC as `686a42f45`, so the Friction Register paragraph saying the PR #2484 retrospective's six proposals are dispositioned in #2278's improvement matrix is true on `develop`. **Rebase.** After review 5505015377 approved this pull request at `5dd98ecd0`, the branch was 185 commits behind `develop`; at the reviewer's request it was rebased onto `develop` `5d05fefdd` with no conflict, and `git range-diff` shows all eight commits equal. The ninth commit records what the rebase brought. ## Validation In a Linux container with the workspace nightly toolchain, at the fixes head `cc6dee1e3` and again at the reply-URL head `5dd98ecd0`, base `1d116fbfa` (this branch's merge base with `develop`): pre-commit profile gate exit 0 (76 s and 130 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at each head and 19 / 4 at the base re-measured; `validate-audit-record.py --pr-number 2366` at `5dd98ecd0`, against the review comments captured after the replies were posted: 4 rows, 3 log entries, 0 failures (at `cc6dee1e3` the only failures were the placeholder Reply URL and Resolution reference fields then pending). The issue body was re-derived from this head by the Issue Body Mirror rule (drop the frontmatter, the skill-link marker and the title line, keep the rest byte for byte) and compared with the live body: the only differences are the sixth commit's changes below the frontmatter, nine lines changed and three added (the introduction, the Friction Register paragraph and its four index bullets, two of them new, the F-series bullet, the counts caption, the clusters sentence, the Delivery Strategy sentence, the checkpoint line and the new Progress Log entry). The live body was replaced by the derived text on 2026-10-09 10:43 UTC. At the new head, base `develop` `5d05fefdd`: In a Linux container with the workspace nightly toolchain, at the rebased head `27ddb0ab6`, base `develop` `5d05fefdd` (the merge base): pre-commit profile gate exit 0 (76 s); `linter markdown`, `linter cspell`, `linter lychee` exit 0; `frontmatter-validator --all` 19 errors / 4 warnings at the head and the same at `develop` re-measured; `validate-audit-record.py --pr-number 2366` against the review comments captured on 2026-10-13: 4 rows, 3 log entries, 0 failures; `git merge-tree` against `develop` clean; `git range-diff` against `5dd98ecd0` shows the eight earlier commits equal. The issue body was re-derived from the new head by the Issue Body Mirror rule and compared with the live body, last edited on 2026-10-11. The only differences are the ninth and tenth commits' changes below the frontmatter (the Friction Register sentence and its part bullets, the References line, and the two new Progress Log entries) and one trailing blank line that the live body carries and the rule does not produce. ACKs for top commit: josecelano: ACK 27ddb0a Tree-SHA512: a7b1c468c7e89794c638ef235dd44c28e6c96b5fe0dc5cfd48c144c0423c04072b466f9f0f27a40fe6dfa065ab0ae315e7004c7879ae73c92b2cc0fe54b96eb0

Related to #2264
Related to #2278
Summary
PR #2428 merged three design discussions under
docs/discussions/2003-overhaul-guardrails-and-automation/, each ending in an Outcome section that transcribes the EPIC owner's answers and notes that none of them is recorded in an EPIC yet. This documentation-only PR records the parts that belong to EPICs #2264 and #2278 in their specifications, each record linking its Outcome section by path and naming the review that holds it. The #2003 parts are recorded on the EPIC's own open PR #2366.Decisions Recorded on This EPICsection, placed beforeOpen Questions, records the semantic-linking discussion's four answers (inventory first, pinned to a nameddevelopcommit; onekind:valueform for every target without a path, with the recount at the sweep's starting head and the note that this touches the frozen v1 convention; tracked files only, with GitHub-hosted records as a dated derived export; where the decisions are recorded) and the goals-and-boundaries parts that name this EPIC (links validated by the purpose of their field; the change-impact field definition split or qualified). The three Open Questions these answer are marked as answered in direction or in part, with a pointer, and the Expected output cells of orders 5 and 7 carry the scope the decisions set. One Progress Log entry and the update stamp.Decision Recordrecords the audit-record parts of the goals-and-boundaries Outcome: the record as contract, stamped-or-checked copies of GitHub state as the premise of the validator rows, andepic-owner; it also records that the specifications-and-rationale Outcome, from review 5402713128 (round 3), sends no work to this EPIC. One Progress Log entry and the update stamp.Files Touched
docs/issues/open/2264-2003-refactor-semantic-link-conventions/EPIC.mddocs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/EPIC.mddocs/discussions/2003-overhaul-guardrails-and-automation/20261003-semantic-linking-knowledge-graph/README.mdand…/20261003-goals-and-boundaries/README.md(round 1: the Outcome status sentences now link their records)docs/pr-reviews/pr-2434-review/PR-REVIEW.md(new: the review audit record, extended in round 2)project-words.txt(one word,backlink, which a reviewer finding quoted in the record uses)Review round 1
F1 (Major) of review 5407866771 is fixed: the two merged discussion Outcomes said none of their answers was recorded in an EPIC and lacked the backlink the convention asks for.
docs(discussions): link the #2264 and #2278 records from their Outcomesreplaces each Outcome's status sentence with the links to #2264'sDecisions Recorded on This EPICand #2278'sDecision Record; the #2003 parts are named as recorded by the overhaul pull request #2366, which replaces that clause with the link when it lands. The audit record carries F1 as FIXED and RESOLVED with its reply URL. The Docs Lint workflow failed on the first pushed head of that round on the wordbacklinkinside the quoted finding; the word is added to the project dictionary rather than rewording the reviewer's text.Review round 2
Review 5467876260 found no blocking issues and left four non-blocking findings, all fixed in two commits on top of
d26ba356c:docs(issues): [#2264] [#2278] hedge the #2003 record reference and cite the round-3 reviewfixes R1 to R3. R1 (Minor): Refactor Semantic Link and Frontmatter Conventions #2264's "Where these decisions are recorded" bullet now says the four-aspect frame and the discussions convention "are recorded on Overhaul: Automation Tools and AI Agent Guardrails #2003 by its overhaul pull request docs(issues): [#2003] overhaul the EPIC specification after the hand-off #2366", the goals-and-boundaries Outcome's hedge, becausedevelopdoes not yet carry them. R2 (Minor): Strengthen PR review author self-audit and evidence generation #2278's specifications-and-rationale bullet cites review 5402713128 (round 3) beside its Outcome link, and the 2026-10-04 Progress Log entry names it for that discussion. R3 (Nit): Refactor Semantic Link and Frontmatter Conventions #2264's 2026-10-04 Progress Log entry gains its final period. Both EPICs'last-updated-utcis bumped; neither file logs corrections of its own text, so no Progress Log entry is added.docs(pr-reviews): [#2264] [#2278] record the maintainer's review of PR #2434fixes R4 (Nit) and records the round: rows and detail blocks for R1 to R4, and appended Processing Log entries, one of which records that the F1 thread was resolved immediately after its reply was posted at 2026-10-04 19:59:32 UTC. The log is append-only and checked for chronological order, so that entry carries the time it was recorded and states the resolution's time in its text.A third commit,
docs(pr-reviews): [#2264] [#2278] record the PR #2434 round 2 reply URLs, names the four posted replies in the record; the four threads are resolved.Rebase after PR #2494
PR #2494 merged into
developat686a42f45and also changeddocs/issues/open/2278-2003-strengthen-pr-review-author-self-audit/EPIC.md, so this branch was rebased onto it; every other file merged cleanly, and the nine commits keep their content apart from that file. The conflict is resolved by keeping both sides: PR #2494's changes to the EPIC (the Decision Record's wording, the notes on rows 5, 8 and 10, AC1, References and its two 2026-10-08 Progress Log entries) and this branch's Decision Record sub-list, with review 5402713128 cited on the specifications-and-rationale bullet, and its 2026-10-04 Progress Log entry, which now sits before the 2026-10-08 entries so the log stays chronological.last-updated-utcis this branch's 2026-10-09 10:41, the round-2 fix, which is later than every entry.Validation
At this head:
In a Linux container with the workspace nightly toolchain, at the rebased head
072cc27d2, basedevelop686a42f45: pre-commit profile gate exit 0 (74 s);linter markdown,linter cspell,linter lycheeexit 0;frontmatter-validator --all19 errors / 4 warnings at this head and atdevelopre-measured;validate-audit-record.py --pr-number 2434against the review comments captured after the round-2 replies: 5 rows, 9 log entries, 0 failures;git range-diffagainst the pre-rebase head shows seven commits equal and two differing only in the resolved EPIC hunks. The earlier heads' results: at75a7682eeandebe5e0138(base39e5b1b8c), pre-commit profile gate exit 0 (119 s and 147 s), the three linters exit 0,frontmatter-validator --all22 / 4 at each head and at the base, the audit validator 0 failures atebe5e0138.