Skip to content

docs(pr-reviews): [#2347] triage post-merge review findings on five merged PRs - #2363

Merged
josecelano merged 44 commits into
torrust:developfrom
josecelano:2347-2003-triage-post-merge-review-findings
Sep 28, 2026
Merged

josecelano merged 44 commits into
torrust:developfrom
josecelano:2347-2003-triage-post-merge-review-findings

Conversation

@josecelano

@josecelano josecelano commented Sep 28, 2026 •

Copy link
Copy Markdown
Member

Summary

Implements #2347 (EPIC #2003, order 12): it processes the 32 review findings that da2ce7 posted after PRs #2290, #2293, #2300, #2313, and #2320 had merged. The maintainer approved every disposition before any fix. Approval record: #2347 (comment). Amendments: #2347 (comment) and #2347 (comment).

The order of work followed the PR #2339 / PR #2344 precedent. First the fixes and follow-up issues were committed and this PR was opened as a draft. Then each of the 32 threads got a disposition reply, and finally one audit commit per merged PR cites those replies. The rationale is in the spec's "Disposition Decisions (T3)" section.

Disposition Count Findings
FIXED 14 #2290 F1, F2, F3, F5 (the audit itself), F6; #2293 F2, F4, F7; #2300 F5, F6, F9; #2313 F8; #2320 F29 (reviewer F25); #2293 F3, fixed upstream by PR #2357
NO_ACTION 9 #2290 F7; #2293 F6, F8; #2300 F7, F8, F11, F12; #2313 F10; #2320 F28 (reviewer F24)
FOLLOW_UP 9 #2290 F4 → #2360; #2293 F1 → #2361; #2293 F5 → #2301; #2300 F10 → #2278 order 8; #2313 F4, F5, F6, F7, F9 → #2362

Following process-pr-review "Reviews Submitted After Merge", the 13 fixes in this PR are recorded as FOLLOW_UP/OPEN until it merges. A close-out PR (T7) then changes them to FIXED, replies, and resolves the fixed and declined threads. #2293 F3 was already fixed on develop, so its row is FIXED/RESOLVED and its thread is resolved. FOLLOW_UP threads stay open until their owning issue's fix merges.

Changes

Validation

Related to #2347. The issue stays open for the T7 close-out.

da2ce7
da2ce7 previously requested changes Sep 28, 2026

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 578a55f374b1455971e4470319a62893a19e6011 (round 1, draft head, on the maintainer's request). Recomputed from the bytes at this head.

What this PR is. 26 commits over develop 8a953724d (the #2357 merge; the merge base is the develop tip and git merge-tree --write-tree is clean), 25 files, +1238/−24, documentation only. It records the T2 triage and the approved T3 dispositions for the 32 post-merge findings on #2290, #2293, #2300, #2313 and #2320: 14 FIXED, 9 NO_ACTION and 9 FOLLOW_UP. Twelve of the fixes land here, one per commit; #2293 F3 was fixed upstream by #2357, and #2290 F5 is fixed by the T4 audit. The PR also adds the follow-up specs #2360, #2361 and #2362 with their EPIC rows, and points the existing owners #2301 and #2278 order 8 at their findings. As the draft declares, the five audit records and T6 are not at this head yet. I did not review their absence as a gap.

Verification. The T3 table sums to 14 + 9 + 9 = 32 and matches approval 5865646588 and both amendments. Each 17/5/10 → 14/9/9 move is named with a reason. The 32 replies of 10:28–10:30Z split into 13 "addressed in #2363, not yet on develop", 1 "Fixed on develop by PR #2357", 9 "No action" and 9 "Follow-up: tracked" (#2360, #2361, #2301, #2278 order 8, #2362 ×5). No reply claims a fix in this PR is on develop. The #2293 F3 claim is true: a standard-library structural parse rejects the #2222 plan frontmatter at 478516cf (indents 4, 3, 4, 6, 6) and accepts it at develop and here, and the head blob equals develop's.

  • FIXED: 13 hold at this head, 0 do not, and 1 (#2290 F5) is pending the declared T4 audit.
  • NO_ACTION: 8 reasons hold at this head; #2320 F28's holds on develop but not here (F1).
  • FOLLOW_UP: all 9 owners carry their finding.
  • Corrections: the append-only records (agent-review-reports entries, audit Processing Logs, evidence files) are appended to. They cite Conventional Commit subjects, each matching exactly one commit on develop, or ids already on develop. Every recorded command that is re-runnable without a toolchain reproduces its recorded output. The #2320 retrospective's own text (lines 36-37) allows in-place corrections.
  • New specs: they follow create-issue and the issue template, carry the right parent and EPIC row, and match their GitHub issues section by section.
  • #2347 spec: all 32 inventory rows match the thread roots. Review ids, merge times, the audit ranges (F1-F4, F1-F3, F1-F27) and the 7/8/8/7/2 two-comment thread state all recompute, and the progress log is append-only and in order. One stale count remains (F2).

Findings (inline)

  • F1 [Minor]: the F29 in-place edit shifts later lines of the #2320 retrospective, so three #2320 audit entries now cite wrong lines, and #2320 F28's reason stops holding.
  • F2 [Minor]: the T3 "stay FOLLOW_UP until merge" bullet still says 14 fixes and three replies per thread; amendment 2 makes #2293 F3 FIXED/RESOLVED.
  • F3 [Nit]: triage.md's last-updated-utc is older than its last two edits.
  • F4 [Suggestion]: the #2290 F5 reply cites an audit commit subject that T4 must reuse exactly.

F1 and F2 each leave a false statement in the merged tree, so this round requests changes. Both fixes are one-line edits.

Checked, no finding

  • The 12 fix commits against their findings: #2290 F1, F2, F3, F6; #2293 F2, F4, F7; #2300 F5, F6, F9; #2313 F8; #2320 F29.
  • Unreachable ids (7e6f5425, d75276ff, 88822c5c, aa026584, 1682aff5, b33e2807, 27a57e1b) exit 128; each replacement subject matches exactly one commit on develop.
  • #2261 M1 commands; #2308 V1 corrected pattern (5 lines, as recorded); #2295 AC6 diff (117 insertions); #2300 F5 times (15:20:35Z, 15:23:23–29Z, 15:24:57Z); #2320 F29 ancestry (5 of 7 ids on develop).
  • NO_ACTION facts: "Eleven" in the #2261 records; trigger pull_request at the head and at #2293's base; 11 of 15 workflows lack permissions:; all six PRs come from a fork; 12 records' ## Status Values equal the template; d6b884af dropped the stale clause; b5efb5c10 and 8f430738c wrote the develop stamps.
  • #2301 In Scope covers #2293 F5; the #2278 order 8 row names review-finding:pr-2300-f10; #2362 carries F4-F7 and F9.
  • #2361 tool claims (main.rs:162, :176, lib.rs:149-151, workflow :123-125, :154) and evidence-file shape.
  • Non-documentation touches: the workflow line is comment only (# skill-link: implement-workflow); the .github/workflows/AGENTS.md frontmatter is the canonical Markdown form (docs/skills/semantic-skill-link-convention.md, precedent docs/AGENTS.md); add-new-skill sets no version-bump rule for the Skill Links addition; docs/testing.md matches the workflow name:.
  • Commits: all 26 subjects are Conventional; the three add issue specification for #N subjects follow create-issue step 5 and develop precedent; no trailers, no banned token, no PR-branch ids; times in order. The PR body table matches T3.

Orchestrator's server checks (head 578a55f37, base 8a953724d, nightly rustc 1.100.0-nightly (1303417c4 2026-09-21)). Gate (the pre-commit profile: cargo machete --with-metadata, cargo deny check bans, nightly fmt --check, linter all, hadolint, cargo test --doc --workspace): every step pass, wall 75 s, worktree unchanged after the run. frontmatter-validator --all from this head: exit 1, nothing on stdout, 35 error legacy-shape and the same 4 closed-spec warnings as develop (#2280, #2289, #2295, #2308), no record for any file this PR adds or changes — so the three new specs pass the v1 schema and the repository checks. F1 recomputed independently: git grep -nE 'round-4 body|Branch ids: F2, F9|once, the 20:12 push' on the #2320 retrospective returns lines 161, 429, 433, 434 at develop and 162, 430, 434, 435 at this head, while PR-REVIEW.md:501 still reads "matches lines 429, 433 and 434".

@da2ce7 da2ce7 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewed at 30f7419c4adb01846bdc80701d3a2981f3273c7c (round 7; round 6 was 5341713976 at d5bb52f33, dismissed automatically by this push; round 5 was 5340689822 at f102d701d, round 4 was 5340437680 at 068a0189b, round 3 was 5339061836 at c8676f77c, round 2 was 5338643536 at 1ec319d8d, round 1 was 5337742420 at 578a55f37). Recomputed from the bytes at this head.

What changed since round 6. One commit, docs(pr-reviews): [#2347] record PR #2363 review rounds 4 and 5, adds to pr-2363-review the F14 row and detail section, a Round 4/5 paragraph, and three Processing Log entries (15:01, 16:25, 16:27). It also adds a 16:29 entry to the #2347 spec and refreshes its stamp.

Verification.

  • F14: Human, Minor, FIXED/RESOLVED, from review 5340689822. The Source URL is the thread's first comment (r4123802356, 15:10:09Z), the Reply URL is the maintainer's reply on the same thread (r4124584947, 16:26:09Z), and the Resolution reference is the fix's subject. The raw body of review 5338724829 contains alt="Medium severity" and alt="Low severity". validate-audit-record.py --comments-file exits 0 with 14 rows.
  • The Round 4/5 paragraph and the three log entries match the captured ids, head subjects and times: approval 14:51:06Z, dismissal 15:01:19Z, round 5 15:10:09Z, fix authored 16:20:03Z and deployed 16:25:46Z, reply 16:26:09Z. ACK 068a0189b… quotes PR comment 5872439605 with its sha shortened, which is fine.
  • The spec's 16:29 entry holds, and its stamp is no later than the commit (16:32:07Z).

Round-6 finding
F15 [Suggestion] stands, non-blocking, and now covers only rounds 6-7: review 5341713976, its F15 thread, ACK 5874296059, its dismissal at 16:43:16Z, and this round. The loop's #2347 close-out records them.

Findings
None new.

Checked, no finding

  • PR-REVIEW.md has no last-updated-utc. All threads except F15's are resolved.
  • 44 commits: all Conventional and unique; the new one has [#2347], no body and no trailers. The title is unchanged. The three-dot diff is 32 files, +2709/−53. The PR body is byte-identical to round 6.

This approves this head.

Orchestrator's server checks (hub, at 30f7419c4 on develop 49d94c414, 2026-09-28T16:47Z): the pre-commit profile passes (pre-commit.sh --format=json status pass, exit 0, 118 s; clippy-allow-reasons --base-ref 49d94c414 exit 0; worktree unchanged); frontmatter-validator --all exits 1 with exactly the counts develop has (35 legacy-shape errors and 4 warnings on unrelated closed specs) and no record for any file this PR adds or edits. Recomputed at posting: the F14 row's Source URL is the F14 thread's first comment (15:10:09Z) and its Reply URL is the maintainer's reply on that thread (16:26:09Z). CI at this head when posting: 10 checks finished (all success or skipped), 7 running, none failed.

@da2ce7

da2ce7 commented Sep 28, 2026

Copy link
Copy Markdown
Contributor

ACK 30f7419 — the commit records review rounds 4 and 5 in the PR #2363 audit (the F14 row and detail, the Round 4/5 paragraph, three log entries) and the #2347 spec, each checked against the posted reviews and replies

@josecelano
josecelano dismissed stale reviews from da2ce7, da2ce7, da2ce7, and da2ce7 September 28, 2026 16:54

All findings from this round are fixed and their threads resolved. The reviewer approved d5bb52f in round 6 (review 5341713976) and ACKed it. The only later commit records review rounds 4 and 5 in the PR #2363 audit.

@josecelano

Copy link
Copy Markdown
Member Author

ACK 30f7419

@josecelano
josecelano merged commit bc90cde into torrust:develop Sep 28, 2026
20 checks passed
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Sep 28, 2026
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Sep 28, 2026
…th the close-out

The close-out changed the F5, F6, F9 (PR torrust#2300), F8, F10 (PR torrust#2313) and F28, F29 (PR torrust#2320) rows to their resolved states, but the narrative paragraph under each table still described the pre-merge state, saying the fixed findings stay FOLLOW_UP/OPEN until PR torrust#2363 merges. Each paragraph now states the recorded state: PR torrust#2363 merged on 2026-09-28, the fixed findings are FIXED/RESOLVED, the NO_ACTION threads are resolved in the close-out, and the remaining FOLLOW_UP items keep their owners.

Copilot review on the close-out pull request, threads on the three audits.
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Sep 28, 2026
…ing log and fix three log entries

The PR torrust#2363 audit logged round 7 inside the 17:00 merge entry, after the 16:53 entry, although its review and ACK were posted at 16:50, and it had no entry for the dismissal of the four CHANGES_REQUESTED reviews at 16:54 that cleared the last blocking reviews before the merge. Round 7 now has its own 16:50 entry, a 16:54 entry records the dismissals, the 17:00 entry keeps only the merge, and the Round 6 paragraph and the F15 detail follow the same order, so the log is chronological through the close-out.

Three close-out log entries in the PR torrust#2293, torrust#2313 and torrust#2320 audits lose a stray comma and a plural that described a single finding.

Maintainer review on the close-out pull request, findings F2, F3 and F4.
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
…th the close-out

The close-out changed the F5, F6, F9 (PR torrust#2300), F8, F10 (PR torrust#2313) and F28, F29 (PR torrust#2320) rows to their resolved states, but the narrative paragraph under each table still described the pre-merge state, saying the fixed findings stay FOLLOW_UP/OPEN until PR torrust#2363 merges. Each paragraph now states the recorded state: PR torrust#2363 merged on 2026-09-28, the fixed findings are FIXED/RESOLVED, the NO_ACTION threads are resolved in the close-out, and the remaining FOLLOW_UP items keep their owners.

Copilot review on the close-out pull request, threads on the three audits.
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
…ing log and fix three log entries

The PR torrust#2363 audit logged round 7 inside the 17:00 merge entry, after the 16:53 entry, although its review and ACK were posted at 16:50, and it had no entry for the dismissal of the four CHANGES_REQUESTED reviews at 16:54 that cleared the last blocking reviews before the merge. Round 7 now has its own 16:50 entry, a 16:54 entry records the dismissals, the 17:00 entry keeps only the merge, and the Round 6 paragraph and the F15 detail follow the same order, so the log is chronological through the close-out.

Three close-out log entries in the PR torrust#2293, torrust#2313 and torrust#2320 audits lose a stray comma and a plural that described a single finding.

Maintainer review on the close-out pull request, findings F2, F3 and F4.
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
…th the close-out

The close-out changed the F5, F6, F9 (PR torrust#2300), F8, F10 (PR torrust#2313) and F28, F29 (PR torrust#2320) rows to their resolved states, but the narrative paragraph under each table still described the pre-merge state, saying the fixed findings stay FOLLOW_UP/OPEN until PR torrust#2363 merges. Each paragraph now states the recorded state: PR torrust#2363 merged on 2026-09-28, the fixed findings are FIXED/RESOLVED, the NO_ACTION threads are resolved in the close-out, and the remaining FOLLOW_UP items keep their owners.

Copilot review on the close-out pull request, threads on the three audits.
da2ce7 added a commit to da2ce7/torrust-tracker that referenced this pull request Oct 6, 2026
…ing log and fix three log entries

The PR torrust#2363 audit logged round 7 inside the 17:00 merge entry, after the 16:53 entry, although its review and ACK were posted at 16:50, and it had no entry for the dismissal of the four CHANGES_REQUESTED reviews at 16:54 that cleared the last blocking reviews before the merge. Round 7 now has its own 16:50 entry, a 16:54 entry records the dismissals, the 17:00 entry keeps only the merge, and the Round 6 paragraph and the F15 detail follow the same order, so the log is chronological through the close-out.

Three close-out log entries in the PR torrust#2293, torrust#2313 and torrust#2320 audits lose a stray comma and a plural that described a single finding.

Maintainer review on the close-out pull request, findings F2, F3 and F4.
da2ce7 added a commit that referenced this pull request Oct 6, 2026
…e of five merged PRs

e233bf8 docs(pr-reviews): [#2347] complete the PR #2363 processing log and fix three log entries (Cameron Garnham)
bfbcf13 docs(pr-reviews): [#2347] align three post-merge narratives with the close-out (Cameron Garnham)
5c6aae4 docs(pr-reviews): [#2347] record the close-out pull request in the PR #2363 audit (Cameron Garnham)
663aad9 docs(pr-reviews): [#2347] close out the post-merge triage of five merged PRs (Cameron Garnham)

Pull request description:

  Closes the loop on the 32 findings posted after PRs #2290, #2293, #2300, #2313, and #2320 merged, now that their follow-up PR #2363 is on `develop`, and records the last review rounds of PR #2363.

  The thread replies and resolutions were the maintainer's (josecelano, 17:07 UTC, and 16:53 UTC for PR #2363 F15); this PR records them.

  **Summary**

  - The 13 findings that PR #2363 fixed are `FIXED`/`RESOLVED` in their audits. Each cites its fixing commit subject, and its Reply URL is the maintainer's T7 reply.
  - The 9 `NO_ACTION` findings are `RESOLVED`, keeping their disposition replies.
  - The 9 `FOLLOW_UP` findings stay `FOLLOW_UP`/`OPEN`. Their disposition replies name the owners: #2360, #2361, #2301, #2278 order 8, and #2362.
  - The PR #2363 audit gains:
    - F15, which this commit fixes, with the maintainer's reply as its Reply URL;
    - the Round 6 paragraph;
    - Processing Log entries for rounds 6-7, the merge and this close-out;
    - the maintainer's post-merge approval for recording F15 (#2347 (comment)) as its approval reference.
  - The #2347 spec marks T6 and T7 `DONE` and AC4 `DONE`, and records M2.

  **Files touched**

  - `docs/pr-reviews/pr-2290-review/PR-REVIEW.md`
  - `docs/pr-reviews/pr-2293-review/PR-REVIEW.md`
  - `docs/pr-reviews/pr-2300-review/PR-REVIEW.md`
  - `docs/pr-reviews/pr-2313-review/PR-REVIEW.md`
  - `docs/pr-reviews/pr-2320-review/PR-REVIEW.md`
  - `docs/pr-reviews/pr-2363-review/PR-REVIEW.md`
  - `docs/issues/open/2347-2003-triage-post-merge-review-findings/ISSUE.md`
  - `docs/issues/open/2347-2003-triage-post-merge-review-findings/manual-verification-evidence.md`

  **Validation**

  - Pre-commit profile on the compute hub at this head, base `develop` `bc90cde1b`: `pre-commit.sh --format=json` status `pass`, exit 0, 74 s; `clippy-allow-reasons --base-ref bc90cde` exit 0; worktree unchanged after the run (2026-09-28 17:41 UTC).
  - `frontmatter-validator --all` at this head: exit 1 with exactly the counts `develop` has (35 `legacy-shape` errors and 4 warnings on unrelated closed specs) and no record for the #2347 folder or any audit this PR edits.
  - `validate-audit-record.py`, run offline against thread captures of 2026-09-28 17:19 UTC: #2290 exit 0 (7 rows), #2293 exit 0 (8), #2300 exit 0 (12), #2313 exit 0 (10), #2320 exit 0 (29); #2363 parsed 15 rows and reported only F15's resolution reference, which is this PR's own commit subject and resolves on this branch. The source-review check needs review ids the captures do not carry, so the maintainer's run with `gh` is the one of record.
  - M2 (GraphQL `reviewThreads`, 2026-09-28 17:19 UTC): #2290 10 threads, 1 unresolved (F4, #2360); #2293 16, 2 (F1, #2361; F5, #2301); #2300 12, 1 (F10, #2278 order 8); #2313 10, 5 (F4, F5, F6, F7, F9, #2362); #2320 29, 0; #2363 15, 0. The unresolved set is exactly the 9 `FOLLOW_UP` threads.

  Related to #2347. Closing #2347 and archiving its spec follow as a separate step: `cleanup-completed-issues` archives only the spec of an issue that is closed.

ACKs for top commit:
  da2ce7:
    ACK e233bf8 — the four close-out commits rebased onto develop at 693162b unchanged (range-diff four `=` against the previous tip, which was itself four `=` against the tip the maintainer ACKed), the six review threads answered and resolved, the one open thread (the commit-policy wording) answered as intentional

Tree-SHA512: 6f407ef2bf216f52153a931c44642d8302399f06c88fc4a39982563357a2d66a94f9a677643048340c6f62b6a7333420c26263eb8600154e632a577d86142d9a
josecelano added a commit that referenced this pull request Nov 21, 2026
…he strict ACK after audit-only commits

d56a1c9 docs(pr-reviews): [#2949] record PR #2950 review round 10 (josecelano-bot)
0a4bfef docs(pr-reviews): [#2949] use a supported category for F28 in the PR #2950 audit (josecelano-bot)
3568d15 docs(pr-reviews): [#2949] record PR #2950 review round 9 (josecelano-bot)
090f43d docs(pr-reviews): [#2949] say which audit rows verify text the D1 rewrite removed (josecelano-bot)
b5e1197 docs(issues): [#2949] add the T6 row to Commit Points (josecelano-bot)
163e745 docs(pr-reviews): [#2949] record PR #2950 review round 8 (josecelano-bot)
cd6a2bc docs(issues): [#2949] link the comment that announces the D1 decision (josecelano-bot)
25914a3 docs(issues): [#2949] update EPIC row 24 for the strict-ACK decision (josecelano-bot)
527da28 docs(issues): [#2949] record the decision to keep the strict ACK (josecelano-bot)
eb07319 docs(pr-reviews): [#2949] record PR #2950 review round 7 (josecelano-bot)
1df580f docs(issues): [#2949] correct the 08:20 log entries about what said "proposed" (josecelano-bot)
5cd4871 docs(issues): [#2949] keep the manual runs of M1 to M5 alongside the merge-tool tests (josecelano-bot)
01f1a95 docs(issues): [#2949] specify the merge tool's Git-history step and its failures for D2 (b) (josecelano-bot)
5942048 docs(pr-reviews): [#2949] record PR #2950 review round 6 (josecelano-bot)
ed0d184 docs(pr-reviews): [#2949] record PR #2950 review round 5 (josecelano-bot)
d3861da docs(issues): [#2949] log the in-place rewording of the 07:39 and 07:40 entries (josecelano-bot)
a58d4f6 docs(issues): [#2949] spell behavior one way in the specification (josecelano-bot)
86ae152 docs(pr-reviews): [#2949] record Copilot's two body findings as non-resolvable rows (josecelano-bot)
235806b docs(issues): [#2949] describe the 2026-11-18 decision one way in the spec and EPIC (josecelano-bot)
33cffcc docs(pr-reviews): [#2949] record PR #2950 review round 4 (josecelano-bot)
69755e3 docs(pr-reviews): [#2949] record Copilot's Medium label for F3 and F4 as Minor (josecelano-bot)
cf8116f docs(pr-reviews): [#2949] collapse the findings table padding so the validator parses it (josecelano-bot)
f1719d2 docs(issues): [#2949] add the test-development loop to Commit Points for T5 (josecelano-bot)
ba4b1b1 docs(issues): [#2949] say the rule was proposed and reopened under D1, not decided (josecelano-bot)
c1a7aa8 docs(issues): [#2949] show the folder match with paths that tell the forms apart (josecelano-bot)
26ded3d docs(issues): [#2949] check every commit after the ACK, not only the two ends (josecelano-bot)
5f9aa0c docs(pr-reviews): [#2949] record PR #2950 review round 3 (josecelano-bot)
70d2248 docs(issues): [#2949] state the audit-folder match as an exact prefix with its trailing slash (josecelano-bot)
b652375 docs(issues): [#2949] cite skill sections instead of line numbers in the checked facts (josecelano-bot)
2ed4fb9 docs(pr-reviews): [#2949] record PR #2950 review round 2 (josecelano-bot)
8643d3d docs(issues): [#2949] map the regression test cases to M1 to M4 one by one (josecelano-bot)
0041f9c docs(pr-reviews): [#2949] record PR #2950 review round 1 (josecelano-bot)
5c52475 docs(issues): [#2949] name the merge-tool tests in the regression test strategy (josecelano-bot)
018e1d3 docs(issues): [#2949] require --no-renames in the ACK check command (josecelano-bot)
30312e8 docs(pr-reviews): [#2949] add the PR #2950 review audit record (josecelano-bot)
9316b82 docs(issues): [#2949] compare da2ce7's metadata-branch alternative under D1 (josecelano-bot)
a799b0d docs(issues): add issue specification for #2949 (josecelano-bot)

Pull request description:

  Related to #2949

  ## Summary

  Spec-only pull request. It adds the specification of #2949, which is now the record of a decision: the strict ACK stays. An `ACK <hash>` counts only on the commit it names. After a commit that changes only the pull request's own audit record, the reviewer and the maintainer ACK the new head.

  The issue first proposed the opposite, a rule that keeps an ACK valid after audit-only commits. The maintainer (@josecelano) decided against it on 2026-11-19. No skill, tool or workflow changes here; a small implementation pull request follows after this one merges.

  ## What it contains

  - `docs/issues/open/2949-2003-keep-reviewer-ack-after-audit-only-commits/ISSUE.md`: the specification. It records the decision and its reasons, the four alternatives that were rejected (the rule, audit records after merge, da2ce7's metadata branch, and empty commits), and the remaining work.
  - `docs/issues/open/2003-overhaul-guardrails-and-automation/EPIC.md`: row 24 for this sub-issue and its progress-log lines.
  - `docs/pr-reviews/pr-2950-review/PR-REVIEW.md`: this pull request's review audit record.

  ## The decision

  D1, decided by the maintainer on 2026-11-19: the audit record stays on the pull request branch and the ACK stays strict. His reasons: the re-ACK after an audit-only commit is cheap, the sequence of finding, audit commit and new ACK is history worth keeping, every alternative adds more complexity than the pain it removes, and the process must stay easy for external contributors.

  D2 to D5 were questions about the rule and no longer apply.

  ## Remaining work (not in this pull request)

  Skill text only, in one small follow-up pull request for #2949:

  - `merge-pull-request`, Merge Readiness: an audit-only commit needs new ACKs, with the command that lists what the commits after the earlier ACK changed (`git log --no-renames --diff-merges=first-parent --name-only --format= X..H`). The waiver sentence no longer asks for a record in the review audit.
  - `wait-for-pr-review`, step 4: a pointer to that text.
  - `process-pr-review`: the author keeps the audit commit, tells the maintainer the head needs new ACKs, and never rewrites history to protect an ACK.
  - A note on the #2363 line of `EPIC.md`.

  The merge tool does not change.

  ## Verification

  - `linter markdown` and `linter cspell`: passed. The specification was formatted with prettier 3.9.10 (table alignment only).
  - The pre-commit hook (including `linter all` and the frontmatter check) passed on each commit.
  - No file in the diff cites a commit outside `develop`; the commits of PR 2947 that the specification cites are on `develop`.

  ## Known gap

  Issue 2949 is not yet linked as a GitHub sub-issue of EPIC 2003: the contributor account cannot link sub-issues. A maintainer needs to link it.

  ## Note on this pull request's own ACK

  The decision applies here: each audit commit on this branch needs a new ACK on the new head.

  🤖 Generated with [Claude Code](https://claude.com/claude-code)

ACKs for top commit:
  josecelano:
    ACK d56a1c9
  da2ce7:
    ACK d56a1c9 — the description's closing keyword is gone and every one of the 28 review threads has a reply, an audit row and a resolution, with the validator logic passing on 30 rows at this head

Tree-SHA512: c4bc495dbed5829da456941b57527245698579032415bdca281fa5eb11314fab286b3b02d9d1279dc0d6cc2cf67b5e7c1dee89d1617bff96c5689740deb8ac03
josecelano-bot added a commit to josecelano-bot/torrust-tracker that referenced this pull request Nov 21, 2026
…he ACK rule on the EPIC's torrust#2363 line

Co-Authored-By: Claude Fable 5.2 <[email protected]>
josecelano pushed a commit that referenced this pull request Nov 22, 2026
josecelano added a commit that referenced this pull request Nov 22, 2026
…-only commit

ec5dc10 docs(pr-reviews): [#2949] record PR #2989 review round 3 (josecelano-bot)
8a916f7 docs(pr-reviews): [#2949] correct two verification lines in the PR #2989 audit record (josecelano-bot)
f40b5b1 docs(pr-reviews): [#2949] add the row for F5 to the PR #2989 audit record (josecelano-bot)
55a5540 docs(pr-reviews): [#2949] record PR #2989 review round 2 with the review that round 1 missed (josecelano-bot)
4a26272 docs(wait-for-pr-review): [#2949] link the exit condition straight to the ACK subsection (josecelano-bot)
bc93f73 docs(issues): [#2949] keep the approval dismissal apart from the ACK rule on the EPIC's #2363 line (josecelano-bot)
c3369ae docs(pr-reviews): [#2949] add the PR #2989 review audit record with round 1 (josecelano-bot)
9ca11dd docs(issues): [#2949] record the implementation pull request in the specification (josecelano-bot)
21bb0f3 docs(issues): [#2949] keep the artifact line of the evidence inside its list item (josecelano-bot)
140ab17 docs(issues): [#2949] record the implementation progress and the manual verification evidence (josecelano-bot)
bd5f589 docs(issues): [#2949] name the strict-ACK decision on the EPIC's #2363 line (josecelano-bot)
d8d531d docs(process-pr-review): [#2949] keep the audit commit when it makes an ACK stale (josecelano-bot)
d8ca384 docs(wait-for-pr-review): [#2949] point the exit condition to the stale-ACK text (josecelano-bot)
f34fa50 docs(merge-pull-request): [#2949] say an ACK names one commit and how to re-check after an audit-only commit (josecelano-bot)

Pull request description:

  Closes #2949

  ## Summary

  Implements #2949, whose specification merged with PR 2950. The maintainer decided there to keep the strict ACK: an `ACK <hash>` counts only on the commit it names, and after a commit that changes only the pull request's own audit record, the reviewer and the maintainer ACK the new head. This pull request puts that into the skills. It is skill text and documentation only; the merge tool does not change.

  ## What changes

  - `.claude/skills/merge-pull-request/SKILL.md` (version 1.3): new section "An ACK Names One Commit" under Merge Readiness. It says every later commit makes an ACK stale, including an audit-only commit, and gives the command that lists what the commits after the earlier ACK changed (`git log --no-renames --diff-merges=first-parent --name-only --format= <X>..<H>`), so the second review is short. The Reviewer ACK item links to it, and the waiver sentence no longer asks for a record in the review audit: the durable comment on the pull request is the record, and a waiver written into the audit would move the head once more.
  - `.claude/skills/wait-for-pr-review/SKILL.md` (version 1.4): step 4 of the review loop points to that section, with no second wording of it.
  - `.claude/skills/process-pr-review/SKILL.md` (version 1.10): step 9 says that an audit commit pushed after an ACK makes it stale, that the author keeps the commit and tells the maintainer the head needs new ACKs, and that an author never rewrites history or holds back the audit record to protect an ACK.
  - `docs/issues/open/2003-overhaul-guardrails-and-automation/EPIC.md`: the line of the historical plan for issue 2347 about PR 2363 names this decision; row 24 is `IN_PROGRESS`, with a progress-log line.
  - `docs/issues/open/2949-2003-keep-reviewer-ack-after-audit-only-commits/ISSUE.md`: tasks T2 to T5 done, acceptance evidence, a link to da2ce7's agreement with the decision (PR 2950, comment 7032739700), `related-pr: 2989`, and the progress log.
  - `docs/issues/open/2949-2003-keep-reviewer-ack-after-audit-only-commits/manual-verification-evidence.md`: the two manual scenarios.
  - `docs/pr-reviews/pr-2989-review/PR-REVIEW.md`: this pull request's review audit record.

  ## Verification

  - `linter all` and the rest of the pre-commit hook passed on every commit; the pre-push checks passed at the push.
  - Manual scenario M1: on the history of PR 2947, the documented command with `e01212151..1d27a67` lists only `docs/pr-reviews/pr-2947-review/PR-REVIEW.md`.
  - Manual scenario M2: on a range of the history of PR 2950 (`eb07319da..163e745`), it lists the specification and the EPIC as well as the audit record.
  - Both ranges are on `develop`; no file in the diff cites a commit outside `develop`.
  - No tests apply: no code changes.

  ## After merge

  The issue's specification stays in `docs/issues/open/` in this pull request. Archiving it to `docs/issues/closed/` and setting EPIC row 24 to `DONE` follow in a separate pull request once the issue is closed.

  ## Known gap

  Issue 2949 is not linked as a GitHub sub-issue of EPIC 2003: the contributor account cannot link sub-issues. A maintainer needs to link it.

  🤖 Generated with [Claude Code](https://claude.com/claude-code)

ACKs for top commit:
  da2ce7:
    ACK ec5dc10 — all eight threads have a reply, an audit row and a resolution, the validator logic passes on its eight rows, and the commits since the last ACK change only the audit record
  josecelano:
    ACK ec5dc10

Tree-SHA512: 72500817499a12bac616f4eb42f09332b439f43ac5790959c55e0b4b887a5a2627c4ec2a5aa6d61610bce95a3cd0f979243523aae317268838660d3ad3838b08

This branch was previously deployed

1 inactive deployment
coverage — 30f7419c Deployed Sep 28, 2026 by josecelano via Generate Coverage Report #2358
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants