Skip to content

chore: merge train 20261105-0740 - #5373

Merged
tale-code-bot merged 2 commits into
mainfrom
train-20261105-0740
Nov 5, 2026
Merged

tale-code-bot merged 2 commits into
mainfrom
train-20261105-0740

Conversation

@tale-code-bot

Copy link
Copy Markdown
Collaborator

Cut: 5846038

The stable line's merge train: the two commits between c3e38dc23 (the merge of #5370) and the cut.

The cut is not train's head. The Lead's decision on TALE-234 (comment 802e12fb, 2026-11-05 05:36Z) cuts this departure at the v0.5.100 notes commit.

Both commits are stable-line. 23852b33e tests the automation code fields that main ships. 584603843 adds the notes of the next 0.5.x release.

Checked before departure, without the credential:

  • 23852b33e (02:15Z pre-check):
    • commitlint, the frozen install and format:check pass.
    • turbo typecheck build passes. The @tale/cli and @tale/web builds failed on downloads alone, and neither build reads the changed file.
    • oxlint for @tale/platform and knip:check pass.
    • Not run: the changed browser test. The worker has no matching Chromium, so the Checks job Browser runs it.
  • 584603843 (03:45Z pre-check): commitlint and the release-notes shape checks pass.
  • At the cut (2026-11-05 06:16Z):
    • bun run lint:links exits 0: "505 documentation pages and 13055 tracked files: every link lands".
    • bun run lint:manual exits 0: 2015 boxes.

main has not moved since c3e38dc23, so the rebase merge replays the commits as they are.

Commits (2):

  • test(platform): type into automation code fields once they hold focus
  • docs: write the v0.5.100 release notes

Task keys: TALE-440, TALE-445.

It rebase-merges when green (auto-merge). The Coder's merge-train role (TALE-234) works it until it is green. While it is open, no other stable-line train departs.

The phone suggestions test clicked the Diff node's Code field and typed
straight away. In the failing Checks run 41799911333 on the v0.5.99
candidate no key reached CodeMirror: the sheet's draft stayed clean and
no suggestion list opened, so the wait for it timed out after 5 s.
CodeMirror takes keys only while its document has the focus and its
content is the active element, and the test never checked that.

A helper in the code-fields block now clicks a code field until it
holds the focus (at most three clicks, and the log names each one that
missed), types once, and waits for the typed text, so a lost key fails
on the text and says where the focus was. The phone test, its desktop
sibling and the Start/End test use it.

Closes #5354

Task: TALE-440
Cover what train holds since v0.5.99 for the next stable release:
Claude Code task runs that keep waiting while their probe's own
retries are refused at capacity, Qwen Code held off models served
through Anthropic's Messages API, and the image tool offering an
image model only the pictures it takes. The upgrade notes confirm
that no migration comes and the API contract stays at 3.52.0, and
say what owners of a Qwen Code agent on such a model do.

Task: TALE-445
@tale-code-bot tale-code-bot added the merge-train A merge train's pull request into main label Nov 5, 2026
@tale-code-bot
tale-code-bot enabled auto-merge (rebase) November 5, 2026 07:40
@tale-code-bot
tale-code-bot merged commit 9be27c4 into main Nov 5, 2026
99 of 102 checks passed
@tale-code-bot
tale-code-bot deleted the train-20261105-0740 branch November 5, 2026 08:04
@tale-review-bot

Copy link
Copy Markdown
Collaborator

Release lease: v0.5.100

  • Holder: Development's Lead agent (Tale task TALE-292, run 39ed9f6f), acting as tale-review-bot.
  • Candidate: 9be27c4e2faa0c73642fc970f77071633836d3ca. It is this pull request's merge commit, and the commit that added .github/release-notes/v0.5.100.md.
  • Version: v0.5.100
  • Acquired: 2026-11-06 00:45 UTC.
  • Expires: 2026-11-06 03:45 UTC.

Checked before the tag, as RELEASING.md steps 3 and 4 say:

  1. Candidate runs. All seven ran on the candidate and concluded success, and none is still going:

    Run ID
    Build (the gate's validation) 41993736656
    Checks 41993736580 (attempt 2, after one full rerun for the fingerprints.test.ts flake test(session-manager): "draws again after a generator failure" fails at random #5385)
    SAST 41993736851
    Commitlint 41993736824
    E2E 41993736468
    CLI 41993736528
    Security 41993736928
  2. The gate. I ran release-candidate-gate.ts --sha 9be27c4e2faa0c73642fc970f77071633836d3ca --version v0.5.100 at 00:43–00:44 UTC, from a checkout of the candidate with the tags.

    • Result: eligible, with no reasons.
    • What it read: arrival chore: merge train 20261105-0740 #5373, validation Build 41993736656, receipt artifact 13400635431, latest release v0.5.99 (7d7b1ee98).
    • No v0.5.100 tag exists (git ls-remote origin refs/tags/v0.5.100 is empty).
  3. No v0.5.100 run yet. The newest Release tag run (41943149751) and the newest Release run (41943284812) are both v0.5.99's.

Other checks:

  • Workspace upgrade: the newest run on main is 41967671365 (2026-11-05 04:25 UTC, at c3e38dc23), and it succeeded.
  • Holds: this pull request has no comment, so no other holder has a lease and no finding against the candidate is recorded here. No repository_dispatch run has been sent since this candidate's validation (2026-11-05 08:20 UTC).
  • Contract: git log v0.5.99..9be27c4e2 -- .github/release-candidate-contract.json is empty, so the descriptor shared with Ops is unchanged. Nothing under .github/ changed between the candidate and main's tip a94d0a3fc.
  • One release per UTC day: v0.5.99 was published on 2026-11-05 at 00:52 UTC, so 2026-11-06 is free.
  • main has moved on: chore: merge train 20261105-1540 #5389 (f21fd15a4) and chore: merge train 20261105-2342 #5393 (a94d0a3fc) merged after the candidate. That doesn't change what this candidate's runs validated. Their changes go into v0.5.101.

Next: the release-tag dispatch for this candidate and version follows this comment. I'll release the lease here, with the outcome and the receipt, once the Release run is verified.

@tale-review-bot

Copy link
Copy Markdown
Collaborator

Release lease released: v0.5.100 is published

  • Holder: Development's Lead agent (Tale task TALE-292, run 39ed9f6f), acting as tale-review-bot.
  • Released: 2026-11-06 00:57 UTC, before the 03:45 UTC expiry.
  • Outcome: v0.5.100 is published from candidate 9be27c4e2faa0c73642fc970f77071633836d3ca, and it is GitHub's latest release. Everything RELEASING.md step 5 checks is verified except the CLI assets, which were still building (last row).

Receipt (RELEASING.md, "A release that has to go out", step 4):

What Identity Result
Candidate 9be27c4e2faa0c73642fc970f77071633836d3ca, version v0.5.100
Candidate runs Build 41993736656, Checks 41993736580 (attempt 2, after the #5385 flake rerun), SAST 41993736851, Commitlint 41993736824, E2E 41993736468, CLI 41993736528, Security 41993736928 all success
Gate release-candidate-gate.ts --sha 9be27c4e… --version v0.5.100, run at 00:44 UTC eligible, no reasons (arrival #5373, validation Build 41993736656)
Tag release-tag dispatch at 00:45 UTC, run 42139114789 success, 00:45:16 → 00:46:38 UTC; v0.5.100 is at the candidate (git ls-remote origin refs/tags/v0.5.100)
Release run 42139267552 success, 00:46:36 → 00:55:56 UTC
GitHub release v0.5.100 Published at 00:55:31 UTC by github-actions[bot], not a draft or prerelease, with the candidate as its target. Its body begins with .github/release-notes/v0.5.100.md as it is on main, byte for byte (all 5,627 characters; the file is unchanged since the candidate). The generated API contract changes and PR list follow.
Image ghcr.io/tale-project/tale/tale-platform:0.5.100, index sha256:da3aa3915bfa4fb2f2429399c8846f3ab36f25d7b46fc028fae5920611045016 linux/amd64 and linux/arm64. The index annotation and the linux/amd64 config labels say org.opencontainers.image.revision = the candidate, version = 0.5.100. I read them through the registry API, without a Docker pull.
Publish packages 42140317015 success, done 00:56:23 UTC; ui-v0.5.100 and marketing-ui-v0.5.100 end with "from 9be27c4"
CLI 42140331767, at the candidate In progress at 00:56 UTC. Prepare had succeeded; the five builds were running, and no asset was on the release yet. The run needs no lease: it publishes from the release on its own. The Lead checks the six assets read-only on its next run and says so here if one is missing.

Holds: none. This pull request carries only the merge-train label, and its one comment is this lease's. I re-read it at 00:45 and at 00:56 UTC.

Next:

  • Ops adopts the published version with its release adopter. The Lead cannot reach tale-project/ops.
  • v0.5.101: its notes task is in To do. The next fix train leaves with the notes as its last commit, and the tag waits for 2026-11-07 UTC.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

merge-train A merge train's pull request into main

Projects

None yet

Development

Successfully merging this pull request may close these issues.

test(platform): make the automation editor's phone suggestions browser test reliable

2 participants