Repository navigation
Open
Labels
agent-readyMaintainer-approved for the Tale agent fleetepicTracking epic spanning multiple issuesfeatNew featurepriority: highHigh priority
Description
Summary
Tale ships from main several times a day: 40 releases in three weeks, from v0.5.52 on 2026-09-24 to v0.5.91 on 2026-10-15. Every release can change behavior and UI. Organizations that run acceptance tests, train their users or sign off a version need a release line that only gets bug and security fixes, without new features, UI changes or migrations they did not ask for, while main keeps moving. Pilot organizations have asked whether they must keep preparing for larger changes with every update.
What the release process assumes today
From .github/RELEASING.md at main a71d0d92e9:
- A release candidate must be a commit on
mainthat contains and goes beyond the latest release, and its version must be newer (:33-39). The gate answersconflictfor anything else (:130,:138-140). - Every release writes
:X.Y.Zand:latestimage tags in one call (:258-259). Ops identifies a deployment by its source commit (:35-36) and adopts releases with its release adopter (:376-379; "Source contract shared with Ops",:479). - The release-candidate workflows validate only commits on
main.
Decisions to take first
- Versioning. For example, cut LTS line
0.6from a release (v0.6.0) and ship patchesv0.6.1,v0.6.2, … fromlts/0.6, whilemaincontinues with0.7.x. Or choose another scheme. - Cadence and support window. How often a line is cut, how long it gets fixes, and how long two lines overlap.
- What qualifies. Bugs with user impact, security fixes, data loss and compliance fixes. No features and no UI changes, and schema migrations only when a fix needs one.
- Ownership. Who approves a backport, and how fast security fixes must land on the line.
Work (can run in parallel once the decisions are taken)
- Branches and backports. Protected
lts/X.Ybranches. Abackport: lts/X.Ylabel opens a cherry-pick PR automatically, and CI runs on those branches. - Release gate and workflows. Accept candidates on
lts/*, with version progression inside the line, validated by the same seven workflows. Never move:latest. Publish:X.Y.Z,:X.Yand:ltsimage tags, with release notes for every patch. - Upgrades. An LTS patch upgrades in place. Moving from one LTS line to the next, and from an LTS line back to
mainreleases, have tested migration paths. - CLI and Ops. Pick a channel (
latestorlts) per deployment. Show the channel and the line in the app (Settings › Deployment) and in What's new. Ops adopts LTS patches through the release adopter intale-project/ops. - Docs. A support policy page (lines, windows, what gets backported), and an LTS upgrade guide.
Done when
- The first LTS line is cut, and one bug fix is backported and released through the gate as an LTS patch, without moving
:latest. - A deployment on the LTS channel upgrades to that patch.
- The support policy is published.
Metadata
Metadata
Assignees
Labels
agent-readyMaintainer-approved for the Tale agent fleetepicTracking epic spanning multiple issuesfeatNew featurepriority: highHigh priority
Activity
yannickmonney commentedon Nov 14, 2026
Decision
The LTS line is the previous stable line, kept alive as a maintenance branch
release/X.Y. This extends the two-line model of #5144; there is nolts/scheme. At the 0.6.0 promotion:release/0.5is cut from the last v0.5.x tag and becomes the first maintenance line;maintakes 0.6;release/0.7opens as the feature line.Patches ship as v0.5.N+1 from
release/0.5.Answers
release/X.Y. Images get:X.Y.Zand a moving:X.Y.:latestmoves only for the highest stable version. There is no:ltstag.main. A guard enforces this.main, never a train pull request. A maintainer or triage labels a squash-merged PRbackport release/X.Y, or dispatches the backport workflow with the task commits. A bot opens thecherry-pick -xPR, and a human maintainer approves and merges it after the nine CI ready checks pass. A guard checks every commit on a maintenance line for the cherry-pick trailer. Critical or high security fixes ship on every supported line within 7 days. Embargoed ones are prepared in a private advisory fork and land onmainand every line together. Other backports wait no longer than 30 days.--versionto cross lines, and that rule stays. Ops cohorts each declare a line. The CLI and the app show the line's status and EOL from a support manifest, with a copy embedded at build time as the fallback.Rationale
This reuses what already exists: the release lines, CI for
release/**(#5143), the release-latest rule, the gate and the CLI's line pinning.Train PRs carry many tasks, so backports are picked per commit. Upstream-first is enforced by a guard, and the private advisory path reconciles it with embargoes. The migration rule keeps the migrator's filename order safe across lines. The minimum gap between promotions is what actually caps the work at two maintenance lines. Validation stays on
main's workflow definitions, and a scheduled run against each open line catches an incompatibility before a patch is urgent.Implementation units
:X.Ytags, the manifest as a release asset, and a scheduled validation run against each open line (main).release/0.5at the 0.6.0 promotion and ship the first LTS patch without moving:latest.