Skip to content

ci: Backend integration hangs in lane 49 (checkBellHintWire), then waits out the 30-minute step timeout #4112

Closed

Description

@yannickmonney

The Backend integration job sometimes hangs in lane 49 of 217, checkBellHintWire. The run is then truncated, but the job doesn't end: it waits out the 30-minute step timeout, and the 168 later lanes never run. This has happened on four unrelated PRs in two days.

Occurrences

Each row is read from the job log.

Run / job PR at head Lane line Step timeout
36957300132 / 110694963501 #4064 at 21455bfa2 No lane guard yet. The last PASS was at 03:43:51Z, then nothing 2026-10-02 04:12:00Z
37056656989 / 111003756345 #4094 at b31052865 20:06:59Z FAIL harness: checkBellHintWire runs to completion — RUN TRUNCATED at lane 49 of 217 (checkBellHintWire) — 168 later lane(s) never ran; threw Error: lane 49 of 217 (checkBellHintWire) did not settle within 10 min 2026-10-02 20:25:08Z
37086605668 / 111098149737 #4097 at c863a0c54 01:48:48Z, the same line 2026-10-03 02:06:59Z
37096769608 / 111128211899 #4108 at 2e62a818d 04:44:56Z, the same line 2026-10-03 05:03:08Z

Two defects

  1. The lane can wait forever on an /events SSE read. Under some timing, something in the lane or the stream never settles.
  2. The harness doesn't exit after a truncation. After it prints RUN TRUNCATED, something keeps the process alive, likely the open SSE socket or a timer. It runs about 18 more minutes until the step timeout kills it, with no tally printed.

Cost

Each occurrence costs about 33 runner minutes and blocks the review of an unrelated PR. The cycle's agents can't re-run jobs, so each one also takes the PR's single allowed empty re-run commit.

Acceptance

Related: #4077.

Activity

  1. yannickmonney commented on Oct 3, 2026

    @yannickmonney
    ContributorAuthor

    Two more occurrences, both on PR #4129 (fix/held-blob-cleanup-lanes). Each run truncated at lane 49 of 222 and then timed out the step at 30 minutes. In both, the previous check (collab emitters: creator follows, coalesced status bell, comment bell, pref gate) passed, and the 327 checks before lane 49 match main's run 37113035041.

    Run / job Head Lane line Step timeout
    37116965181 / 111185558771 049fcdf89 10:50:31Z FAIL harness: checkBellHintWire runs to completion — RUN TRUNCATED at lane 49 of 222 (checkBellHintWire) — 173 later lane(s) never ran; … did not settle within 10 min 2026-10-03 11:08:49Z
    37118751583 / 111190580027 e2f0b0556 (an empty re-run commit) 11:23:17Z, the same line 2026-10-03 11:41:34Z

    The lane passes on its own locally on both trees (ITEST_LANES=checkBellHintWire, real Postgres: main a7efe1c51 and e2f0b0556, 17/18, where the one failure is BM25 because pg_search is absent). This PR's single allowed empty re-run commit is now used.

  2. added a commit that references this issue on Oct 3, 2026
    24e6283
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions