You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Release runbook should use actual receipt expiry, not promise 90 days #3971
At source ebf4546fb1455a236c1046f3d73ef78c2e1d0109, .github/RELEASING.md says an expired receipt is after 90 days. Both the Build candidate producer and shared receipt workflow request 90-day retention, but that is not the actual expiry returned for the observed artifact.
That is about 30 days, not a guaranteed 90 days. The reason for the shorter effective retention was not established; do not assume or change repository/organization policy. The release gate already uses actual expiry metadata, so this is a runbook/operational clarity defect rather than a current gate bypass or expired-asset incident.
Acceptance
Describe 90 days as requested retention, with actual artifact expired/expires_at metadata governing validity and the normal gate deciding eligibility. Explain that a missing/expired receipt requires fresh validation under the existing lease/recovery procedure. Sweep corresponding release-receipt documentation for the same unconditional promise. Keep upload settings, access policy and gate behavior unchanged; a small documentation correction with normal relevant checks is sufficient.
Activity
docs: go by a candidate receipt's own expiry, not 90 days