Skip to content

chore(contracts): re-sync copied contracts from SahajCloud - #551

Merged
sydevs-dispatcher[bot] merged 1 commit into
mainfrom
claude/chore-sync-contracts
Nov 27, 2026
Merged

sydevs-dispatcher[bot] merged 1 commit into
mainfrom
claude/chore-sync-contracts

Conversation

@sydevs-dispatcher

Copy link
Copy Markdown
Contributor

Summary

  • Re-syncs this repo's copy of a SahajCloud contract, after feat(translations): the atlas's "N more classes in this area." line SahajCloud#1310 merged.
  • Produced by pnpm run types:cms && curl -fsSL --retry 3 -o src/lib/shape/atlas-url-contract.json https://raw.githubusercontent.com/sydevs/SahajCloud/main/src/lib/atlas/atlas-url-contract.json on main, with no hand edits.

Test results

  • CI runs on this PR. If the new shape breaks this repo, fix-ci adapts the code here, and the adversarial review then reads it.

Notes for reviewer

Opened by the dispatcher contract sync (contractSync in sydevs/claude-workflow loop-config.json), not from a ticket. A later producer merge adds its commit here while this PR is open.

@sydevs-dispatcher

sydevs-dispatcher Bot commented Nov 27, 2026 •

Copy link
Copy Markdown
Contributor Author

🤖 no session running

Written by the sydevs dispatcher. Sessions never edit this comment.

@cloudflare-workers-and-pages

Copy link
Copy Markdown

Deploying with  Cloudflare Workers  Cloudflare Workers

The latest updates on your project. Learn more about integrating Git with Workers.

Status Name Latest Commit Updated (UTC)
✅ Deployment successful!
View logs
sahajatlas-design f31f0ac Nov 27 2026, 10:16 PM

@sydevs-dispatcher
sydevs-dispatcher Bot marked this pull request as ready for review November 27, 2026 22:19
@sydevs-dispatcher

Copy link
Copy Markdown
Contributor Author

Adversarial review skipped: this PR only re-syncs a copied contract. Say @sydevs-bot review to force one.

🤖 sydevs dispatcher

@sydevs-dispatcher sydevs-dispatcher Bot moved this from Pending to Awaiting in SYDevelopers Technical Roadmap Nov 27, 2026
@sydevs-dispatcher
sydevs-dispatcher Bot added this pull request to the merge queue Nov 27, 2026

@github-actions github-actions Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This head was written by the contract sync from main, and the PR changes nothing but the copied contract. Approved by the contract check; the merge queue still runs CI.

Merged via the queue into main with commit 8e0ea1a Nov 27, 2026
22 checks passed
@sydevs-dispatcher
sydevs-dispatcher Bot deleted the claude/chore-sync-contracts branch November 27, 2026 22:24
@sydevs-dispatcher sydevs-dispatcher Bot moved this from Awaiting to Done in SYDevelopers Technical Roadmap Nov 27, 2026
Ardnived added a commit that referenced this pull request Nov 28, 2026
Brings in #520–#551. Resolutions:
- ShareView stays deleted (#540); the inline split's class views are the class and its sign-up,
  and the aside under the map takes the actions, then Register, in #540's order.
- The calendar's width reads #538's `isCalendarFullWidth` off the URL; #466's
  `calendarFillsWidth` goes with Schedule-X.
- MapControls and Mapbox take both `settings` and #542's `filterMenus`; MapLayer passes the
  floating filter buttons, and DrawerStack claims them only for a sheeted stack.
- The root view's new title (#531) is a place's, so inline it gives way to the page heading.
- Main's Event "Layout" control is dropped: the Expanded form shows the phone sheet.
- The panel stays 384px, including FilterMenus' cap; translations re-synced from production.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Development

Successfully merging this pull request may close these issues.

1 participant