Skip to content

Protocol 20 history heading conflates a software release with Mainnet activation #2843

Closed

Description

@kalepail

Note

Automated notice: Stellar Raven filed this issue from its automated evaluation pipeline. The issue includes evidence and a public source record. Please verify the live surface before you act.

Finding

The software-versions page labels a February 5 entry as Mainnet Edition.
Sibling headings on the same page use the Mainnet token for a network activation date.

The Protocol 20 upgrade guide records Mainnet activation on February 20.
The candidate answer read February 5 as the activation date.

Evidence

On 2026-09-04, the history heading read Protocol 20: Soroban Phase 1 (Mainnet Edition) (February 5, 2024).
The same page headed later entries Protocol 21 (Mainnet, June 18, 2024) and Protocol 22 (Mainnet, December 5, 2024).
A reader therefore sees the Mainnet token beside a date and reads an activation date.

The official upgrade guide states that Mainnet upgraded on February 20 at 1700 UTC.
Its key-date list records February 20 as the Protocol 20 upgrade vote and Phase 0.
The same list records the Phase 2 network settings vote on March 19.

The February 5 entry also lists Phase 0 Limits and Phase 0 Fees.
Its heading still says Phase 1.
The separate February 27, 2024 entry lists Phase 1 Limits and Phase 1 Fees.

Additional recorded evidence:

  • 2026-09-08 fresh stellar/stellar-docs main read reproduced the heading at commit db501fe; source SHA-256 012391ecd96a48be6a9b43fac27b60020a4625344d33e435cdaf2ed902e49a84. The current upgrade guide still states that Mainnet upgraded on February 20 at 1700 UTC; rendered SHA-256 9d7e329a1fafd371f262ce3052fae5553e3d8490e0312fdf7e3b856eacbd47c5.
  • 2026-09-04 live read of https://developers.stellar.org/docs/networks/software-versions shows Protocol 20 Phase 1 Mainnet Edition dated February 5, 2024
  • 2026-09-04 live read of the same page shows sibling headings Protocol 21 (Mainnet, June 18, 2024) and Protocol 22 (Mainnet, December 5, 2024), which use the Mainnet token for a network activation date
  • 2026-09-04 live read of the same page shows the February 5 entry lists Phase 0 Limits and Phase 0 Fees although its heading says Phase 1, while the separate February 27, 2024 entry lists Phase 1 Limits and Phase 1 Fees
  • 2026-09-04 live read of https://stellar.org/blog/developers/protocol-20-upgrade-guide says Mainnet upgraded to Protocol 20 on February 20 at 1700 UTC, and its key-date list records February 20 as the Protocol 20 Upgrade Vote plus Phase 0
  • eval/qa/results/2026-09-04T05-40-51-variantA.json row q-hist-soroban-launch-protocol20 treated the heading date as the Mainnet date and received a wrong verdict
  • .agents/rounds/2026-09-03-truth-maintenance/upstream-docs-findings-terra.md records the dated recheck
  • .agents/rounds/2026-09-03-truth-maintenance/upstream-docs-findings-review-opus.md records the independent review and this correction

Recommendation

Label February 5 as the applicable software-release date.
Record February 20 as the Protocol 20 Mainnet activation date for Phase 0.
Correct the February 5 heading, because it says Phase 1 but lists Phase 0 limits and fees.
Use distinct labels for software release and network activation.

Source Record

Raven recorded this finding as sd-051 (stellar-docs, discovered 2026-09-04).

Public source record: improvements/stellar-docs/sd-051-protocol-20-mainnet-heading-date.md

Immutable source snapshot: 8af90c173d8f

Resolution Handoff

When you deploy a fix, link the resolving issue or pull request to the source record.
Then notify Raven through:

https://github.com/stellar-experimental/stellar-raven/issues/new?template=upstream-improvement-ready.yml&title=%5Bupstream-ready%5D%20sd-051%3A%20

Include the finding ID and the resolving issue or pull request.
Include the deployed version or timestamp. Include the smallest live recheck.
Raven verifies the live surface before it sets the finding to fixed-upstream.
An issue closure or merged pull request does not prove the fix.
A separate reviewer repeats the live check before Raven retires the active finding.
Raven keeps a commit-pinned snapshot when one is available.

Activity

  1. added
    raven
    on Sep 9, 2026
  2. kaankacar commented on Sep 9, 2026

    @kaankacar
    Contributor

    🤖 Automated triage bot, acting for @kaankacar.

    Working this because it is a Raven-filed issue (label raven).

    Picked it up. I am checking the software-versions page and the Protocol 20 dates now.

  3. kaankacar commented on Sep 9, 2026

    @kaankacar
    Contributor

    🤖 Automated triage bot, acting for @kaankacar.

    Working this because it is a Raven-filed issue (label raven).

    Finding sd-051 is confirmed. PR #2845 is open.

    What I checked:

    • The SDF Protocol 20 Upgrade Guide, published 2024-02-20T17:00:00Z, says Mainnet upgraded on February 20 at 1700 UTC.
    • Stellar Core v20.2.0, the version in the February 5 table, was published 2024-02-05T20:44:03Z. February 5 is a software release date.
    • The sibling Mainnet token really is an activation date. Horizon shows pubnet ledger 63385000 still on protocol 26 and ledger 63387000 on protocol 27, both on 2026-07-08, which matches the "Protocol 27 (Mainnet, July 8, 2026)" heading.
    • The February 5 heading said Phase 1 while its own table lists Phase 0 limits and fees.

    The PR renames the heading to Phase 0, drops the Mainnet token, and records the February 20 activation date. It changes no other heading, so the page keeps its current convention.

    One thing for a maintainer to note: PR #2675 rewrites this same heading and keeps "Soroban Phase 1, Mainnet Edition". Whichever merges second needs a rebase.

  4. ElliotFriend commented on Sep 15, 2026

    @ElliotFriend
    Contributor

    Deployed and handed back to Raven for independent recheck: stellar-experimental/stellar-raven#162

    Fixed by #2845 (merge commit 0efbb055, 2026-09-15T19:38:13Z), deploy succeeded 19:43:23Z, corrected content observed live at 2026-09-15T19:56:26Z. All four parts of the recommendation shipped.

    Two deviations recorded in the handoff. The snapshot's components published across ten days (Stellar Core v20.2.0 on Feb 5, CLI v20.3.0 Feb 6, Environment v20.2.2 Feb 13, SDK v20.3.2 and RPC v20.3.1 Feb 14), so the text names Stellar Core explicitly rather than attributing the whole table to Feb 5. And the heading date moved to February 20 rather than staying on February 5 with a new label, which matches how the sibling Phase 1 and Phase 2 entries are dated and gives the page the Mainnet activation row it was missing.

    Anchor moved to #protocol-20-soroban-phase-0-mainnet-february-20-2024. Nothing in the repo referenced the old one and routes.txt carries no anchors, so no redirect was needed.

  5. kalepail commented on Sep 16, 2026

    @kalepail
    ContributorAuthor

    Raven independently verified this fix on September 16, 2026.

    The rendered page and the indexed Phase 0 section distinguish Mainnet activation from the software release. Mainnet activation occurred on February 20, 2024. The Core release date was February 5, 2024. The complete index read returned 159 sections. The incorrect Mainnet Edition heading is absent.

    A separate reviewer repeated the source and index checks.
    Raven will retire sd-051 after recording the resolution receipt.

    Original finding

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    raven

    Type

    No type

    Projects

    • Status
      No status

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions