Repository navigation
Description
Note
Automated notice: Stellar Raven filed this issue from its automated evaluation pipeline. The issue includes evidence and a public source record. Please verify the live surface before you act.
Finding
The software-versions page labels a February 5 entry as Mainnet Edition.
Sibling headings on the same page use the Mainnet token for a network activation date.
The Protocol 20 upgrade guide records Mainnet activation on February 20.
The candidate answer read February 5 as the activation date.
Evidence
On 2026-09-04, the history heading read Protocol 20: Soroban Phase 1 (Mainnet Edition) (February 5, 2024).
The same page headed later entries Protocol 21 (Mainnet, June 18, 2024) and Protocol 22 (Mainnet, December 5, 2024).
A reader therefore sees the Mainnet token beside a date and reads an activation date.
The official upgrade guide states that Mainnet upgraded on February 20 at 1700 UTC.
Its key-date list records February 20 as the Protocol 20 upgrade vote and Phase 0.
The same list records the Phase 2 network settings vote on March 19.
The February 5 entry also lists Phase 0 Limits and Phase 0 Fees.
Its heading still says Phase 1.
The separate February 27, 2024 entry lists Phase 1 Limits and Phase 1 Fees.
Additional recorded evidence:
- 2026-09-08 fresh stellar/stellar-docs main read reproduced the heading at commit db501fe; source SHA-256 012391ecd96a48be6a9b43fac27b60020a4625344d33e435cdaf2ed902e49a84. The current upgrade guide still states that Mainnet upgraded on February 20 at 1700 UTC; rendered SHA-256 9d7e329a1fafd371f262ce3052fae5553e3d8490e0312fdf7e3b856eacbd47c5.
- 2026-09-04 live read of https://developers.stellar.org/docs/networks/software-versions shows Protocol 20 Phase 1 Mainnet Edition dated February 5, 2024
- 2026-09-04 live read of the same page shows sibling headings Protocol 21 (Mainnet, June 18, 2024) and Protocol 22 (Mainnet, December 5, 2024), which use the Mainnet token for a network activation date
- 2026-09-04 live read of the same page shows the February 5 entry lists Phase 0 Limits and Phase 0 Fees although its heading says Phase 1, while the separate February 27, 2024 entry lists Phase 1 Limits and Phase 1 Fees
- 2026-09-04 live read of https://stellar.org/blog/developers/protocol-20-upgrade-guide says Mainnet upgraded to Protocol 20 on February 20 at 1700 UTC, and its key-date list records February 20 as the Protocol 20 Upgrade Vote plus Phase 0
- eval/qa/results/2026-09-04T05-40-51-variantA.json row q-hist-soroban-launch-protocol20 treated the heading date as the Mainnet date and received a wrong verdict
- .agents/rounds/2026-09-03-truth-maintenance/upstream-docs-findings-terra.md records the dated recheck
- .agents/rounds/2026-09-03-truth-maintenance/upstream-docs-findings-review-opus.md records the independent review and this correction
Recommendation
Label February 5 as the applicable software-release date.
Record February 20 as the Protocol 20 Mainnet activation date for Phase 0.
Correct the February 5 heading, because it says Phase 1 but lists Phase 0 limits and fees.
Use distinct labels for software release and network activation.
Source Record
Raven recorded this finding as sd-051 (stellar-docs, discovered 2026-09-04).
Public source record: improvements/stellar-docs/sd-051-protocol-20-mainnet-heading-date.md
Immutable source snapshot: 8af90c173d8f
Resolution Handoff
When you deploy a fix, link the resolving issue or pull request to the source record.
Then notify Raven through:
Include the finding ID and the resolving issue or pull request.
Include the deployed version or timestamp. Include the smallest live recheck.
Raven verifies the live surface before it sets the finding to fixed-upstream.
An issue closure or merged pull request does not prove the fix.
A separate reviewer repeats the live check before Raven retires the active finding.
Raven keeps a commit-pinned snapshot when one is available.
Activity
kaankacar commentedon Sep 9, 2026
🤖 Automated triage bot, acting for @kaankacar.
Working this because it is a Raven-filed issue (label
raven).Picked it up. I am checking the software-versions page and the Protocol 20 dates now.
kaankacar commentedon Sep 9, 2026
🤖 Automated triage bot, acting for @kaankacar.
Working this because it is a Raven-filed issue (label
raven).Finding sd-051 is confirmed. PR #2845 is open.
What I checked:
v20.2.0, the version in the February 5 table, was published 2024-02-05T20:44:03Z. February 5 is a software release date.The PR renames the heading to Phase 0, drops the Mainnet token, and records the February 20 activation date. It changes no other heading, so the page keeps its current convention.
One thing for a maintainer to note: PR #2675 rewrites this same heading and keeps "Soroban Phase 1, Mainnet Edition". Whichever merges second needs a rebase.
ElliotFriend commentedon Sep 15, 2026
Deployed and handed back to Raven for independent recheck: stellar-experimental/stellar-raven#162
Fixed by #2845 (merge commit
0efbb055, 2026-09-15T19:38:13Z), deploy succeeded 19:43:23Z, corrected content observed live at 2026-09-15T19:56:26Z. All four parts of the recommendation shipped.Two deviations recorded in the handoff. The snapshot's components published across ten days (Stellar Core
v20.2.0on Feb 5, CLIv20.3.0Feb 6, Environmentv20.2.2Feb 13, SDKv20.3.2and RPCv20.3.1Feb 14), so the text names Stellar Core explicitly rather than attributing the whole table to Feb 5. And the heading date moved to February 20 rather than staying on February 5 with a new label, which matches how the sibling Phase 1 and Phase 2 entries are dated and gives the page the Mainnet activation row it was missing.Anchor moved to
#protocol-20-soroban-phase-0-mainnet-february-20-2024. Nothing in the repo referenced the old one androutes.txtcarries no anchors, so no redirect was needed.kalepail commentedon Sep 16, 2026
Raven independently verified this fix on September 16, 2026.
The rendered page and the indexed Phase 0 section distinguish Mainnet activation from the software release. Mainnet activation occurred on February 20, 2024. The Core release date was February 5, 2024. The complete index read returned 159 sections. The incorrect Mainnet Edition heading is absent.
A separate reviewer repeated the source and index checks.
Raven will retire
sd-051after recording the resolution receipt.Original finding