I was thinking about it last weekend.
I still will not have any serious amount of time to work on a release. GAM is essentially finished as a mergable first version except for a few loose ends.
But personal/family time requirements are still large. My wife and I bought a house towards the end of summer that needed 3 or 4 months of repairs and renovation. We are moving during Christmas break.
GAM was 3 times as much work as I had expected plus organizing the home repairs and move took much more time than I had expected or hoped for.
The options are to either get a rush 0.10rc1 out with just the basic work necessary for a release, or delay the release to end of January, so I have at least 3 or 4 weeks to work on it.
We should have made a bug fix 0.9.1, because new versions always take longer than expected/planned.
In terms of wishful thinking, PRs that are close:
I have GAM, plus at least two PRs from the end of summer.
Kerby also has at least two PRs that need some review and maybe a bit of refactoring for the process PR.
Activity
josef-pkt commentedon Oct 19, 2018
I'm not sure.
I'm about a month behind in my work for statsmodels. So I would guess now that it will be more like end of November.
jbrockmendel commentedon Nov 28, 2018
Is this estimate still in the ballpark?
josef-pkt commentedon Nov 28, 2018
More likely the ball will be far out of the park.
I was thinking about it last weekend.
I still will not have any serious amount of time to work on a release. GAM is essentially finished as a mergable first version except for a few loose ends.
But personal/family time requirements are still large. My wife and I bought a house towards the end of summer that needed 3 or 4 months of repairs and renovation. We are moving during Christmas break.
GAM was 3 times as much work as I had expected plus organizing the home repairs and move took much more time than I had expected or hoped for.
The options are to either get a rush 0.10rc1 out with just the basic work necessary for a release, or delay the release to end of January, so I have at least 3 or 4 weeks to work on it.
We should have made a bug fix 0.9.1, because new versions always take longer than expected/planned.
In terms of wishful thinking, PRs that are close:
I have GAM, plus at least two PRs from the end of summer.
Kerby also has at least two PRs that need some review and maybe a bit of refactoring for the process PR.
jbrockmendel commentedon Nov 28, 2018
OK, well consider this the traditional/periodic offer to help. I'd be +1 on a 9.1 even if it were expected to be short-lived.
jbrockmendel commentedon Mar 17, 2019
ping on the offer to help with smaller, more regular/frequent releases.
bashtage commentedon Jun 8, 2019
The release candidate is now out. See #5845 for installation instructions.