Skip to content

spec(022): accept the stage 3 record and mark 022 complete - #443

Merged
bartekus merged 1 commit into
mainfrom
impl/022-complete
Nov 2, 2026
Merged

bartekus merged 1 commit into
mainfrom
impl/022-complete

Conversation

@bartekus

@bartekus bartekus commented Nov 2, 2026

Copy link
Copy Markdown
Contributor

Summary

Spec 022: the owner's acceptance of the stage 3 record, and 022 marked complete.

  • docs/decisions/00-founding-decisions.md: row A-72. The owner accepted, on 2026-11-01, the stage 3 record of A-68's binding (sha256:12897cdf..., direct transport, pin jev-1.14.0, rustev-jev-mapping/2) as the first Qualification under 3.7.5. It authorizes no deployment, real-user data, release or spend beyond R-29.
  • specs/022-jev-production-transport/spec.md: implementation: complete, plus a dated record paragraph. 3.7.5 landed in impl(022): production acceptance, stage 3 records and production construction #439, and with this acceptance every acceptance item holds.
  • .statecraft/derived: refreshed shards for the spec edit.

No code changes.

Verification

make gate, scripts/check-authored-content.sh.

@github-actions

github-actions Bot commented Nov 2, 2026

Copy link
Copy Markdown

AI review (no-findings)

Reviewing the two changed files against the governance context.

docs/decisions/00-founding-decisions.md — A-72

A-72 records the owner accepting the stage 3 record of A-68's binding as a Qualification under spec 022 §3.7.5. It follows exactly the pattern A-69 established: "Accepting the first one, for A-68's stage 3 binding, is a separate owner act" and "with the owner's authorization naming the decision row that accepted it." A-72 names itself as that authorization row, which is self-consistent with A-69's design.

The SHA-256 digest in A-72 (sha256:12897cdf3796818833af333769e913d1a1f65a267532ea4de2ec3b144fd40bd4) is 64 valid hex characters — well-formed for SHA-256.

The stated limits ("authorizes no deployment, real-user data, release or spend beyond R-29's caps, and production use stays the owner's separate acts (3.1.4)") mirror A-69's language and are consistent with spec 022 §3.1.4 as cited in the spec note.

specs/022-jev-production-transport/spec.md

The lifecycle transition from implementation: in-progress to implementation: complete is consistent with the contract table: approved + complete → settled (no longer schedulable, unresolved units are errors). The spec note establishes the preconditions: §3.7.5 code was implemented 2026-10-31 (before this PR), and the stage 3 record was accepted 2026-11-01 via A-72. "No code changes" from this PR is accurate — the PR only updates governance documents.

The spec note's cross-reference to A-72 and the claimed date (2026-11-01) are internally consistent with the decision entry added in the same PR.

No bugs, security problems, or governance inconsistencies found.

{"head": "4f4de24882f6fda7421644a06c2f4e63148f4230", "verdict": "no-findings", "findings": []}

Subject: 4bfa9f9...4f4de24, diff digest 42510e2955820c13a9743b9051f61553bc9e52179411d2c5017350f0691b8815, 1 call(s). An AI comment is not an approval.

@bartekus
bartekus added this pull request to the merge queue Nov 2, 2026
Merged via the queue into main with commit eee0855 Nov 2, 2026
30 checks passed
@bartekus
bartekus deleted the impl/022-complete branch November 2, 2026 05:10
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant