Repository navigation
spec(022): accepting stage 3 and constructing a production binding (A-69) - #409
Conversation
AI review (no-findings)Reviewing the two changed files for bugs, security problems, and internal inconsistencies.
A-69 describes amending spec 022 3.7.5 to define production acceptance. It explicitly states:
These are consistent with what 3.7.5 says in the spec.
3.7.5 is detailed and internally consistent:
Error-case table update: The removal of " Acceptance section update: Adding "a production binding is constructed only through 3.7.5" is consistent with the new construction path. Implementation record: Correctly marks the feature "Pending implementation" and repeats that this amendment accepts no record — consistent with A-69 and 3.7.5.1. No concrete defects found. {"head": "1e4ca53a1c018442f46f3100ae9b554d2653b80b", "verdict": "no-findings", "findings": []}Subject: 894e2cf...1e4ca53, diff digest b774645f4fed3618cb81281706f170d7ae9410e085527ed425632581f0f737b7, 1 call(s). An AI comment is not an approval. |
1e4ca53 to
2ee69b3
Compare
AI review (no-findings)Reviewing the two changed files for bugs, security problems, and internal inconsistencies. docs/decisions/00-founding-decisions.md — A-69 A-69 follows the pattern of prior amendment rows (A-66, A-67, A-68). It explicitly scopes itself: "This amendment accepts no record. Accepting the first one, for A-68's stage 3 binding, is a separate owner act." This is consistent with the spec text, which also says "Accepting the first record … is the owner's act in its own decision row; this amendment accepts none." specs/022-jev-production-transport/spec.md — 3.7.5 Key properties checked:
Scenario table change The old row "A stage 3 exchange's record | … No concrete defects found in the supplied evidence. {"head": "2ee69b37dac9c574a97dc551a2abc6f2d346989b", "verdict": "no-findings", "findings": []}Subject: b7984a4...2ee69b3, diff digest b774645f4fed3618cb81281706f170d7ae9410e085527ed425632581f0f737b7, 1 call(s). An AI comment is not an approval. |
Stacked on #402; retarget to
mainafter #402 merges. This drafts the "later change" that 3.7.4.4 leaves open: accepting a recorded stage 3 and constructing a production-eligible binding (A-69). No code changes.3.7.5
Qualificationthat passesQualification::checkat construction. It must name the binding's exact identity and carry a calls fact that is not stale, the owner's authorization naming its decision row, the dataset rule, and the report and spend references.production_eligibletakes that acceptedQualification. It holds only for aproduction,direct, pinned binding on the stage 2 direct mapping whose 3.4 facts pass for the day. The Gateway stays ineligible, because 3.3's evidence path is not delivered.JevBackend::new_productionbuilds only with the production journal (R-29's production cap), refusing before any credential lookup otherwise. It records the accepted record's digest asqualificationand keeps no bytes (R-19).check_production_plantakes the accepted qualifications.Section 5 gains the refusal rows, and Acceptance says a production binding is constructed only through 3.7.5.
A-69 records the owner's request and states that this amendment accepts no record. Accepting the first one, for A-68's stage 3 binding (recorded in #406), is a separate owner act. The implementation follows as
impl(022), together with spec 044's increment 8 if the owner wants both in one change.