Goal

Bring ToolHive fully up to date with the MCP specification: complete the migration to the official modelcontextprotocol/go-sdk without functional loss, close our remaining gaps against the current stable spec (2025-11-25), and be ready for the breaking 2026-07-28 "stateless" revision (RC locked 2026-05-21, final ships 2026-07-28).

Hard requirement: ToolHive supports both revisions simultaneously. 2025-11-25 clients, servers, and backends keep working unchanged while 2026-07-28 peers are served natively — per-request version discrimination, not a cutover. This matches the SDKs' model (go-sdk v1.7 / TS SDK v2 serve both on the same endpoint). vMCP additionally acts as a cross-generation bridge: a client on either revision can reach backends on either revision, with vMCP translating between server-initiated requests and MRTR, resources/subscribe and subscriptions/listen, and session-ful vs handle-based state (design in the stateless-vMCP and MRTR sub-issues).

Spec context

  • Stable revision is 2025-11-25. Our protocol ceiling is currently whatever our SDK negotiates.
  • 2026-07-28 removes sessions (Mcp-Session-Id), the initialize handshake (per-request _meta + required server/discover), ping, logging/setLevel, SSE resumability, and all server-initiated requests (replaced by MRTR); deprecates roots/sampling/logging and DCR (→ CIMD); moves Tasks to an extension; adds required Mcp-Method/Mcp-Name headers, W3C trace context in _meta, and ttlMs/cacheScope caching metadata. See the draft changelog and RC announcement.
  • SDK reality: go-sdk stable v1.6.1 targets 2025-11-25; v1.7.0-pre.1 targets 2026-07-28 (opt-in stateless). Ecosystem clients/servers will straddle both revisions for a long time — this is a dual-protocol effort, not a cutover.

Workstreams

A. Loss-free SDK migration (in flight)

The migration off mark3labs/mcp-go (#5729, via toolhive-core's mcpcompat shim) is the gateway to everything else. An audit found shim regressions; fixes and the test gate are tracked and must land so #5729 merges with zero functional loss.

B. 2025-11-25 compliance gaps

Verified gaps in the proxies, middleware, and vMCP against the current stable spec — mostly server→client message flows, pagination, prompts, and parser blind spots.

C. 2026-07-28 stateless readiness

Design work can start now; landing is gated on the spec going final and go-sdk v1.7 stabilizing. Freeze new investment in deprecated surfaces (roots, sampling, logging/setLevel, DCR, HTTP+SSE, SSE resumability); shape new work (e.g. elicitation/sampling passthrough) MRTR-first.

Ordering

  1. Workstream A gates everything (shim fixes → regression tests → feat: migrate from mark3labs/mcp-go to toolhive-core/mcpcompat (go-sdk) #5729 merges).
  2. Workstream B items are independent of each other; the streamable server→client channel unblocks the two list_changed items.
  3. Workstream C starts with go-sdk v1.7 adoption; parser vocabulary and telemetry items can proceed in parallel once the design lands.

Sub-issues below track the individual work items.

Expected follow-ups (not yet filed as issues)

These are identified and scoped but deliberately not opened yet — they become actionable only once the stateless design docs (#5755/#5756) land and the 2026-07-28 spec + go-sdk v1.7 go final. File them then (details preserved in the closed placeholders linked):

Generated with Claude Code

Sub-issues

Sub-issues

22 of 24 Issues completed
Loading 24 sub-issues

Activity

  1. added
    needs-triage
    on Jul 8, 2026
  2. 40 remaining items

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions