Skip to content

Qualify and approve the production committed-history cutover #2672

Description

@jbeda

Outcome

The committed-history kernel becomes the production session authority only after the assembled system proves trustworthy reload/continuation, safe execution and explicit recovery, with an approved and documented deployment boundary.

Parent: #2659. This is the outcome's integration/acceptance story, not permission to cut over now.

Scope

Integrate the independently delivered session, execution, storage/ownership, logical model continuation, governance, shared controls, authorized load/follow, and delegation work. Qualify server/client behavior and the chosen deployments. Present compatibility and operational decisions for explicit approval before activation.

Acceptance

  • One authoritative committed history drives production continuation and authorized views; snapshots/checkpoints/activity feeds remain derived or explicitly provisional, not competing sources of truth.
  • End-to-end tests demonstrate complete logical-input fidelity, required execution gates, shared controls, gap-free authorized reload/follow, registered delegation reconstruction, and interrupted/unknown-effects recovery.
  • Restart/fault/ownership-loss and malicious/stale-client cases cover the actual production storage, factory, server and client boundaries; backend durability/fencing claims match evidence.
  • Go source, wire, capability/version, stored-data, and deployment compatibility assessments identify affected consumers and secure explicit approval for breaks before implementation/activation.
  • Concrete release/deployment instructions and support decisions preserve the agreed distinct-namespace, fail-closed cutover intent: legacy bytes are untouched, with no implicit migration/fallback/dual-write/mixed-version compatibility. Any change to that intent is separately approved.
  • First-cutover feature coverage and any deliberate removals/deferrals are explicit; no silent safety or product regression is hidden behind the new runtime.
  • Required local/CI integration gates, relevant real-deployment evidence, operator workflows and owning documentation are complete; human approval for cutover is recorded separately from code merge.
  • Committed session history and execution kernel #2659 is closed only when its production completion criteria are actually satisfied, not because an infrastructure PR merged.

Dependencies and boundaries

Depends on the other delivery stories under #2659. Plan concrete integration and release steps after their contracts are qualified; do not invent versions, deployment dates, or a runtime-selection framework now. Planned compatible-replica active-tree handoff, autonomous continuation, cross-run background work, historical forks/rewind, and networked extensions remain later capabilities. Filing or completing code for this story does not authorize a merge, release, deployment, data deletion, or cutover.

Design context: first cutover versus later destination.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

No labels
No labels

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions