Repository navigation
Description
Outcome
The committed-history kernel becomes the production session authority only after the assembled system proves trustworthy reload/continuation, safe execution and explicit recovery, with an approved and documented deployment boundary.
Parent: #2659. This is the outcome's integration/acceptance story, not permission to cut over now.
Scope
Integrate the independently delivered session, execution, storage/ownership, logical model continuation, governance, shared controls, authorized load/follow, and delegation work. Qualify server/client behavior and the chosen deployments. Present compatibility and operational decisions for explicit approval before activation.
Acceptance
- One authoritative committed history drives production continuation and authorized views; snapshots/checkpoints/activity feeds remain derived or explicitly provisional, not competing sources of truth.
- End-to-end tests demonstrate complete logical-input fidelity, required execution gates, shared controls, gap-free authorized reload/follow, registered delegation reconstruction, and interrupted/unknown-effects recovery.
- Restart/fault/ownership-loss and malicious/stale-client cases cover the actual production storage, factory, server and client boundaries; backend durability/fencing claims match evidence.
- Go source, wire, capability/version, stored-data, and deployment compatibility assessments identify affected consumers and secure explicit approval for breaks before implementation/activation.
- Concrete release/deployment instructions and support decisions preserve the agreed distinct-namespace, fail-closed cutover intent: legacy bytes are untouched, with no implicit migration/fallback/dual-write/mixed-version compatibility. Any change to that intent is separately approved.
- First-cutover feature coverage and any deliberate removals/deferrals are explicit; no silent safety or product regression is hidden behind the new runtime.
- Required local/CI integration gates, relevant real-deployment evidence, operator workflows and owning documentation are complete; human approval for cutover is recorded separately from code merge.
- Committed session history and execution kernel #2659 is closed only when its production completion criteria are actually satisfied, not because an infrastructure PR merged.
Dependencies and boundaries
Depends on the other delivery stories under #2659. Plan concrete integration and release steps after their contracts are qualified; do not invent versions, deployment dates, or a runtime-selection framework now. Planned compatible-replica active-tree handoff, autonomous continuation, cross-run background work, historical forks/rewind, and networked extensions remain later capabilities. Filing or completing code for this story does not authorize a merge, release, deployment, data deletion, or cutover.
Design context: first cutover versus later destination.
Activity