Part of #189. Phase 3a of the scheduled-tasks feature. Depends on Phase 2a (the wire service). ## Scope Interactive schedule management in the TUI. - **`/schedule` slash command** — peer of `/agents`, `/team`. Create/list/inspect/pause/resume schedules from the composer. - **Schedule overlay** — a panel listing schedules with status (next fire, last fire, enabled), mirroring the existing overlay patterns. - **NL-time entry in the composer** can compile to cron client-side (deferred to v2 — see the Deferred subissue; Phase 3a is raw cron + one-shot entry). ## References - Design: #189 (mecatui section), ADR 0059. - Phase 1 foundation: #211. - Depends on: Phase 2a (the wire service).
Activity
feat(mecatui): scheduled tasks Phase 3a — /schedule slash command + o…
feat(mecatui): scheduled tasks Phase 3a — /schedule slash command + o…