Skip to content

Scheduled tasks — Phase 3a: mecatui /schedule slash command + overlay #234

Closed

Description

@JAORMX

Part of #189. Phase 3a of the scheduled-tasks feature. Depends on Phase 2a (the wire service).

Scope

Interactive schedule management in the TUI.

  • /schedule slash command — peer of /agents, /team. Create/list/inspect/pause/resume schedules from the composer.
  • Schedule overlay — a panel listing schedules with status (next fire, last fire, enabled), mirroring the existing overlay patterns.
  • NL-time entry in the composer can compile to cron client-side (deferred to v2 — see the Deferred subissue; Phase 3a is raw cron + one-shot entry).

References

Activity

  1. added
    enhancement
    on Jul 3, 2026
  2. added
    tui
    on Aug 13, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementtuiui

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions