Skip to content

Job harness: pin a program -> IDCAMS -> subprograms chain runs in JCL order (Part of #8884) - #9077

Merged
squid-shepherd[bot] merged 1 commit into
mainfrom
churn/8884-20261123T0136Z
Nov 23, 2026
Merged

squid-shepherd[bot] merged 1 commit into
mainfrom
churn/8884-20261123T0136Z

Conversation

@squid-protocol

Copy link
Copy Markdown
Owner

Part of #8884.

Checklist: done [c:f54b8777]

What

The CREASTMT job case that mixes SORT, IDCAMS and a subprograms step in JCL order is already on main (#9071, carddemo-job-creastmt-padded, with its real GnuCOBOL + Java e2e test and pin test in test_equivalence_job_subprograms_e2e_8884.py). CardDemo's own deck stays a declared ICE043A stop at STEP010 (#9069), which is the IBM-correct outcome.

This PR adds the missing no-Docker unit pin for the same mechanism: test_a_program_idcams_then_subprograms_chain_runs_in_jcl_order_with_the_subprograms_on_both_sides in test_equivalence_job_4268.py. A program step, an IDCAMS step and a subprograms step run in declared order, the later step reads the IDCAMS output, and both the COBOL and Java sides are handed the step's subprograms.

Class / Sibling gaps

Class: a job case that mixes step kinds (program, lowered SORT, IDCAMS, program with subprograms) runs them in declared JCL order. Members: IDCAMS between program steps (tested already), a subprograms step (tested already), SORT then subprograms (e2e, #9011), the padded CREASTMT chain (e2e, #9071), and now the three-kind chain (this PR). Sibling gaps: L5 det-mutation run for carddemo-sort-creastmt-padded is still mutation-pending (not this item); Db2, IMS and CICS steps in a job stay refused by name, and no burned program here needs them.

Evidence / gates

  • test_equivalence_job_4268.py: 53 passed (system python3).
  • The changed test file passes the pinned ruff format --check.
  • NOT run: pr_gates --fast / --ratchets and the EQUIVALENCE_E2E=1 real run. The worker box had no gate venv (no GG_PY, no venvs/ dir); CI will run the gates.

🤖 Generated with Claude Code

@squid-protocol squid-protocol added the shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md label Nov 23, 2026
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

@squid-shepherd
squid-shepherd Bot marked this pull request as ready for review November 23, 2026 01:40
@squid-shepherd
squid-shepherd Bot enabled auto-merge (squash) November 23, 2026 01:40
@squid-shepherd
squid-shepherd Bot merged commit 8b14fc5 into main Nov 23, 2026
61 checks passed
@squid-shepherd
squid-shepherd Bot deleted the churn/8884-20261123T0136Z branch November 23, 2026 01:57
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant