Repository navigation
progress slide: external vs internal estates, L4 highlighted, below-L4 stance, Open World level build (Part of #7065) - #7699
Conversation
…4 stance, Open World level build (Part of #7065) Owner request 2026-11-04: with the L1-L4 ladder finished, the "where we stand" slide now - highlights L4+ as its own hero tile (five tiles: L1, L2, L4, L5, CICS commands); - drops the per-level count table: one-line, larger legend, full-width bars, an "N / M at L4+" cell per row; - splits the ladder into external estates (burned, the headline totals) and internal estates (cics-crucible, the estate crucible), kept out of every total; - names every burned program below L4 with its ruling (source defect, refused by design, owner hold, or the report's next step), so a refusal reads as a stance, not a dropped program; - adds a card per Open World level (Batch Badlands, Alternate Index Archipelago, Warlords of the Message Seas, The Hierarchy Keep): built % = planned constructs whose horrors are all in the pinned baseline, horrors and passes at the pin, first-time run date once recorded. New tests/estate_crucible/levels.json holds each level's planned constructs (from #7065 and the level docs), mapped to merged horror ids only; a test refuses a half-pinned construct. ladder_exclusions gains short reasons and HELD_BELOW_L4 (BANKDATA: its last branch outcome is reachable per #7577's z3 check, owner skip 2026-10-30). Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
No description provided. |
…wner ruling); test uses a synthetic hold Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
CI shepherd: the head of this PR (dd5c24e) is not the one a maintainer labelled |
Pull request was converted to draft
|
No description provided. |
…in three matching bands (Part of #7065) Owner request 2026-11-04 after four reviews of the slide (a data-viz designer, a skeptical buyer, an evidence auditor, a story editor), merged where they agree and the owner's direction where they don't: - Order: header with the GnuCOBOL / not-z/OS caveat in plain words -> the six steps defined once -> four program tiles (L4 the hero) -> results ladder -> results by age of code -> planted bugs (L5) -> what the translator can do -> how faithful the runtime is -> work done. Section titles are computed claims ("Results: 125 of 129 ..."). - Ladder: one panel, three bands of the same geometry: real codebases (with the "not at every branch yet, each named" box right under them and a computed "net of N reviewed infeasible / undefined by IBM" line), our CICS test suite, and our Open World practice codebases as L0 bars ("being built: 12 of 20 planned constructs, 60% of our plan"; "first run pending"). Level horror counts are per level (27 of 27), not the crucible's 88 of 90. - Honesty: no "blind" for our own levels; "proved sort cases" -> "sort equivalence cases"; "none needed" -> "0 claimed"; a stale level (L4*) now counts at its level and is reported, not dropped; issue counts are labelled activity, not evidence; plain names for the milestones and the runtime rule families. - Colour: ladder hues mean a ladder level only; every other bar is one neutral ink; the runtime status palette no longer reuses ladder hues and its two warm statuses are no longer neighbours. - levels.json carries members_at_pin (COBOL programs / JCL jobs per level app at the pin); a test checks them against the pinned estate-crucible key when a clone is present. Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
Round 3 pushed at 0e2f075 (owner request 2026-11-04): one story top to bottom after a four-way review (data-viz designer, skeptical buyer, evidence auditor, story editor). The internal estates now sit in the same ladder as the real codebases, in three bands of the same geometry; the Open World levels are L0 bars with 'being built: N of M planned constructs (x% of our plan)'. See the commit message for the full list. Tests: 61 slide/report tests + 194 related tool tests pass; ruff audit clean. |
|
No description provided. |
|
CI shepherd: the head of this PR (0e2f075) is not the one a maintainer labelled |
Pull request was converted to draft
|
No description provided. |
|
No description provided. |
|
No description provided. |
… corpora (Part of #7065) (#7707) Owner 2026-11-04 (follow-up to #7699): show how big the real codebases are and how much of their JCL the step-flow reader covers. - tests/tools/estate_size.py measures, per burned estate: the ladder's programs and their lines, the copybooks they COPY / EXEC SQL INCLUDE and those members' lines, JCL members, jobs job_flow reads with a step, jobs whose flow depends on COND / IF, and jobs with IBM-based run / bypass answers. The docs run has no corpus, so the numbers are recorded in tests/fixtures/estate_size.json (`estate_size.py CORPORA --write`); test_estate_size.py re-counts and compares wherever the corpora are present, and checks the counters on small inputs. - The slide's real-codebase rows carry a size line (e.g. "30k lines · 72 copybooks · 55 jobs"; all six: 76k lines, 116 copybooks, 143 jobs). The capability ledger gains "JCL in the real codebases": 143 jobs read in 213 JCL members, 18 depend on COND / IF, 8 of them answer-checked (CardDemo). Stacked on #7699. Co-authored-by: Claude Opus 5.5 <[email protected]>
|
CI shepherd: the head of this PR (b573e4d) is not the one a maintainer labelled |
Pull request was converted to draft
|
No description provided. |
1 similar comment
|
No description provided. |
|
PR #7699 @ b573e4d: 8 failed check(s) == db2 ${{ matrix.shard }} (cancelled) -- infra == full-suite (failure) -- real == full-suite part ${{ matrix.group }}/${{ needs.shard-plan.outputs.splits }} (cancelled) -- infra == full-suite part 2/2 (failure) -- real == publish-history (cancelled) -- infra == shard ${{ matrix.shard }} (cancelled) -- infra == store the suite's durations (cancelled) -- infra == suite time budget (#5166) (cancelled) -- infra |
…d estate_size changes Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
CI shepherd: the head of this PR (090d894) is not the one a maintainer labelled |
|
No description provided. |
3 similar comments
|
No description provided. |
|
No description provided. |
|
No description provided. |
Owner request 2026-11-04 (relayed from the owner's session): reshape the COBOL-to-Java "where we stand" slide now that the L1-L4 ladder is done.
What changes on the slide
level · programslabels, and each row ends inN / M at L4+.Where the numbers come from
tests/estate_crucible/levels.json(new): each level's planned constructs, from Open World level estates: build each region's estate-crucible before its support (Batch Badlands first) #7065 and the estate-crucibledocs/levels/*.mdremaining lists, mapped to merged horror ids only. A construct counts as built when all of its horrors are intests/estate_crucible/baseline.json, i.e. at the pinned release. At v0.6.0 that gives 60% / 54% / 57% / 0%.test_the_committed_level_plan_names_only_pinned_or_merged_horrorsrefuses a half-pinned construct.first_runwhen the first-time run is recorded.ladder_exclusions.py:shortreasons for the slide, plusHELD_BELOW_L4for BANKDATA. BANKDATA's line-917 outcome needs 100 failed random draws in a row; tools: branch_solver -- z3 checks the stated infeasible outcomes (211 of 555 confirmed) (#4175) #7577's z3 check shows it reachable, so 92cc4cb removed its infeasible entry (L4 to L3); owner skip since 2026-10-30.summarize()is unchanged, so BANKDATA is not counted as unreachable.Checks
pytest tests/tools/test_progress_slide.py tests/tools/test_progress_report.py tests/tools/test_unreachable_programs_5280.py: 60 passed.python tests/ruff_audit.py --ci: no new findings.ruff format --checkclean.🤖 Generated with Claude Code