Skip to content

CSUTLDTC: CEEDAYS arms 2507/era/bad-picture/year-zero stated infeasible; month 2508-vs-2517 owner question (Part of #6967) - #6996

Merged
squid-shepherd[bot] merged 1 commit into
mainfrom
churn/6967-20261029T0955Z
Oct 29, 2026
Merged

squid-shepherd[bot] merged 1 commit into
mainfrom
churn/6967-20261029T0955Z

Conversation

@squid-protocol

Copy link
Copy Markdown
Owner

Part of #6967.

Checklist: partial [c:5981f543] -- CSUTLDTC diagnosed and its closable arms stated; the month arm and WHEN OTHER wait on an owner ruling; CODATE01 / COACCT01 / CBPAUP0C remainders not touched.

What

CSUTLDTC (carddemo-dateutil) runs 4 of 10 EVALUATE outcomes over the CEEDAYS feedback token (valid, 2508, 2513, 2520). Diagnosis of the 6 open:

outcome status why
2507 insufficient data stated infeasible (G) modelled in Ceedays.java / ceedays.c, but the date is always the 10-byte LS-DATE and the longest modelled span is 10
invalid era (2509) stated infeasible (G) needs an era picture; every caller passes a constant numeric picture, the oracle refuses era pictures by name
bad picture string (2518) stated infeasible (G) callers pass constant valid pictures; unmodelled pictures are refused (exit 98), never answered
year-in-era zero (2521) stated infeasible (G) era picture only; Gregorian year 0000 is 2513 (taken)
invalid month (2517) OPEN, owner question see below
WHEN OTHER OPEN no modelled condition returns an unlisted token

Callers checked in the CardDemo corpus: COTRN02C and CORPT00C pass 'YYYY-MM-DD', CSUTLDPY passes 'YYYYMMDD', all from constants.

Owner question (not guessed): for a numeric month outside 1-12 with YYYY-MM-DD (e.g. 2022-13-01), does CEEDAYS return CEE2EC (2508, date value not valid) or CEE2EL (2517, month not recognized)? IBM's documentation does not settle it (register L1). COTRN02C and CORPT00C do not check the month first, so a caller can reach it. The model keeps refusing it; a ruling lets a scenario and the runtime close the arm.

CODATE01 does not call CEEDAYS; its 2 open arms are MQ close faults (sibling gap).

Class / Sibling gaps

Class: CEEDAYS feedback conditions the oracle model and det runtime do not return, as CSUTLDTC's EVALUATE sees them. All members handled or stated except the following. Sibling gaps: numeric month outside 1-12 (2508 vs 2517) and WHEN OTHER in CSUTLDTC (owner ruling; carddemo-dateutil); CODATE01 MQ close-fault arms (2 outcomes, MQ fault injection, not CEEDAYS).

Assumptions stated

Infeasible entries rest on the callers' constant pictures and the fixed 10-byte date; they are reviewed assumptions of the proof, not IBM facts. No model or runtime change; no loosened proof.

Tests / gates

New test_carddemo_dateutil_outcomes_6967.py (open arms pinned, stated arms cite message number and pictures). test_det_ceedays.py, test_infeasible_outcomes.py, test_evidence.py pass. pr_gates --fast 9/9 and --ratchets 9 pass, 0 skipped. No golden bless (no engine change). Hand-written files: 3.

Remaining slices

After the owner ruling: month scenario plus Ceedays.java / ceedays.c / test_det_ceedays.py change (3-4 files).

🤖 Generated with Claude Code

…le; month 2508/2517 left as owner question (Part of #6967)

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@squid-protocol squid-protocol added the shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md label Oct 29, 2026
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

@squid-shepherd
squid-shepherd Bot marked this pull request as ready for review October 29, 2026 10:11
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant