Repository navigation
CI: equivalence-e2e post-merge trigger on main, planned from pushed files (Part of #5954) - #6661
Conversation
…he pushed files (Part of #5954) Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
No description provided. |
|
No description provided. |
|
PR #6661 @ f122936: 1 failed check(s) == full-suite part 2/3 (failure) -- real |
…rt of #5954) Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
CI shepherd: the head of this PR (5533851) is not the one a maintainer labelled |
Resolve equivalence-e2e: keep the post-merge push run and tested-tree gate beside main's 3 shards, shard selection and db2 plan (#6664); the planner plans a push like a PR; tested-tree joins the draft-gate exemptions. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Part of #5954, slice 4 (after #6549): the post-merge trigger. The nightly
schedulealready existed; a merge to main never ran the E2E tests until the next night.Changes
equivalence-e2e.yml:push: branches: [main]. The plan job lists the files the push brought in (compare APIbefore...sha, whole or not at all, 300-file cap) and hands them to the planner, so a docs-only merge starts no shard and the check reports success.cancel-in-progressis now PR-only, so a later merge does not cancel the run that checks the earlier one.equivalence_e2e_plan.py:pushis planned from its files like apull_request(no list or any doubt still meansrun); nightly and manual still always run.test_equivalence_e2e_plan.py: push plans none/run/fail-open; the workflow has the push trigger and PR-only cancel.docs/ci_env_gated_tests.mdupdated.tested-treegate (fix round): a workflow on a PR and a main push needs the gate (test_the_gate_is_exactly_where_a_pr_run_can_prove_a_push). Added the job (push only),planwaits on it,shard/db2skip when it proves the tree, the aggregator accepts all-skipped whenskip=true. A merge whose PR run already passed on the same tree costs no runner. Pinned intest_tested_tree_workflows.py;docs/ci.mdupdated.Owner approval
This PR edits
.github/workflows/equivalence-e2e.ymland the queue item carried noallow_workflows: it needs the owner's OK before merge (the change is the whole point of the slice, so it was not dropped).Cost (ci-workflows.md rule 5)
Not measured: no replay run. Estimate: a push runs only for merges touching the COBOL / mainframe / equivalence area, the same share as PRs that run the shards today (the PR plan); a main run is one set of 3 shards + 1 db2 job per such merge, serialized by the concurrency group (non-cancelling). Replay over the last ~50 merged PRs was not done.
Class / Sibling gaps
Class: env-gated tests no workflow runs (#5954). This slice: the post-merge trigger for equivalence-e2e.yml.
Sibling gaps: the
tests/cics_crucible/test_det_port_bytes_4965.pyCICS_CRUCIBLE_PATHgating in cics-crucible.ymlrunner-tests(not checked here; slice 1/2 status in the issue); main-push replay measurement of runner-minutes.Remaining slices: replay-measure runner-minutes per main push; confirm first main run's step summary.
Tests:
pytest tests/tools/test_equivalence_e2e_plan.py test_env_gated_tests_run_in_ci_5954.py test_change_classifier.py test_sweep_plan.py157 passed.pr_gates.py --fast: 7/7 pass. Not run locally: the workflow itself (YAML parses),--ratchets, the full guard list.🤖 Generated with Claude Code